Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00936 Conference8/18/20178/23/20178/25/2017 4:10:29 PMPPEND
Trash pile has been cleaned up.

Corrections:

- provide dumpster
- provide concrete washout

No issues with sediment control down slope. Issued warning/notice that slopes will need to be vegetated or covered with ECBs before end of October.
ESC17-00190 General Inspection8/18/20178/23/20178/25/2017 4:09:04 PMPPASS
Slopes have been tracked. Checking with developer on next steps for temporary or permanent vegetation.

Curb, gutter, storm drain and utilites have been installed.

No evidence of sediment runoff from site to BB Road No trackout or fugitive dust observed.
ESC17-00748 General Inspection8/18/20178/23/20178/25/2017 4:07:30 PMPCANC
ESC16-01618 Site Final8/18/20178/23/20178/25/2017 4:07:13 PMPCANC
ESC15-01210 General Inspection8/18/20178/23/20178/25/2017 4:07:06 PMAPEND
Wood River Builders to pull 3 DI bags for maintenance and shall replace with new protection if necessary.

Need to work with upper lot contractors on some corrections. No slope erosion issues or sediment runoff issues observed along Mockbee.

Corrections in progress.
ESC17-00954 General Inspection8/14/20178/23/20178/25/2017 4:05:14 PMAPASS
No issues, no significant activity or grading has occured yet.
ESC16-00618 Site Final8/22/20178/23/20178/25/2017 4:04:46 PMAPASS
Home complete, landscaped, and no temporary BMPs or loose materials remaining. All permits finaled.
ESC15-01579 General Inspection8/23/20178/23/20178/25/2017 3:59:02 PM CANC
rescheduled for 8/29
ESC16-01649 General Inspection8/23/20178/23/20178/25/2017 3:58:29 PM CANC
ESC16-01682 General Inspection8/23/20178/23/20178/25/2017 3:58:23 PM PASS
No sediment runoff or trackout. This phase of Hackberry Ranch in good condition.
ESC16-01253 General Inspection8/23/20178/23/20178/25/2017 3:57:30 PM CANC
ESC16-01233 General Inspection8/23/20178/23/20178/24/2017 12:00:38 PM CANC
ESC16-01334 General Inspection8/23/20178/23/20178/24/2017 11:55:37 AM CANC
ESC16-01335 General Inspection8/23/20178/23/20178/24/2017 11:54:56 AM CANC
ESC16-01333 General Inspection8/23/20178/23/20178/24/2017 11:54:19 AM CANC
ESC17-00637 General Inspection8/22/20178/23/20178/24/2017 11:53:47 AMACANC
ESC16-01155 Aging Inspection8/23/20178/23/20178/24/2017 11:52:00 AM CANC
ESC16-01612 Complaint Inspection8/23/20178/23/20178/23/2017 2:13:35 PMPPEND
dust

No fugitive dust plumes leaving site at time of inspection. Water truck onsite. Park Blvd currently being resurfaced, so lots of disturbed area around site. No discharges or spills observed. Will continue to monitor this week.
ESC16-00059 Site Final8/22/20178/23/20178/23/2017 2:11:39 PMPCANC
ESC16-01651 General Inspection8/23/20178/23/20178/23/2017 2:11:05 PM CANC
ESC16-01006 General Inspection8/23/20178/23/20178/23/2017 2:10:20 PMPFAIL
Corrections needed:

- street sweeping for Saxton and all streets within phase 1 and 2 of Millwell Park.
- DI bag maintenance and cleaning at gutter

Verbal Correction Request for RP Ed with Wood Bros.
ESC17-00191 Site Final8/23/20178/23/20178/23/2017 11:54:45 AMPPASS
Home complete and landscaped.

Will request that subdivsion streets be swept under the Millwell Park main ESC permit ESC16-01006
ESC16-01732 Site Final8/23/20178/23/20178/23/2017 11:54:14 AMPPASS
Home complete and landscaped.

Will request that subdivsion streets be swept under the Millwell Park main ESC permit ESC16-01006
ESC16-01708 Site Final8/23/20178/23/20178/23/2017 11:53:03 AMPPASS
Home complete and landscaped.

