ESC16-00936
| Conference | 8/18/2017 | 8/23/2017 | 8/25/2017 4:10:29 PM | P | PEND |
|
|
Trash pile has been cleaned up.
Corrections:
- provide dumpster - provide concrete washout
No issues with sediment control down slope. Issued warning/notice that slopes will need to be vegetated or covered with ECBs before end of October.
|
ESC17-00190
| General Inspection | 8/18/2017 | 8/23/2017 | 8/25/2017 4:09:04 PM | P | PASS |
|
|
Slopes have been tracked. Checking with developer on next steps for temporary or permanent vegetation.
Curb, gutter, storm drain and utilites have been installed.
No evidence of sediment runoff from site to BB Road No trackout or fugitive dust observed.
|
ESC17-00748
| General Inspection | 8/18/2017 | 8/23/2017 | 8/25/2017 4:07:30 PM | P | CANC |
|
|
|
ESC16-01618
| Site Final | 8/18/2017 | 8/23/2017 | 8/25/2017 4:07:13 PM | P | CANC |
|
|
|
ESC15-01210
| General Inspection | 8/18/2017 | 8/23/2017 | 8/25/2017 4:07:06 PM | A | PEND |
|
|
Wood River Builders to pull 3 DI bags for maintenance and shall replace with new protection if necessary.
Need to work with upper lot contractors on some corrections. No slope erosion issues or sediment runoff issues observed along Mockbee.
Corrections in progress.
|
ESC17-00954
| General Inspection | 8/14/2017 | 8/23/2017 | 8/25/2017 4:05:14 PM | A | PASS |
|
|
No issues, no significant activity or grading has occured yet.
|
ESC16-00618
| Site Final | 8/22/2017 | 8/23/2017 | 8/25/2017 4:04:46 PM | A | PASS |
|
|
Home complete, landscaped, and no temporary BMPs or loose materials remaining. All permits finaled.
|
ESC15-01579
| General Inspection | 8/23/2017 | 8/23/2017 | 8/25/2017 3:59:02 PM | | CANC |
|
|
rescheduled for 8/29
|
ESC16-01649
| General Inspection | 8/23/2017 | 8/23/2017 | 8/25/2017 3:58:29 PM | | CANC |
|
|
|
ESC16-01682
| General Inspection | 8/23/2017 | 8/23/2017 | 8/25/2017 3:58:23 PM | | PASS |
|
|
No sediment runoff or trackout. This phase of Hackberry Ranch in good condition.
|
ESC16-01253
| General Inspection | 8/23/2017 | 8/23/2017 | 8/25/2017 3:57:30 PM | | CANC |
|
|
|
ESC16-01233
| General Inspection | 8/23/2017 | 8/23/2017 | 8/24/2017 12:00:38 PM | | CANC |
|
|
|
ESC16-01334
| General Inspection | 8/23/2017 | 8/23/2017 | 8/24/2017 11:55:37 AM | | CANC |
|
|
|
ESC16-01335
| General Inspection | 8/23/2017 | 8/23/2017 | 8/24/2017 11:54:56 AM | | CANC |
|
|
|
ESC16-01333
| General Inspection | 8/23/2017 | 8/23/2017 | 8/24/2017 11:54:19 AM | | CANC |
|
|
|
ESC17-00637
| General Inspection | 8/22/2017 | 8/23/2017 | 8/24/2017 11:53:47 AM | A | CANC |
|
|
|
ESC16-01155
| Aging Inspection | 8/23/2017 | 8/23/2017 | 8/24/2017 11:52:00 AM | | CANC |
|
|
|
ESC16-01612
| Complaint Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 2:13:35 PM | P | PEND |
|
|
dust
No fugitive dust plumes leaving site at time of inspection. Water truck onsite. Park Blvd currently being resurfaced, so lots of disturbed area around site. No discharges or spills observed. Will continue to monitor this week.
|
ESC16-00059
| Site Final | 8/22/2017 | 8/23/2017 | 8/23/2017 2:11:39 PM | P | CANC |
|
|
|
ESC16-01651
| General Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 2:11:05 PM | | CANC |
|
|
|
ESC16-01006
| General Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 2:10:20 PM | P | FAIL |
|
|
Corrections needed:
- street sweeping for Saxton and all streets within phase 1 and 2 of Millwell Park. - DI bag maintenance and cleaning at gutter
Verbal Correction Request for RP Ed with Wood Bros.
|
ESC17-00191
| Site Final | 8/23/2017 | 8/23/2017 | 8/23/2017 11:54:45 AM | P | PASS |
|
|
Home complete and landscaped.
Will request that subdivsion streets be swept under the Millwell Park main ESC permit ESC16-01006
|
ESC16-01732
| Site Final | 8/23/2017 | 8/23/2017 | 8/23/2017 11:54:14 AM | P | PASS |
|
|
Home complete and landscaped.
