ESC15-00726
| Conference | 8/21/2015 | 8/21/2015 | 8/24/2015 9:42:17 AM | P | CANC |
|
|
Gunner-call to meet Phone #: ###-####
data entry error
|
ESC14-01151
| General Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 4:30:07 PM | | PASS |
|
|
|
ESC14-01035
| General Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 3:48:16 PM | | PASS |
|
|
|
ESC15-00955
| Site Preparation | 8/21/2015 | 8/21/2015 | 8/21/2015 3:13:31 PM | P | PASS |
|
|
Molenaar Park grading and site development:
Construction entrance installed. SWPPP sign and City of Boise ESC permit posted. Water truck on site for dust control, though it is quite windy so some dust.
Approved.
|
ESC15-00336
| Aging Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 2:54:12 PM | | PASS |
|
|
Parking/access road are complete as well as sidewalks, gutters and stormdrains. No vertical construction. No discharges or trackout. Approved.
|
ESC15-00922
| General Inspection | 8/18/2015 | 8/21/2015 | 8/21/2015 2:41:58 PM | A | PASS |
|
|
Follow up inspection on Cory Ct. (Harding Homes)
Site cleaned up (washout pile, litter, and asphalt chunks). Foundation was excavated and vegetative buffer along ditch was preserved.
Approved.
|
ESC14-00245
| Aging Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 2:24:41 PM | | DONE |
|
|
No construction activity or disturbance on parcel. No activity on BLD permit. ESC permit closed.
|
ESC14-00245
| DOC - Permit Finaled | 8/21/2015 | 8/21/2015 | 8/21/2015 2:23:59 PM | P | PASS |
|
|
|
ESC15-00237
| Aging Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 12:49:54 PM | | PASS |
|
|
WIP. Near completion. No trackout or discharges, trash and waste is contained.
|
ESC11-00879
| General Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 12:13:47 PM | | PASS |
|
|
Streets and gutters around Somerset Village are free of trackout. Perimeter controls are properly installed. No corrections at this time.
|
ESC15-00994
| General Inspection | 8/19/2015 | 8/21/2015 | 8/21/2015 12:09:11 PM | P | PASS |
|
|
Follow inspection for silt fence installation.
Silt fence perimter is now properly staked in. Approved to continue. Site in compliance.
|
ESC13-00806
| General Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 12:04:41 PM | | PASS |
|
|
|
ESC13-00918
| General Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 12:04:17 PM | | PASS |
|
|
|
ESC15-00776
| General Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 12:02:40 PM | P | PASS |
|
|
Permit posted. LIned concrete and liquid washout provided on site. No trackout. Rear silt fence is installed along hillside.
Check fence next inspection. Some sections need maintenance but are okay for now.
|
ESC15-00997
| BMP Violation | 8/20/2015 | 8/21/2015 | 8/21/2015 11:47:45 AM | A | FAIL |
|
|
Complaint of BMP violation including concrete washout in alley, dirt track out///cdp Phone #: ###-####
Need to clean up concrete waste pile in alley, sweep alley, and sweep driveway area in alley.
Will check back Monday AM
|
ESC15-00259
| Aging Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 11:22:15 AM | | PASS |
|
|
|
ESC15-00532
| Site Preparation | 8/21/2015 | 8/21/2015 | 8/21/2015 11:19:55 AM | P | PASS |
|
|
Concrete washout provided. Trash from active projects have been picked up. Permit signs posted.
New phase of 7 new Harris Crossing townhomes are starting.
|
ESC15-00531
| Site Preparation | 8/21/2015 | 8/21/2015 | 8/21/2015 11:19:33 AM | P | PASS |
|
|
Concrete washout provided. Trash from active projects have been picked up. Permit signs posted.
New phase of 7 new Harris Crossing townhomes are starting.
|
ESC15-00530
| Site Preparation | 8/21/2015 | 8/21/2015 | 8/21/2015 11:19:01 AM | P | PASS |
|
|
Concrete washout provided. Trash from active projects have been picked up. Permit signs posted.
