PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, August 23, 2018
.
Number of inspections:
16
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC16-01457
Conference
8/23/2018
8/23/2018
8/29/2018 8:15:59 PM
P
PEND
check with parcel owner for project update.
ESC18-00863
General Inspection
8/21/2018
8/23/2018
8/24/2018 3:30:18 PM
A
PASS
follow up inspection
Corrections complete:
- sidewalk and gutter were swept. Most loose dirt was removed.
- DI bag installed for sediment protection on the receiving storm drain.
ESC18-00866
General Inspection
8/21/2018
8/23/2018
8/24/2018 3:30:00 PM
A
PASS
follow up inspection
Corrections complete:
- sidewalk and gutter were swept. Most loose dirt was removed.
- DI bag installed for sediment protection on the receiving storm drain.
ESC16-01561
Complaint Inspection
8/23/2018
8/23/2018
8/24/2018 1:35:17 PM
P
PASS
trash complaint along Walling Creek
Minor amount of trash picked up during perimter walk. RP on duty, reported daily trash pick up is occuring. No trackout or discharges from site.
Request to RP to make sure crew sweeps sidewalk path where stucco is being applied.
ESC16-01108
General Inspection
8/23/2018
8/23/2018
8/24/2018 12:42:15 PM
CANC
rescheduled
ESC17-01449
General Inspection
8/7/2018
8/23/2018
8/24/2018 10:35:20 AM
A
PART
Permit sign posted, no trackout to Pennsylvania. Foundation has been poured. Lined washout was not utilized.
Correction request:
- provide trash containment for framing crew
- use concrete washout for next phase.
Clarified that rock/aggregate may be dumped, but the actual washout should be done into a lined container.
Met GC Tony with TK development and discussed corrections. He will get it done, there will 6 units on this site.
ESC16-00945
General Inspection
8/23/2018
8/23/2018
8/23/2018 12:00:22 PM
CANC
ESC17-00786
Aging Inspection
8/23/2018
8/23/2018
8/23/2018 12:00:13 PM
CANC
rescheduled for site final
ESC04-00758
DOC - Permit Finaled
8/23/2018
8/23/2018
8/23/2018 8:14:51 AM
P
PASS
ESC17-01324
Aging Inspection
8/23/2018
8/23/2018
8/23/2018 8:08:56 AM
DONE
BLD permit expired w/o final. Earthwork for project complete. No further ESC inspections.
ESC17-01324
DOC - Permit Finaled
8/23/2018
8/23/2018
8/23/2018 8:08:20 AM
P
PASS
ESC15-01210
General Inspection
8/23/2018
8/23/2018
8/23/2018 8:05:00 AM
CANC
ESC15-01138
General Inspection
8/23/2018
8/23/2018
8/23/2018 8:00:52 AM
CANC
ESC16-00625
General Inspection
8/23/2018
8/23/2018
8/23/2018 8:00:44 AM
CANC
ESC16-01410
General Inspection
8/23/2018
8/23/2018
8/23/2018 7:59:59 AM
CANC
MIS18-00310
ESC-Conference
8/22/2018
8/23/2018
8/22/2018 4:21:17 PM
A
PEND
Called Bulldog Excavation. They will clean up and patch the work completed. Discussed that any project, even if only for water lines, that disturbs greater than 10 cubic yards should have an ESC permit