ESC18-01447
| Conference | 8/21/2019 | 8/21/2019 | 8/29/2019 2:15:27 PM | P | DONE |
|
|
Update permit for new contractor
New contractor did not notify ESC division they would be taking over site.
Berlum Construction RPs have been added to permit. Permit transfer has been assessed, $52.50
|
ESC19-00077
| General Inspection | 8/21/2019 | 8/21/2019 | 8/26/2019 3:07:30 PM | P | CANC |
|
|
|
ESC19-00201
| Random Inspection | 8/20/2019 | 8/21/2019 | 8/23/2019 3:00:29 PM | A | PASS |
|
|
check site...no washout onsite//near canal// No dumped washout observed at site. No correction requests at this time.
|
ESC19-00304
| Tracking Control | 8/19/2019 | 8/21/2019 | 8/23/2019 2:40:28 PM | P | PART |
|
|
Dust control seems to have improved, with more circulation on the haul routes. Construction entrance was extended and roughened.
Shoulder along Lake Hazel needs sweeping. Request for Knife River to get sweeeper since much of the track out is from water truck moving between Baserri sub and Barnwood.
|
ESC18-00900
| Tracking Control | 8/21/2019 | 8/21/2019 | 8/23/2019 2:38:02 PM | P | PART |
|
|
Construction entrance was maintained, but there is a lot of loose sand, sediment, and gravel in the shoulder along the Lake Hazel frontage of the site.
Request to have shoulder swept next week. Much of it is from Knife River water truck going between Barnwood (trilogy) and Baserri (hayden homes).
|
ESC18-00899
| Aging Inspection | 8/21/2019 | 8/21/2019 | 8/23/2019 2:15:42 PM | | CANC |
|
|
|
ESC19-00574
| Site Preparation | 8/21/2019 | 8/21/2019 | 8/23/2019 8:48:40 AM | P | PASS |
|
|
Dustin with McAlvain 9 AM
Site walk through and SWPPP/ESC plan inspection. Project has completed tree clearing around the Willow Lane Pond and has began setting up the dewatering plan BMPs. RP to notify Boise ESC when dewatering will begin. Reviewed turbidity testing requirements. Water will discharge into a lined 3 chamber retention area and then discharge in the will lane pond, which has an outfall to the Boise River.
There is no activity or access on the east side of site, where the job trailer and construction entrance will be located. Currently office is at the Lander Street office, using the existing asphalt for construciton access. Storm drain at south end of Lander has a sediment filter bag installed.
Other BMPs include: - concrete washout pan was used for fence post installation. - sediment control wattles have been installed around section of the pond and in between the project area and Greenbelt. - water truck stationed on site for dust control as needed. - New pond perimeter access route was excavated/constructed, area on shoreline is contained by a turbidity curtain.
BMPs installed, SWPPP binder and site map are up to date with completed inspections and grading/stabilization log.
Approved.
Correciton request to post construction project sign(s) at entrance with the Boise ESC permit posted and the SWPPP/CGP 2017 permit posted.
|
ESC19-00114
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 3:28:58 PM | P | PASS |
|
|
James- inspection for cleaned up Phone #: ###-####
Spilled material cleaned up. Addition perimeter BMPs installed as requested. No new corrections.
Site is back in compliance, parcel hold removed, re-inspection fee paid.
|
ESC19-00966
| Site Preparation | 8/21/2019 | 8/21/2019 | 8/21/2019 2:06:25 PM | P | PASS |
|
|
Rock wall installed. No trackout. Will need to repair wattles that were driven over by accessing from from Broadstone
|
ESC18-00311
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 1:57:46 PM | | PASS |
|
|
WIP. Home near completion, not yet landscaped. No corrections needed.
|
ESC19-00927
| Site Preparation | 8/21/2019 | 8/21/2019 | 8/21/2019 1:53:25 PM | P | PASS |
|
|
Tommy ###-####
Permit posted, RP and developer on site. Much of the existing vegetation is supposed to remain, with only .6 acres of disturbed area. Perimeter wattles have been installed along Highland View. Construction entrance rock installed for truck loads. Exisitng asphalt driveway is to remain for this first phase, request that some gutter check bags be installed to treat driveway runoff.
Approved for construction.
|
ESC18-01016
| Aging Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 12:33:24 PM | | PASS |
|
|
|
ESC18-01016
| DOC - Permit Finaled | 8/21/2019 | 8/21/2019 | 8/21/2019 12:33:09 PM | P | PASS |
|
|
|
GRD18-00065
| GRD-Final | 8/20/2019 | 8/21/2019 | 8/21/2019 10:57:46 AM | A | CANC |
|
|
Please call before arrival so that I can meet at Esther Simplot Park (rear parking lot). Construction is complete so I will need 10 min lead time, if possible. Thank you! Phone #: ###-#### >> Inspection requested via web by Tyler Ross Inspection cancelled from web by: Tyler Ross
|
ESC19-00266
| DOC - Permit Finaled | 8/21/2019 | 8/21/2019 | 8/21/2019 8:31:52 AM | P | PASS |
|
|
|
ESC18-01196
| Aging Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 8:25:24 AM | | CANC |
|
|
rescheduled for site final
|
ESC18-01187
| Aging Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 8:24:22 AM | | DEFR |
|
|
finaled by BLD inspector in June
|
ESC18-01187
| DOC - Permit Finaled | 8/21/2019 | 8/21/2019 | 8/21/2019 8:24:06 AM | P | PASS |
|
|
|
ESC18-01375
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 8:23:48 AM | | CANC |
|
|
rescheduled for site final
|