PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, August 29, 2018
.
Number of inspections:
9
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
MIS18-00310
ESC-Conference
8/22/2018
8/29/2018
8/31/2018 3:08:03 PM
P
PEND
ESC17-00791
General Inspection
8/29/2018
8/29/2018
8/31/2018 2:58:59 PM
CANC
ESC13-01279
General Inspection
8/29/2018
8/29/2018
8/31/2018 2:58:39 PM
PASS
Final phase in NW corner near completion. Driveway has been poured, washout pan in Barber Crossing was utilized. Will need to check that area for cleaning for any spills. See ESC17-00018. No corrections at this time.
ESC17-00793
General Inspection
8/29/2018
8/29/2018
8/31/2018 2:46:26 PM
CANC
ESC15-00094
General Inspection
8/29/2018
8/29/2018
8/31/2018 2:46:17 PM
CANC
ESC17-01453
General Inspection
8/29/2018
8/29/2018
8/31/2018 1:25:45 PM
CANC
rescheduled for site final
ESC17-01479
Random Inspection
8/29/2018
8/29/2018
8/29/2018 10:43:58 AM
A
PASS
Subdivision private drive (Glencrest) and entry to Pierce Park is complete. Stormwater will flow west to an onsite sand window infiltration bed. Will need to protect during home building. No SFHs yet. Irrigation ditches through site have been placed underground. WIP on landscaping and tree installation.
ESC18-01029
Site Preparation
8/28/2018
8/29/2018
8/29/2018 10:34:31 AM
A
PASS
Terry - the Garden Artist
###-####
Thoren - Aloha Landscaping ###-####
BMPs installed per site plan. Review proper silt fence installation where stormwater runoff can flow off site on downhill side of project. Gator guard wattles install on area of access to back yard. Storm drain sediment filter bags installed on receiving inlets at Goldie & Outlook. Must be removed at end of job.
Retaining walls to placed in backyard must be approved by BLD inspector.
Permit sign board installed, ESC sign will come later this AM
ESC18-01022
General Inspection
8/29/2018
8/29/2018
8/29/2018 8:06:03 AM
A
CANC
data entry error