Inspections for the day of: Monday, August 20, 2018.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00306 ESC-Conference8/17/20188/20/20188/24/2018 12:38:56 PMAFAIL
Contractor did not respond to VM or get permit for work at Boulder Heights booster station
ESC18-00863 BMP Violation8/17/20188/20/20188/21/2018 1:35:05 PMAFAIL
No clean up performed.

Verbal correction to RP to:
-sweep gutter and sidewalk
- install sediment protection on storm drain just west of site at Stop sign.

RP John stated they will do it tomorrow. Follow up scheduled for Thursday PM.
ESC18-00866 BMP Violation8/17/20188/20/20188/21/2018 1:34:51 PMAFAIL
No clean up performed.

Verbal correction to RP to:
-sweep gutter and sidewalk
- install sediment protection on storm drain just west of site at Stop sign.

RP John stated they will do it tomorrow. Follow up scheduled for Thursday PM.
ESC15-00306 General Inspection8/20/20188/20/20188/20/2018 4:26:22 PM CANC
rescheduled
ESC18-00893 BMP Violation8/17/20188/20/20188/20/2018 4:25:57 PMPPEND
follow up inspection

Site currently inactive. No new violations. Will continue to monitor and check for additional BMP installation.
ESC17-00406 General Inspection8/17/20188/20/20188/20/2018 2:57:53 PMAPASS
No trackout from site to 9th or 10th. Stockpiles stored within center of site. No corrections requested
ESC16-01457 Complaint Inspection8/20/20188/20/20188/20/2018 2:45:08 PMPPEND
No significant new cuts into hillside as reported. Rock being placed, parcel owner has been permitted with ACHD for the access drive. Storm drain has sediment protection. Will follow up with owner to make sure slopes will have erosion controls and vegetative stabilization.
ESC12-00403 General Inspection8/20/20188/20/20188/20/2018 2:35:38 PM PASS
All construction on site at Jump is complete, exterior surfaces stabilized and cleaned, DI bags removed.

Okland Construction is now using the staging yard and laydown area east of 13th, formerly JUMP parking and concrete washout. Will notify them to control trackout and dust in this area, see ESC18-00529
ESC13-00524 General Inspection8/20/20188/20/20188/20/2018 10:23:14 AM PASS
ESC18-00652 Site Preparation8/16/20188/20/20188/20/2018 8:06:48 AMACANC