ESC15-00306
| General Inspection | 8/27/2018 | 8/27/2018 | 9/4/2018 12:56:04 PM | A | PEND |
|
|
site being prepped for next phase of project, which will be permitted seperately. Will verify that any old netting no longer functioning as an ESC BMP has been removed during Site Preparation walk through. New phase to be covered under ESC18-01121
|
ESC15-00857
| Conference | 8/27/2018 | 8/27/2018 | 8/27/2018 5:52:01 PM | P | DONE |
|
|
pre-construction safety fence and initial ESC BMP check completed, for further details, see phase 10 permit ESC18-01022
No corrections for phase 9
|
ESC18-00738
| Site Preparation | 8/24/2018 | 8/27/2018 | 8/27/2018 5:50:35 PM | P | PASS |
|
|
Dave Phone #: ###-####
Permit sign posted. Silt fence installed around the downslope perimeter of both lots which are both Canyon Crest). Silt fence is trenched in.
After excavation, foundation, and backfill additional perimeter sediment control wattles will be installed.
Approved for construction.
|
ESC18-00737
| Site Preparation | 8/24/2018 | 8/27/2018 | 8/27/2018 5:50:23 PM | A | PASS |
|
|
Dave Phone #: ###-####
Permit sign posted. Silt fence installed around the downslope perimeter of both lots which are both Canyon Crest). Silt fence is trenched in.
After excavation, foundation, and backfill additional perimeter sediment control wattles will be installed.
Approved for construction.
|
ESC17-00535
| General Inspection | 8/27/2018 | 8/27/2018 | 8/27/2018 5:47:41 PM | | CANC |
|
|
|
ESC18-00492
| General Inspection | 8/27/2018 | 8/27/2018 | 8/27/2018 1:14:46 PM | A | FAIL |
|
|
- no site preparation inspection requested as noted on permit documents and project description - no ESC permit sign posted - no construction entrance installed - concrete washout poured on the ground within site, no contaiment
Only BMP is inlet protection on the MS4 inlets on Rose Hill and south of site on Franklin @ Roosevelt.
- need to pay for re-inspection fee , complete corrections, and schedule Site Preparation inspection.
|
ESC17-00824
| General Inspection | 8/27/2018 | 8/27/2018 | 8/27/2018 12:43:04 PM | | PASS |
|
|
No new activity. Future SFH homesite, plans under review. Will keeep this permit open until that permit is active.
|
ESC14-00788
| Aging Inspection | 8/27/2018 | 8/27/2018 | 8/27/2018 12:21:45 PM | | PASS |
|
|
WIP on 2 SFHs. Common area landscaping and stabilization has been completed and is well established. Subdivision storm drains have sediment protection. No corrections.
|
ESC18-00213
| General Inspection | 8/24/2018 | 8/27/2018 | 8/27/2018 12:14:27 PM | A | PASS |
|
|
Trash picked up, alleys where road mix was recently dumped have been swept. Projects have a concrete washout pit that is lined.
|
ESC17-00869
| General Inspection | 8/27/2018 | 8/27/2018 | 8/27/2018 11:55:14 AM | | PEND |
|
|
No work yet - RP is incorrect. Project is mostly like for the postal boxes of Barber Junction.
|
ESC17-00501
| Site Final | 8/27/2018 | 8/27/2018 | 8/27/2018 11:46:40 AM | P | PASS |
|
|
Townhome complete, see ESC14-01083 for final corrections needed in phase 3 of Barber Valley Townhomes.
|
ESC17-00551
| Site Final | 8/27/2018 | 8/27/2018 | 8/27/2018 11:46:27 AM | P | PASS |
|
|
Townhome complete, see ESC14-01083 for final corrections needed in phase 3 of Barber Valley Townhomes.
|
ESC17-00550
| Site Final | 8/27/2018 | 8/27/2018 | 8/27/2018 11:46:10 AM | P | PASS |
|
|
Townhome complete, see ESC14-01083 for final corrections needed in phase 3 of Barber Valley Townhomes.
|
ESC16-00438
| Aging Inspection | 8/27/2018 | 8/27/2018 | 8/27/2018 11:45:10 AM | | PASS |
|
|
BLD permit expired/inactive. No exterior disturbance, no corrections needed. ESC permit finaled.
|
ESC16-00438
| DOC - Permit Finaled | 8/27/2018 | 8/27/2018 | 8/27/2018 11:44:39 AM | P | PASS |
|
|
|
ESC14-01083
| Site Final | 8/27/2018 | 8/27/2018 | 8/27/2018 11:43:39 AM | P | NR |
|
|
All townhome construction is complete. Allcommon areas are landscaped and stabilized. Some minor landscaping stockpiles and materials are on Sire need to be removed and area cleaned.
Corrections needed to get Site Final approval: - manaully sweep gutters on either sides of storm drains in phase 3 to capure dirt and debris around drain. - remove DI bags left in inlets in phase 3 - sweep streets as needed
RP to notify for inspection upon completion of corrections.
|
ESC17-00993
| Site Final | 8/27/2018 | 8/27/2018 | 8/27/2018 11:38:46 AM | P | PASS |
|
|
Townhome complete, see ESC14-01083 for final corrections needed in phase 3 of Barber Valley Townhomes.
|
ESC17-00994
| Site Final | 8/27/2018 | 8/27/2018 | 8/27/2018 11:38:28 AM | P | PASS |
|
|
Townhome complete, see ESC14-01083 for final corrections needed in phase 3 of Barber Valley Townhomes.
|
ESC17-00968
| Site Final | 8/27/2018 | 8/27/2018 | 8/27/2018 11:38:11 AM | P | PASS |
|
|
Townhome complete, see ESC14-01083 for final corrections needed in phase 3 of Barber Valley Townhomes.
|
ESC16-01560
| General Inspection | 8/27/2018 | 8/27/2018 | 8/27/2018 11:26:20 AM | | PASS |
|
|
Active staging inclduing tacified topsoil stockpile and employee parking for the Veranda project is occuring on the north side of BV drive. Concrete washout pan (for phases4-5) and stockpiles from previous project located on south side of road. These piles are to be removed within the next month. Trackout control and dust control will be required at that time.
No corrections requested, approved.
|