Inspections for the day of: Tuesday, August 21, 2018.
Number of inspections: 28
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00529 General Inspection8/20/20188/21/20188/22/2018 1:53:10 PMAPASS
check on trackout control, construction entrance and dust control on the laydown yard east of 13th on and I-184 on-ramps. Project using it for staging and parking.


No trackout or discharges from site. WIP on vertical frame for office building.

ESC pernit sign posted. Okland will take care of any issues (trackout, discharges, dust) that arise from using the staging/laydown yard.
ESC17-01426 General Inspection8/21/20188/21/20188/22/2018 10:43:22 AM PART
No trackout or offsite discharges, but dirt ramps within subdivsion will get the parking lot surface very dirty.

Request to remove dirt ramps before end of month.

ESC16-01446 Site Final8/20/20188/21/20188/21/2018 2:30:13 PMAPASS
A exterior areas of disturbance have been stabilized with either hardscape or landscaping. No temporary BMPs left installed or onsite.

ESC permit finaled. BLD is temp. occupancy and GRD is open.
ESC17-01600 Site Final8/21/20188/21/20188/21/2018 2:13:08 PMPPASS
Home complete, stabilized, and occupied. BLD finaled. No ESC corrections needed at site.
ESC17-01725 Site Final8/21/20188/21/20188/21/2018 2:12:55 PMPPASS
Home complete, stabilized, and occupied. BLD finaled. No ESC corrections needed at site.
MIS18-00310 ESC-Conference8/21/20188/21/20188/21/2018 1:46:48 PMPFAIL
. No clean up of loose dirt and sand in gutter and street conducted after verbal warning.

No ESC permit.

Corrections:

- obtain ESC permit for remaining work at site
- designate RP
- clean up sidewalk and street
ESC18-01053 Complaint Inspection8/21/20188/21/20188/21/2018 1:37:03 PMPPEND
Flood irrigation flowed onto site causing muddy discharge and trackout to Farrow.

RP is working with homeowner to fix/contain the flood irrigation. Street sweeper scheduled for tomorrow AM. Rock construction entrance is reportedly installed.

Follow up scheduled.
ESC18-00899 General Inspection8/14/20188/21/20188/21/2018 1:01:23 PMAPASS
Site rough grading is complete. No roads or joint trench activity yet. Silt fence BMP is installed along the irrigation canal to the south of site. No trackout to Kiball or windblown dust. Permit sign is posted.
ESC17-00027 Site Final8/20/20188/21/20188/21/2018 12:36:25 PMAFAIL
Need to remove temporary BMPs installed during project.

- 3 DI bags (one on Cole @ Victory, and two on Victory at east entrance and installed at Beverly during a day of bad trackout_
- Silt fence south of site along Cole Road should be removed.

Verbal correction to RP Mike Taylor
ESC17-01669 Random Inspection8/21/20188/21/20188/21/2018 12:26:32 PMPPASS
ESC16-00556 General Inspection8/21/20188/21/20188/21/2018 12:25:57 PMPPASS
WIP on SFH by CBH. Subdivision phase development complete. DI bags are installed. Concrete washout pit provided. No dust issues observed at time of inspection.
ESC17-01667 Site Final8/21/20188/21/20188/21/2018 12:24:58 PMPPASS
Home complete, landscaped and listed for sale. Temp BMPs in Fork South to remain installed for ongoing construction.
ESC18-00900 Site Preparation8/20/20188/21/20188/21/2018 12:20:57 PMAPASS
check out site location and potential BMPs. Few physical BMPs on ESC site plan. Project should start late this week or next week.


ESC permit sign and SWPPP are posted. Entrance is just east of the NY Canal at Lake Hazel @ Cole. Initial BMPs installed.

Reviewed fugitive dust control requirements with RP.

Approved for construction.
ESC18-00428 Site Final8/21/20188/21/20188/21/2018 12:16:06 PMPPASS
Demo complete. All permits finaled. No ESC corrections needed.
ESC18-00935 Site Preparation8/14/20188/21/20188/21/2018 12:03:17 PMAPASS
Shane ###-####

ESC permit sign project located at the west end security gate parking area off Orchard (under flight light bridge). Stormwater pond is being enlarged and north fencing relocated.

Project area BMPs include:
- perimeter sediment control wattle properly installed on north side of project.
- Water truck onsite to control fugitive dust during excavation.
- airport access road storm drains have sediment filter bags installed.
- RP on duty for weekly inspections.
ESC18-00431 Site Final8/20/20188/21/20188/21/2018 11:18:15 AMAPASS
Demolition complete. No debris or trackout left behind. All permits finaled.
ESC18-01110 General Inspection8/20/20188/21/20188/21/2018 11:16:06 AMAPASS
WIP on clearing site. No significant fugitive dust, no trackout.
ESC18-00832 Complaint Inspection8/21/20188/21/20188/21/2018 11:05:54 AMPCANC
complaint is about new subdivision development in this location.
ESC17-00623 Aging Inspection8/21/20188/21/20188/21/2018 11:05:22 AM DONE
Permit inactive/expired. NO ESC corrections needed.
ESC17-00623 DOC - Permit Finaled8/21/20188/21/20188/21/2018 11:05:00 AMPPASS
ESC17-00831 Aging Inspection8/21/20188/21/20188/21/2018 11:04:20 AM PASS
BLD permit inactive/expired. NO ESC issues. ESC permit closed.
ESC17-00831 DOC - Permit Finaled8/21/20188/21/20188/21/2018 11:03:52 AMPPASS
ESC18-00832 Site Final8/21/20188/21/20188/21/2018 10:33:43 AMPPASS
Demo complete, now Spicebark Subdivision project, see ESC18-01053
ESC04-01137 DOC - Permit Finaled8/21/20188/21/20188/21/2018 10:31:29 AMPPASS
ESC04-01144 DOC - Permit Finaled8/21/20188/21/20188/21/2018 10:31:20 AMPPASS
ESC17-01293 General Inspection8/21/20188/21/20188/21/2018 10:25:19 AM PASS
No trackout or fugitive dust at site. No storm drains on Bethel near project, very dry conditions. No crew onsite, no corrections at this time.
ESC17-00805 General Inspection8/21/20188/21/20188/21/2018 8:02:23 AM CANC
Project has not yet started. BLD permit inactive since October 2017.
ESC17-01488 Site Preparation8/6/20188/21/20188/20/2018 3:34:28 PMPCANC
data entry error