Will request that subdivsion streets be swept under the Millwell Park main ESC permit ESC16-01006
|
ESC16-01708
| Site Final | 8/23/2017 | 8/23/2017 | 8/23/2017 11:53:03 AM | P | PASS |
|
|
Home complete and landscaped.
Will request that subdivsion streets be swept under the Millwell Park main ESC permit ESC16-01006
|
ESC17-00111
| General Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 11:51:32 AM | P | PASS |
|
|
Working in ROW to connect to utilities. No discharges or fugitive dust observed.
|
ESC16-01022
| Aging Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 11:36:33 AM | | PASS |
|
|
Home complete, landscaped and occupied. No ESC corrections.
|
ESC16-01022
| DOC - Permit Finaled | 8/23/2017 | 8/23/2017 | 8/23/2017 11:35:49 AM | P | PASS |
|
|
|
ESC17-00005
| General Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 11:34:36 AM | P | PART |
|
|
Need to empty full trash container and cleanup staging area. Follow up inspection scheduled
|
ESC17-00090
| DOC - Permit Finaled | 8/23/2017 | 8/23/2017 | 8/23/2017 11:32:15 AM | P | PASS |
|
|
TI complete and occupied. BLD is finaled but says is issued. NO corrections needed at site.
|
ESC15-00504
| General Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 11:28:56 AM | P | PASS |
|
|
Apartment units and garages are under construction along Gary Lane and in the northwest corner of Kensington. The central area is complete, occupied, and landscaped/stabilized. Permeable pavers in the construction area are to be cleaned or repaired at end of project prior to units being occupied.
No trackout from site, no discharges or spills observed. Trash is contained and site is generally clean.
|
ESC15-00434
| General Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 11:15:30 AM | P | PASS |
|
|
No trackout from Kensington to Gary Lane or Saxton. See also main site ESC permit, ESC15-00504
|
ESC15-00449
| Site Final | 8/23/2017 | 8/23/2017 | 8/23/2017 11:13:29 AM | P | PASS |
|
|
See ESC15-00504 for remaining Kensington inspections. WIP in some areas, all buildings are now framed and in vertical phase. No further ESC inspecitons on this permit.
Onsite pavers are to be re-installed/clean upon completion of construction.
|
ESC15-00448
| Site Final | 8/23/2017 | 8/23/2017 | 8/23/2017 11:13:04 AM | P | PASS |
|
|
See ESC15-00504 for remaining Kensington inspections. WIP in some areas, all buildings are now framed and in vertical phase. No further ESC inspecitons on this permit.
Onsite pavers are to be re-installed/clean upon completion of construction.
|
ESC15-00447
| Site Final | 8/23/2017 | 8/23/2017 | 8/23/2017 11:12:39 AM | P | PASS |
|
|
See ESC15-00504 for remaining Kensington inspections. WIP in some areas, all buildings are now framed and in vertical phase. No further ESC inspecitons on this permit.
Onsite pavers are to be re-installed/clean upon completion of construction.
|
ESC15-00446
| Site Final | 8/23/2017 | 8/23/2017 | 8/23/2017 11:12:05 AM | P | PASS |
|
|
See ESC15-00504 for remaining Kensington inspections. WIP in some areas, all buildings are now framed and in vertical phase. No further ESC inspecitons on this permit.
Onsite pavers are to be re-installed/clean upon completion of construction.
|
ESC15-00435
| Site Final | 8/23/2017 | 8/23/2017 | 8/23/2017 11:11:44 AM | P | PASS |
|
|
See ESC15-00504 for remaining Kensington inspections. WIP in some areas, all buildings are now framed and in vertical phase. No further ESC inspecitons on this permit.
Onsite pavers are to be re-installed/clean upon completion of construction.
|
ESC17-00971
| Complaint Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 10:53:05 AM | P | FAIL |
|
|
Dust complaint received:
Significant earth work occuring without water truck in use to control dust.
RP stated that water truck broke down and they are in the process of replacement. It was verified that water truck was in use previously till yesterday and today.
Warning issued to control dust ASAP or significant dust creating activity.
Correction request to provide proper trash containment at site staging area/entrance.
|
ESC17-00971
| General Inspection | 8/17/2017 | 8/23/2017 | 8/23/2017 10:50:06 AM | A | CANC |
|
|
|
ESC16-01706
| General Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 10:19:29 AM | A | PASS |
|
|
WIP removing stockpiles on lot. Water truck onsite for dust control and construction entrance installed. Approved.
|
ESC16-00192
| Aging Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 9:23:17 AM | | CANC |
|
|
|
ESC16-00193
| Aging Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 9:22:34 AM | | CANC |
|
|
|
ESC16-00190
| Aging Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 9:22:12 AM | | CANC |
|
|
|
ESC13-00524
| Conference | 8/18/2017 | 8/23/2017 | 8/22/2017 4:22:27 PM | A | CANC |
|
|
|