PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, August 24, 2018
.
Number of inspections:
20
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC16-01472
General Inspection
8/24/2018
8/24/2018
8/27/2018 12:40:05 PM
PART
WIP on interior. Hilliside BMPs installed, some section of wattles need stakes re-installed due to movement by sub contractors. Trash around site contained. Silt fence barrier to protect neighbor's yard is installed. Lower section needs maintenance.
No driveway or roof gutters installed yet. Logan alley ROW has two gator guard water bars that channel water to the lower landing area onsite.
Corrections needed:
- resecure damaged or relocated wattles on slope between home and Logan alley.
- re-install silt fence at bottom of installation so that it J-hooks to trap sediment and not allow water to flow off alley to yard below.
- plan to have gutters installed in September or ASAP to prevent runoff flowing over disturbed slopes.
ESC15-00306
General Inspection
8/20/2018
8/24/2018
8/27/2018 8:12:17 AM
A
CANC
ESC16-01189
Site Final
8/24/2018
8/24/2018
8/24/2018 3:26:18 PM
P
CANC
ESC17-00786
Site Final
8/23/2018
8/24/2018
8/24/2018 3:24:23 PM
A
NR
Home complete but not yet landcaped and gutter is dirty. Will monitor for stabilization and cleanup. BLD finaled and home is occupied.
ESC16-01189
Site Final
8/24/2018
8/24/2018
8/24/2018 3:14:36 PM
P
NR
Still need to remove DI bag on Preece. RP dave said he will do it. Rescheduled for two weeks out....
ESC18-00426
Tracking Control
8/22/2018
8/24/2018
8/24/2018 2:59:08 PM
A
PASS
Area of concern at south end of subdivision has been swept as requested. Crew on site installing neighborhood fence.
Will need to install sediment protection on the stormdrain on Woodcreek and on Landmark.
ESC18-00476
General Inspection
8/24/2018
8/24/2018
8/24/2018 2:52:12 PM
P
PASS
WIP on site work and foundation. Construction entrances installed but are wrong type of rock. No trackout at this time, will need change for Fall DI bags installed on Emerald. No fugitve dust observed. Site is has full silt fence perimeter.
ESC17-01681
DOC - Permit Finaled
8/24/2018
8/24/2018
8/24/2018 2:49:54 PM
P
PASS
see ESC18-00476 for ESC permit coverage
ESC17-00510
General Inspection
8/24/2018
8/24/2018
8/24/2018 2:46:44 PM
PASS
WIP at Sterling Park. Entrance and parking lot has curbing but not yet paved. Large compost stockpiles onsite. No windblown dust observed. Water truck also on site. No trackout or discahrges. Surrounding MS4 inlets have sediment protection.
ESC14-01083
General Inspection
8/24/2018
8/24/2018
8/24/2018 1:39:48 PM
PASS
ESC17-01362
General Inspection
8/24/2018
8/24/2018
8/24/2018 1:39:13 PM
P
PASS
WIP on frame and installing curbing for roads & parking with site. Construction entrances installed, permit sign posted, trash around perimeter is picked up, concrete washout bins onsite, and water truck available for dust control.
Stockpile of topsoil staged on west side of site has been properly tacified due to planned period of inactivity. Site has been very well managed regard ESC standards.
ESC17-01491
General Inspection
8/24/2018
8/24/2018
8/24/2018 1:36:53 PM
P
PASS
Bridge is complete and open. BMPs removed from creek area directly downstream of bridge. No materials or dirty surfaces left on site.
Banks on either side are vegetating, will monitor through Fall.
ESC18-00213
BMP Violation
8/23/2018
8/24/2018
8/24/2018 12:41:36 PM
A
PASS
DI bags are now installed in alley ways behind projects. Most trash is contained. Concrete washout with lining is located on lot8- block 14. Needs to have a sign.
Corrections requested were completed. Request to Joey to have loose trash at foundation sites picked up and that sweeping should be done on sites that recently added road mix to driveways.
ESC17-00518
General Inspection
8/24/2018
8/24/2018
8/24/2018 10:57:49 AM
PASS
Exterior work complete. Area around addition has grass. ESC permit finaled. BLD open
ESC17-00518
DOC - Permit Finaled
8/24/2018
8/24/2018
8/24/2018 10:42:51 AM
P
PASS
ESC17-00286
Site Final
8/24/2018
8/24/2018
8/24/2018 10:40:03 AM
P
PASS
Project now under ESC17-01449. No ESC corrections, this permit finaled.
ESC16-00938
General Inspection
8/24/2018
8/24/2018
8/24/2018 8:19:49 AM
CANC
ESC17-01332
Aging Inspection
8/24/2018
8/24/2018
8/24/2018 8:04:55 AM
DONE
exterior disturbance stabilized. Shop structure complete. BLD is open. ESC permit finaled.
ESC17-01332
DOC - Permit Finaled
8/24/2018
8/24/2018
8/24/2018 8:02:15 AM
P
PASS
ESC18-00023
Site Preparation
8/20/2018
8/24/2018
8/24/2018 8:00:32 AM
A
CANC
10 AM pre construction conference
to be rescheduled.