ESC16-00936
| General Inspection | 8/2/2017 | 8/2/2017 | 8/7/2017 10:41:33 AM | | CANC |
|
|
|
ESC16-01167
| General Inspection | 8/2/2017 | 8/2/2017 | 8/4/2017 4:59:47 PM | | CANC |
|
|
|
ESC16-01189
| General Inspection | 8/2/2017 | 8/2/2017 | 8/4/2017 1:04:30 PM | A | PEND |
|
|
No trackout off site to Preece or Emerald. Interior still needs additional sweeping. Trash has been serviced.
Notified Summit Development that operator does not appear to have an "active" NOI for the CGP 2017 coverage.
|
ESC17-00617
| General Inspection | 7/21/2017 | 8/2/2017 | 8/3/2017 12:45:45 PM | A | PASS |
|
|
No activity at time of inspeciton. No violations observed, clean site.
|
ESC16-00953
| General Inspection | 8/2/2017 | 8/2/2017 | 8/3/2017 12:27:26 PM | | PASS |
|
|
Home near completion. Yard not yet landscaped. BMPs still installed, no violations.
|
ESC16-01567
| General Inspection | 8/2/2017 | 8/2/2017 | 8/3/2017 10:43:27 AM | | PASS |
|
|
Home complete, occupied, and landscaped. No temporary BMP removal required. Active projects on Horsethief in good conditions. ESC permit finaled.
|
ESC16-00989
| General Inspection | 8/2/2017 | 8/2/2017 | 8/3/2017 10:35:20 AM | | PASS |
|
|
WIP on interior and exterior finish. Storm drain inlet protection is in good conditions. Hillside below home has some volunteer vegetation but is not yet stabilized. No sediment runoff or discharges observed.
|
ESC16-01561
| General Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 3:38:31 PM | | CANC |
|
|
|
ESC16-00946
| Aging Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 3:38:08 PM | | CANC |
|
|
|
ESC16-01269
| Aging Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 3:37:55 PM | | CANC |
|
|
|
ESC17-00347
| General Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 1:52:25 PM | P | PASS |
|
|
WIP on foundation excavation and removal of unsuitable/contanimated soils to designated dump sites.
Water truck onsite for fugitive dust control, construction entrance installed, surrounding storm drains (MS4 & onsite) have sediment filters installed. Site also inspected by 3rd Party SWPPP inspector from Terracon, who was onsite inspecting with RPR Ron.
|
ESC16-01098
| General Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 1:23:59 PM | P | PASS |
|
|
|
ESC13-01279
| General Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 1:23:38 PM | | CANC |
|
|
|
ESC17-00513
| General Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 1:23:24 PM | P | PASS |
|
|
No fugitive dust observed. Water truck and onsite filling station in use. No trackout to Fort Street. Site perimeter is clean. Approved.
|
ESC16-01654
| DOC - Permit Finaled | 8/2/2017 | 8/2/2017 | 8/2/2017 1:22:46 PM | P | PASS |
|
|
|
ESC04-00016
| DOC - Permit Finaled | 8/2/2017 | 8/2/2017 | 8/2/2017 1:13:27 PM | P | PASS |
|
|
old expired permit closed out, no inspection
|
ESC03-01535
| DOC - Permit Finaled | 8/2/2017 | 8/2/2017 | 8/2/2017 1:12:22 PM | P | PASS |
|
|
old expired permit closed out, no inspection
|
ESC17-00528
| General Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 11:54:14 AM | P | PASS |
|
|
WIP on final landscaping. DI bag installed at northeast corner of site on Oakland will need to be removed. Staging across street is for the Oakland apartments project. No corrections requested.
|
ESC16-00269
| Site Final | 8/2/2017 | 8/2/2017 | 8/2/2017 11:52:16 AM | P | PASS |
|
|
Disturbed area is now stabilized and vegetated. No construction activity occuring. ESC permit finaled.
|
ESC16-01145
| Site Final | 8/2/2017 | 8/2/2017 | 8/2/2017 11:51:37 AM | P | PASS |
|
|
Home complete and landscaped. BLD finaled. Two adjacent homes in progress to the north. No violations. ESC permit finaled
|
ESC16-01282
| Aging Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 11:50:28 AM | | CANC |
|
|
|
ESC16-01115
| Aging Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 11:49:56 AM | | CANC |
|
|
|
ESC16-01438
| General Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 11:49:40 AM | | CANC |
|
|
|
ESC16-01113
| Aging Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 11:49:08 AM | | CANC |
|
|
|
ESC15-01138
| General Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 11:48:44 AM | P | PASS |
|
|
Foundation and frame complete. Work remains on exterior and interior and site is not landscaped. Fence and vegetataion as well as grading has prevent sediment runoff to downhill neighbors. No loose trash or spills observed. Posted a new ESC permit sign
|
ESC16-00625
| General Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 11:47:14 AM | | PART |
|
|
WIP on backfilling foundation . Vegetative barrier at bottom of lot prevent sediment runoff to downhill neighbor. Posted new ESC permit sign. Stockpile of backfill soil placed on sidewalk with potential to runoff downhill. Needs to be moved onsite before end of week.. No discharges or trash violations.
|
ESC16-01483
| Site Final | 8/2/2017 | 8/2/2017 | 8/2/2017 11:17:20 AM | A | PASS |
|
|
Parking lot project complete. All loose materials swept. No temporary BMPs left on or around site. ESC permit conditions satisfied.
|
ESC16-01580
| General Inspection | 7/18/2017 | 8/2/2017 | 8/2/2017 10:17:56 AM | P | PASS |
|
|
Vertical construction and interior work occuring. Perimeter is clean and silt fence installed with wire fence. MS4 on Emerald has inlet protection. No dust, windblown trash, or trackout observed at time of inspection.
|
ESC16-00676
| General Inspection | 7/18/2017 | 8/2/2017 | 8/2/2017 9:54:05 AM | P | PASS |
|
|
WIP. Permit sign posted on job trailer. No trackout or discharges. Trash contained. Onsite storm drains have inlet filter bags as well as MS4 inlets on Denton and Curtis. No corrections requested.
|