ESC19-00241
| General Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 3:08:51 PM | P | PASS |
|
|
Construction entrance installed. No trackout. NO fugitive dust. No corrections requested.
|
ESC18-00946
| General Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 3:02:02 PM | | PASS |
|
|
No activity. Slope has volunteer vegetation growing. No dirt leaving site.
|
ESC18-01163
| General Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 2:59:33 PM | | FAIL |
|
|
Dumped concrete washout on upper lot. Either from pool or home below.
|
ESC19-00371
| General Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 1:57:51 PM | P | PASS |
|
|
WIP. Construction entance installed, work within the clearing limits and silt fence perimeter. Dust control trucks onsite. Walk through inspection scheduled for next week.
|
ESC19-00076
| General Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 1:56:41 PM | P | PASS |
|
|
WIP on pouring slabs and vertical CMU work. Concrete washout pans are staged around the site and in use. RP on duty at time of inspection. Permit signs posted, no trackout, discharges, or blowing fugitve dust.
Correction request to make a mortar mixing station containment area and to refresh south construction entrance next week.
|
ESC19-00506
| Site Preparation | 8/1/2019 | 8/2/2019 | 8/2/2019 1:15:33 PM | A | PEND |
|
|
Site not yet in full compliance. Dewatering plan submitted per NOV issued.
Approved to dewater into onsite retention and infiltration pond. Pond level must be monitored and then shut when personnel leave site.
New rock construction entrance installed off Castle, gutters swept and DI bags changed on Pierce Park, permit sign posted.
Corrections remaining:
- Pierce Park work area needs another sweeping. - Pay fines
Follow up scheduled.
|
ESC18-00429
| General Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 12:54:16 PM | | PASS |
|
|
|
ESC19-00055
| Site Final | 8/2/2019 | 8/2/2019 | 8/2/2019 11:43:43 AM | P | PASS |
|
|
Home landscaped and cleaned. No temp. BMPs. permit finaled.
|
ESC18-01338
| General Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 11:42:12 AM | P | PASS |
|
|
Permit posted. No trackout or other issues observed. Will need to watch for construction entrance as it is a flag lot with long access.
|
ESC18-01058
| Aging Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 10:29:54 AM | | CANC |
|
|
|
ESC18-00497
| General Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 10:29:34 AM | | CANC |
|
|
rescheduled for site final
|
ESC18-01125
| Aging Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 8:17:20 AM | | DEFR |
|
|
inspected by BLD inspector
|
ESC18-01137
| Aging Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 8:16:06 AM | | CANC |
|
|
permit expired. backyard pool installed
|
ESC18-01137
| DOC - Permit Finaled | 8/2/2019 | 8/2/2019 | 8/2/2019 8:15:47 AM | P | PASS |
|
|
|