Will request that subdivsion streets be swept under the Millwell Park main ESC permit ESC16-01006
ESC17-00111 General Inspection8/23/20178/23/20178/23/2017 11:51:32 AMPPASS
Working in ROW to connect to utilities. No discharges or fugitive dust observed.

ESC16-01022 Aging Inspection8/23/20178/23/20178/23/2017 11:36:33 AM PASS
Home complete, landscaped and occupied. No ESC corrections.
ESC16-01022 DOC - Permit Finaled8/23/20178/23/20178/23/2017 11:35:49 AMPPASS
ESC17-00005 General Inspection8/23/20178/23/20178/23/2017 11:34:36 AMPPART
Need to empty full trash container and cleanup staging area. Follow up inspection scheduled
ESC17-00090 DOC - Permit Finaled8/23/20178/23/20178/23/2017 11:32:15 AMPPASS
TI complete and occupied. BLD is finaled but says is issued. NO corrections needed at site.
ESC15-00504 General Inspection8/23/20178/23/20178/23/2017 11:28:56 AMPPASS
Apartment units and garages are under construction along Gary Lane and in the northwest corner of Kensington. The central area is complete, occupied, and landscaped/stabilized. Permeable pavers in the construction area are to be cleaned or repaired at end of project prior to units being occupied.

No trackout from site, no discharges or spills observed. Trash is contained and site is generally clean.
ESC15-00434 General Inspection8/23/20178/23/20178/23/2017 11:15:30 AMPPASS
No trackout from Kensington to Gary Lane or Saxton. See also main site ESC permit, ESC15-00504
ESC15-00449 Site Final8/23/20178/23/20178/23/2017 11:13:29 AMPPASS
See ESC15-00504 for remaining Kensington inspections. WIP in some areas, all buildings are now framed and in vertical phase. No further ESC inspecitons on this permit.

Onsite pavers are to be re-installed/clean upon completion of construction.
ESC15-00448 Site Final8/23/20178/23/20178/23/2017 11:13:04 AMPPASS
See ESC15-00504 for remaining Kensington inspections. WIP in some areas, all buildings are now framed and in vertical phase. No further ESC inspecitons on this permit.

Onsite pavers are to be re-installed/clean upon completion of construction.
ESC15-00447 Site Final8/23/20178/23/20178/23/2017 11:12:39 AMPPASS
See ESC15-00504 for remaining Kensington inspections. WIP in some areas, all buildings are now framed and in vertical phase. No further ESC inspecitons on this permit.

Onsite pavers are to be re-installed/clean upon completion of construction.
ESC15-00446 Site Final8/23/20178/23/20178/23/2017 11:12:05 AMPPASS
See ESC15-00504 for remaining Kensington inspections. WIP in some areas, all buildings are now framed and in vertical phase. No further ESC inspecitons on this permit.

Onsite pavers are to be re-installed/clean upon completion of construction.
ESC15-00435 Site Final8/23/20178/23/20178/23/2017 11:11:44 AMPPASS
See ESC15-00504 for remaining Kensington inspections. WIP in some areas, all buildings are now framed and in vertical phase. No further ESC inspecitons on this permit.

Onsite pavers are to be re-installed/clean upon completion of construction.
ESC17-00971 Complaint Inspection8/23/20178/23/20178/23/2017 10:53:05 AMPFAIL
Dust complaint received:

Significant earth work occuring without water truck in use to control dust.

RP stated that water truck broke down and they are in the process of replacement. It was verified that water truck was in use previously till yesterday and today.

Warning issued to control dust ASAP or significant dust creating activity.

Correction request to provide proper trash containment at site staging area/entrance.
ESC17-00971 General Inspection8/17/20178/23/20178/23/2017 10:50:06 AMACANC


ESC16-01706 General Inspection8/23/20178/23/20178/23/2017 10:19:29 AMAPASS
WIP removing stockpiles on lot. Water truck onsite for dust control and construction entrance installed. Approved.
ESC16-00192 Aging Inspection8/23/20178/23/20178/23/2017 9:23:17 AM CANC
ESC16-00193 Aging Inspection8/23/20178/23/20178/23/2017 9:22:34 AM CANC
ESC16-00190 Aging Inspection8/23/20178/23/20178/23/2017 9:22:12 AM CANC
ESC13-00524 Conference8/18/20178/23/20178/22/2017 4:22:27 PMACANC