Inspections for the day of: Monday, August 27, 2018.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00306 General Inspection8/27/20188/27/20189/4/2018 12:56:04 PMAPEND
site being prepped for next phase of project, which will be permitted seperately. Will verify that any old netting no longer functioning as an ESC BMP has been removed during Site Preparation walk through. New phase to be covered under ESC18-01121
ESC15-00857 Conference8/27/20188/27/20188/27/2018 5:52:01 PMPDONE
pre-construction safety fence and initial ESC BMP check completed, for further details, see phase 10 permit ESC18-01022

No corrections for phase 9
ESC18-00738 Site Preparation8/24/20188/27/20188/27/2018 5:50:35 PMPPASS
Dave Phone #: ###-####


Permit sign posted. Silt fence installed around the downslope perimeter of both lots which are both Canyon Crest). Silt fence is trenched in.

After excavation, foundation, and backfill additional perimeter sediment control wattles will be installed.

Approved for construction.
ESC18-00737 Site Preparation8/24/20188/27/20188/27/2018 5:50:23 PMAPASS
Dave Phone #: ###-####

Permit sign posted. Silt fence installed around the downslope perimeter of both lots which are both Canyon Crest). Silt fence is trenched in.

After excavation, foundation, and backfill additional perimeter sediment control wattles will be installed.

Approved for construction.
ESC17-00535 General Inspection8/27/20188/27/20188/27/2018 5:47:41 PM CANC
ESC18-00492 General Inspection8/27/20188/27/20188/27/2018 1:14:46 PMAFAIL
- no site preparation inspection requested as noted on permit documents and project description
- no ESC permit sign posted
- no construction entrance installed
- concrete washout poured on the ground within site, no contaiment

Only BMP is inlet protection on the MS4 inlets on Rose Hill and south of site on Franklin @ Roosevelt.

- need to pay for re-inspection fee , complete corrections, and schedule Site Preparation inspection.
ESC17-00824 General Inspection8/27/20188/27/20188/27/2018 12:43:04 PM PASS
No new activity. Future SFH homesite, plans under review. Will keeep this permit open until that permit is active.
ESC14-00788 Aging Inspection8/27/20188/27/20188/27/2018 12:21:45 PM PASS
WIP on 2 SFHs. Common area landscaping and stabilization has been completed and is well established. Subdivision storm drains have sediment protection. No corrections.
ESC18-00213 General Inspection8/24/20188/27/20188/27/2018 12:14:27 PMAPASS
Trash picked up, alleys where road mix was recently dumped have been swept. Projects have a concrete washout pit that is lined.
ESC17-00869 General Inspection8/27/20188/27/20188/27/2018 11:55:14 AM PEND
No work yet - RP is incorrect. Project is mostly like for the postal boxes of Barber Junction.
ESC17-00501 Site Final8/27/20188/27/20188/27/2018 11:46:40 AMPPASS
Townhome complete, see ESC14-01083 for final corrections needed in phase 3 of Barber Valley Townhomes.
ESC17-00551 Site Final8/27/20188/27/20188/27/2018 11:46:27 AMPPASS
Townhome complete, see ESC14-01083 for final corrections needed in phase 3 of Barber Valley Townhomes.
ESC17-00550 Site Final8/27/20188/27/20188/27/2018 11:46:10 AMPPASS
Townhome complete, see ESC14-01083 for final corrections needed in phase 3 of Barber Valley Townhomes.
ESC16-00438 Aging Inspection8/27/20188/27/20188/27/2018 11:45:10 AM PASS
BLD permit expired/inactive. No exterior disturbance, no corrections needed. ESC permit finaled.
ESC16-00438 DOC - Permit Finaled8/27/20188/27/20188/27/2018 11:44:39 AMPPASS
ESC14-01083 Site Final8/27/20188/27/20188/27/2018 11:43:39 AMPNR
All townhome construction is complete. Allcommon areas are landscaped and stabilized.
Some minor landscaping stockpiles and materials are on Sire need to be removed and area cleaned.

Corrections needed to get Site Final approval:
- manaully sweep gutters on either sides of storm drains in phase 3 to capure dirt and debris around drain.
- remove DI bags left in inlets in phase 3
- sweep streets as needed

RP to notify for inspection upon completion of corrections.
ESC17-00993 Site Final8/27/20188/27/20188/27/2018 11:38:46 AMPPASS
Townhome complete, see ESC14-01083 for final corrections needed in phase 3 of Barber Valley Townhomes.
ESC17-00994 Site Final8/27/20188/27/20188/27/2018 11:38:28 AMPPASS
Townhome complete, see ESC14-01083 for final corrections needed in phase 3 of Barber Valley Townhomes.
ESC17-00968 Site Final8/27/20188/27/20188/27/2018 11:38:11 AMPPASS
Townhome complete, see ESC14-01083 for final corrections needed in phase 3 of Barber Valley Townhomes.
ESC16-01560 General Inspection8/27/20188/27/20188/27/2018 11:26:20 AM PASS
Active staging inclduing tacified topsoil stockpile and employee parking for the Veranda project is occuring on the north side of BV drive. Concrete washout pan (for phases4-5) and stockpiles from previous project located on south side of road. These piles are to be removed within the next month. Trackout control and dust control will be required at that time.

No corrections requested, approved.