PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, August 22, 2018
.
Number of inspections:
22
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-00983
Site Preparation
8/22/2018
8/22/2018
8/24/2018 8:36:25 AM
P
PEND
WIP
ESC18-00213
BMP Violation
8/21/2018
8/22/2018
8/23/2018 11:59:29 AM
A
PEND
Verbal correction request to Joey with Blackrock via phone:
- install DI bags in alleys behind active construction in new phases at east end of the Blvd townhomes.
- remove DI bags from alleys that have all construction and landscaping complete
- post concrete washout sign at washout (apparently in a craw space area of a completed foundation.
- follow up inspection scheduled.
ESC18-00114
Site Final
8/21/2018
8/22/2018
8/23/2018 10:18:41 AM
A
NR
DI bags still installed. Project near completion. Will notify homeowner RP
ESC17-00971
General Inspection
8/22/2018
8/22/2018
8/22/2018 2:16:23 PM
P
PEND
No trackout or discharges. Large stockpiles on site appear to be inactive and will be an issue for sediment runoff as Fall progress. Stockpiles need perimeter sediment controls or other or removal. Stockpiles are not allowed to be inactive for extended periods.
ESC18-00181
General Inspection
8/21/2018
8/22/2018
8/22/2018 12:19:36 PM
A
PASS
ESC18-00792
General Inspection
8/21/2018
8/22/2018
8/22/2018 12:05:52 PM
A
PASS
WIP on site grading and infrastructure installation. Site has had very good fugitive dust control considering size of disturbance.
No significant trackout to roads surrounding site.
Correction request for next inspection:
- sweep up gutter on Denton between entrance and Curtis
- improve rock construction entrance to prevent trackout.
ESC16-01706
General Inspection
8/21/2018
8/22/2018
8/22/2018 11:46:03 AM
A
PART
No discharges, fugitive dust or uncontained trash. RP on site. On site storm water facililities are installed. Temporary office building now onsite for MG Construction office personnel.
Correction needed:
- clean and/or remove dirt ramp construction entrance in gutter at east side of site.
- pick up loose trash along frontage.
ESC18-01053
General Inspection
8/21/2018
8/22/2018
8/22/2018 11:25:43 AM
A
PART
follow up to complaint response
Street sweeper has visited site as requested, but there is still additional corrections.
- sweep sidewalks with push brooms across street
- install sediment protection on storm drain on McMillan
- continue improvements to prevent irrigation water from flowing into site from adjacent yard to the south of entrance
- relocate an ESC permit sign or SWPPP at entrance to site.
Talked to RP who said he will get it done. Follow up inspection on Monday.
ESC18-01201
Site Preparation
8/22/2018
8/22/2018
8/22/2018 10:44:21 AM
P
PASS
Brad Phone #: ###-####
DI in parking lot is protected. RP will pull at end of project. Stormwater contained onsite, minimal earthwork.
Approved.
ESC18-00318
General Inspection
8/22/2018
8/22/2018
8/22/2018 10:38:10 AM
A
PASS
Pool in progress in large backyard. No trackout, discharges, or dust
ESC18-00426
Tracking Control
8/21/2018
8/22/2018
8/22/2018 10:37:08 AM
A
FAIL
No crew or activity. Subdivision infrastructure is complete. No SFHs yet.
Dirt and sandy trackout to Landmark has not been swept or was missed or added after sweeping request. Follow up scheduled for 8/23.
If no clean up, re-inspection fees will be charged for repeat Fails.
ESC03-01404
DOC - Permit Finaled
8/22/2018
8/22/2018
8/22/2018 10:22:15 AM
P
PASS
ESC04-00254
DOC - Permit Finaled
8/22/2018
8/22/2018
8/22/2018 10:21:57 AM
P
PASS
ESC18-00213
BMP Violation
8/21/2018
8/22/2018
8/22/2018 8:29:29 AM
A
CANC
ESC18-00983
Conference
8/22/2018
8/22/2018
8/22/2018 8:22:46 AM
P
DONE
Onsite conference conducted 8/13 to discuss BMP installation and project prior to ESC & GRD being issued.
ESC17-01219
Aging Inspection
8/22/2018
8/22/2018
8/22/2018 8:09:57 AM
DONE
BLD finaled by BLD inspector. No ESC issues. Work in backyard.
ESC17-01219
DOC - Permit Finaled
8/22/2018
8/22/2018
8/22/2018 8:09:30 AM
P
PASS
ESC17-01176
Aging Inspection
8/22/2018
8/22/2018
8/22/2018 8:08:25 AM
CANC
BLD permit and ESC permit expired. No disturbance at site
ESC17-01176
DOC - Permit Finaled
8/22/2018
8/22/2018
8/22/2018 8:08:03 AM
P
PASS
ESC17-01178
Aging Inspection
8/22/2018
8/22/2018
8/22/2018 8:07:19 AM
CANC
rescheduled for site final
ESC17-01057
General Inspection
8/22/2018
8/22/2018
8/22/2018 8:06:28 AM
CANC
ESC17-01281
General Inspection
8/22/2018
8/22/2018
8/22/2018 8:06:21 AM
CANC