ESC14-00657
| Conference | 8/28/2014 | 8/28/2014 | 8/28/2014 3:07:28 PM | P | DONE |
|
|
River Heights Sub # 6 Pre-construction meeting with developers, contractors, and Public Works engineers.
BMPs previously installed. Discussed ESC permit conditions and exchanged contact information for Laser Leveling and Nampa Excavation forement.
|
ESC13-00552
| Tracking Control | 8/25/2014 | 8/28/2014 | 8/28/2014 2:55:45 PM | P | PEND |
|
|
Need to have developer schedule street sweeper for all Sunny Ridge phase 2 streets.
Adam from Eaglewood Homes is going to request that developer have street sweeper for phase 2 this weekend. Will check back early next week.
|
ESC13-00344
| General Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 2:54:43 PM | | CANC |
|
|
rescheduled for 8/29
|
ESC13-00323
| General Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 2:40:28 PM | | PASS |
|
|
No trackout to streets. Some landscaping in place. 2 SFHs in progress. No corrections at this time. Stormwater drainage system is self contained and inlets have protection.
|
ESC14-00432
| Tracking Control | 8/26/2014 | 8/28/2014 | 8/28/2014 2:32:08 PM | P | FAIL |
|
|
Aralar park trackout inspection.
Sweeper with vacuum capabilities is needed on Lizaso and Cloverdale. Replenish construction entrance unless it is to be paved soon (provide schedule).
Verbal CN issued to project superviser Jerald from McMaster. Awaiting response.
|
ESC14-00656
| Conference | 8/28/2014 | 8/28/2014 | 8/28/2014 2:15:45 PM | P | PASS |
|
|
Met Kevin from ESI to discuss minor site prep activity and installation of perimeter silt fence prior to issuance BLD permit.
Approved to prep site with no excavation or BLD activities. Current use is gravel storage yard. BMPs are drop inlet protection on Overland and silt fence perimeter.
|
ESC13-01159
| General Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 1:58:28 PM | | PASS |
|
|
Peppermill streets have been installed. Hollandale is free of trackout and sediment in gutters. The silt lining the creek has been replaced during the process of community path installation. No breaches or breaks observed.
No corrections at this time, but will need to investigate need for perimeter BMPs on the downslope portions of the open spaces which are not yet stabilized.
|
ESC14-00003
| DOC - Permit Finaled | 8/28/2014 | 8/28/2014 | 8/28/2014 1:15:11 PM | P | PASS |
|
|
|
ESC14-00003
| Aging Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 1:14:50 PM | | PASS |
|
|
Demolition complete. Ground stabilized. ESC conditions met.
|
ESC14-00514
| Site Preparation | 8/27/2014 | 8/28/2014 | 8/28/2014 11:47:23 AM | A | PASS |
|
|
Josh Phone #: ###-####
Site walk through with project supervisor from EKC construction. All BMPs set up per ESC site plan, with one change to additional silt fence with wattle to the south of site. Permit posted and SWPPP is onsite. Approved.
|
ESC13-00966
| DOC - Permit Finaled | 8/28/2014 | 8/28/2014 | 8/28/2014 11:28:59 AM | P | PASS |
|
|
|
ESC13-00966
| General Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 11:28:35 AM | | PASS |
|
|
Home complete. All permits finaled. ESC conditions satisfied.
|
ESC13-00974
| General Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 11:22:52 AM | | PASS |
|
|
Finaled.
|
ESC13-00974
| DOC - Permit Finaled | 8/28/2014 | 8/28/2014 | 8/28/2014 11:22:39 AM | P | PASS |
|
|
Townhome complete and landscaped. ESC conditions satisfied.
|
ESC13-01001
| General Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 11:20:36 AM | | PASS |
|
|
Triplett townhome near completion. Needs landscaping. No violations.
|
ESC14-00848
| Site Preparation | 8/27/2014 | 8/28/2014 | 8/28/2014 10:24:57 AM | A | PASS |
|
|
call first to meet / Ryan Phone #: ###-####
New pool installation at existing foothills home. Permit posted, DI has inlet protection, and meet RP Ryan onsite. Access will be through adjacent lot. Daily sweeping of trackout will occur.
Approved.
|
ESC13-01268
| Aging Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 9:13:19 AM | | PASS |
|
|
|