Inspections for the day of: Friday, August 22, 2014.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01215 Aging Inspection8/22/20148/22/20148/22/2014 4:31:37 PM CANC
Rescheduled for Monday 8/25
ESC14-00335 General Inspection8/22/20148/22/20148/22/2014 4:01:28 PM PASS
New covered storage structure is in progress. Water truck on site for dust control and compaction purposes. No MS4 or surface water in vicinity. Permit posted on fence. No corrections required.
ESC14-00657 Site Preparation8/22/20148/22/20148/22/2014 3:47:10 PMPPASS
Site preparation for River Heights #6. Inspection requested by Brighton Corp. RP Daniel.



Met RP on site to review SWPPP and ESC site map. BMPs for the first phase (rough grading) are installed. The construction entrance will be installed next week once the rough grading begins by Nampa Paving.

Sheet flow from upper end of development flows toward existing. A wattle has been lined against the wood fence that has been installed.

Permit and NOI posted.

Approved. Construction will begin next week once GRD permit is released.
ESC13-00522 General Inspection8/22/20148/22/20148/22/2014 2:15:28 PM PASS
Townhome frame is up, no stucco or siding yet. Permit is posted, trash and materials are contained and no trackout or illicit discharges observed. Approved.
ESC13-01279 BMP Violation8/22/20148/22/20148/22/2014 2:09:04 PMPPEND
Correction notice issued to sweep and shovel collected sediment and rocks from Lucky Harris at 11:30 AM. Scheduled onsite meeting with RP Chad Hamel at 1:30 PM.

Between the time of CN and meeting, Chad had Brown Construction laborers come and shovel the gutters and run their onsite sweeper (no vacuum). To follwo up Curtis Clean Sweep will be coming this afternoon with a vacuum for a deeper clean.

Beginning of next week Schmidt will turn over/scarify exisitng rock entrance which has filled in.

Response and corrective actions were prompt after initial requests this week were unfulfilled.

Will check conditions on Monday.
ESC13-00684 General Inspection8/22/20148/22/20148/22/2014 11:56:58 AM PASS
No activity. No corrections required at Antelope Springs at this time. Site is well contained and banks are stabilizing around Walling Creek.
ESC14-00657 Site Preparation8/22/20148/22/20148/22/2014 11:45:19 AMPCANC
Check for BMP installation. Review SWPPP on site.
ESC13-01157 Aging Inspection8/22/20148/22/20148/22/2014 11:45:00 AM PASS
Finaled.
ESC13-01157 DOC - Permit Finaled8/22/20148/22/20148/22/2014 11:44:47 AMPPASS
Home complete, landscaped, ESC conditions satisfied. All permits finaled.
ESC14-00788 Site Preparation8/21/20148/22/20148/22/2014 11:39:21 AMAPART
Check for proper BMP installation at Privada sub site. Inspection requested by Syman Co.

Silt fence perimeter is installed as indicated on ESC site map. Some areas of fence are tucked and trenched improperly - Syman will reinspect and fix as necessary.

SWPPP and permit are onsite. Advised RP Lance to make sure inspection forms and corrective action forms are available in the SWPPP binder onsite.
ESC14-00680 Site Preparation8/21/20148/22/20148/22/2014 10:10:40 AMAPASS
Brett Phone #: ###-####

Permit posted, construction is to start this afternoon. Flat site with homes on both adjacent lots. BMPs include daily housekeeping and downstream drop inlets.

Requested that all inlets in Trailside Place be maintained next week. RP Brett agreed.
ESC14-00492 Random Inspection8/22/20148/22/20148/22/2014 10:06:22 AMPPART
Home is near completion and awaiting landscaping and interior work.

2 corrections:

1. Drop inlet filter bag downstream at corner of Cruzette & Jump Creek has been damaged and needs replacement and maintenance.

2. Sweep gutter and sidewalk in front of home and down towards Jump Creek.

Verbal correction notice issued to CBH RP Brett.
ESC13-00187 Aging Inspection8/22/20148/22/20148/22/2014 9:36:22 AM PASS
Not yet landscaped/stabilized. No sediment runoff. BLD already finaled, will wait till stabilization is acheived.
ESC14-00349 General Inspection8/22/20148/22/20148/22/2014 9:00:09 AM PASS
WIP. Phillipi is under construction so is currently dirt. Minimal trackout to Irving. No other violations observed. Work is contained well with the Simplot Plant Science complex.