New phase of 7 new Harris Crossing townhomes are starting.
|
ESC15-00529
| Site Preparation | 8/21/2015 | 8/21/2015 | 8/21/2015 11:18:04 AM | P | PASS |
|
|
Concrete washout provided. Trash from active projects have been picked up. Permit signs posted.
New phase of 7 new Harris Crossing townhomes are starting.
|
ESC15-00528
| Site Preparation | 8/21/2015 | 8/21/2015 | 8/21/2015 11:17:31 AM | P | PASS |
|
|
Concrete washout provided. Trash from active projects have been picked up. Permit signs posted.
New phase of 7 new Harris Crossing townhomes are starting.
|
ESC15-00527
| Site Preparation | 8/21/2015 | 8/21/2015 | 8/21/2015 11:17:10 AM | P | PASS |
|
|
Concrete washout provided. Trash from active projects have been picked up. Permit signs posted.
New phase of 7 new Harris Crossing townhomes are starting.
|
ESC15-00526
| Site Preparation | 8/20/2015 | 8/21/2015 | 8/21/2015 11:15:40 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
Concrete washout provided. Trash from active projects have been picked up. Permit signs posted.
New phase of 7 new Harris Crossing townhomes are starting.
|
ESC15-00525
| Site Preparation | 8/20/2015 | 8/21/2015 | 8/21/2015 11:15:12 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
Concrete washout provided. Trash from active projects have been picked up. Permit signs posted.
New phase of 7 new Harris Crossing townhomes are starting.
|
ESC15-00532
| Conference | 8/20/2015 | 8/21/2015 | 8/21/2015 11:12:28 AM | A | DONE |
|
|
Review requirements for projects in Harris Crossing. 7 new homes to start on Caddis and south end of development. Trash bins have been provided for the active projects.
Need to stake down visqueen for washout and label concrete washout.
|
ESC15-00796
| Site Preparation | 8/20/2015 | 8/21/2015 | 8/21/2015 10:52:24 AM | A | PASS |
|
|
Daniel Phone #: ###-####
Permit signs to be posted on Shiloh building sign per Dan. Flat infill site, builder in good compliance with ESC permit conditions on project. Will begin Monday. Approved.
|
ESC15-00799
| Site Preparation | 8/20/2015 | 8/21/2015 | 8/21/2015 10:52:00 AM | A | PASS |
|
|
Daniel Phone #: ###-####
Permit signs to be posted on Shiloh building sign per Dan. Flat infill site, builder in good compliance with ESC permit conditions on project. Will begin Monday. Approved.
|
ESC15-00851
| Site Final | 8/20/2015 | 8/21/2015 | 8/21/2015 10:24:45 AM | A | PASS |
|
|
Gunner Phone #: ###-####
Project complete, turf installed. Construction fencing to remain in place to allow turf to establish.
Stockpile of sand removed and swept, DI bag removed. ESC permit conditions satisfied.
|
ESC14-00771
| General Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 10:19:17 AM | | CANC |
|
|
|
ESC15-00334
| Aging Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 10:18:51 AM | | PASS |
|
|
Construction complete. No loose dirt leaving site. ESC permit finaled.
|
ESC15-00104
| General Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 10:06:29 AM | | PASS |
|
|
|
ESC15-00334
| DOC - Permit Finaled | 8/21/2015 | 8/21/2015 | 8/21/2015 9:57:03 AM | P | PASS |
|
|
|
ESC15-00103
| General Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 8:47:02 AM | | PASS |
|
|
|
ESC14-01106
| General Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 8:34:01 AM | | PASS |
|
|
WIP. No trackout or loose sediment around work area. Approved.
|
ESC15-00979
| Site Preparation | 8/20/2015 | 8/21/2015 | 8/21/2015 8:20:28 AM | A | CANC |
|
|
Daniel Phone #: ###-####
|