Inspections for the day of: Tuesday, August 20, 2019.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01790 Site Final8/19/20198/20/20198/23/2019 11:17:06 AMPCANC
ESC19-00324 Site Preparation8/19/20198/20/20198/20/2019 5:32:38 PMAPASS
Site preparation inspection post-SWO.

Corrections made:
- investigation and re-inspection fee paid
- construction entrance installed
- updated SWPPP/ESC site map provided
- silt fence perimeter controls installed
- stockpiles temporarily tacified
- meeting with Granite Excvation conducted at City Hall 8/19 to discuss construction schedule, BMP implementation as site progresses, and site stabilization.

SWO correction requests have been satisfied, SWO is removed. Construction activity at site is now allowed.


Correction needed:
- check that stakes in wattles installed are at least 3-4" into the ground, holding wattle firmly in place in its trench.
ESC18-00730 Aging Inspection8/20/20198/20/20198/20/2019 12:58:37 PM CANC
ESC18-00803 General Inspection8/20/20198/20/20198/20/2019 11:30:21 AM CANC
ESC18-00845 General Inspection8/20/20198/20/20198/20/2019 10:08:05 AM CANC
ESC18-00754 General Inspection8/20/20198/20/20198/20/2019 10:07:53 AM PASS
No activity. GC still building home in subdivision, will follow up when that is complete. No corrections needed at this time
ESC18-00264 General Inspection8/20/20198/20/20198/20/2019 8:31:20 AM PASS
Landscaped and revegetated. DI bags are still installed at Shernan & Mockbee.