ESC18-00257
| Tracking Control | 8/23/2019 | 8/29/2019 | 8/30/2019 3:18:08 PM | P | CANC |
|
|
rescheduled
|
ESC18-01375
| Site Final | 8/21/2019 | 8/29/2019 | 8/30/2019 2:53:14 PM | P | PASS |
|
|
Building complete. Other ESC permits for site and remaining buildings are open
|
ESC18-01043
| Site Final | 8/27/2019 | 8/29/2019 | 8/30/2019 2:51:04 PM | P | PEND |
|
|
check for any remaining construction and request that all temporary BMPs (DI bags) be removed from Dropzone subdivsion.
|
ESC18-00866
| Site Final | 8/29/2019 | 8/29/2019 | 8/30/2019 2:15:39 PM | P | NR |
|
|
|
ESC19-00371
| Complaint Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 4:06:22 PM | P | PART |
|
|
fugitive dust complaint
- localized dust observed around equipmment movement. No wind blown dust occuring at time of inspection. Water truck onsite.
Lots of trackout and loose material on Trent Point. Will continue to monitor.
|
ESC19-00398
| Conference | 8/29/2019 | 8/29/2019 | 8/29/2019 3:22:28 PM | P | DONE |
|
|
RP will continue to sweep up the common driveway each day of work. After concrete for planter boxes is placed and backfill complete, constructin entrance or driveway will be required.
NO loose trash, trackout, or discharges.
Correction to install additional concrete washout and cleanup old washout areas.
|
ESC18-01635
| General Inspection | 8/26/2019 | 8/29/2019 | 8/29/2019 3:18:16 PM | A | PASS |
|
|
WIP. GC-RP paid to have pump truck washout offisite. Sidewak swept, backfill not placed yet
|
ESC18-01632
| General Inspection | 8/26/2019 | 8/29/2019 | 8/29/2019 3:17:54 PM | A | PASS |
|
|
WIP. GC-RP paid to have pump truck washout offisite. Sidewak swept, backfill not placed yet
|
ESC18-01631
| Site Final | 8/26/2019 | 8/29/2019 | 8/29/2019 3:12:39 PM | A | PASS |
|
|
HOme complete and landscaped. No corrections needed
|
ESC18-01531
| General Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 3:10:53 PM | P | PASS |
|
|
follow up inspection for trash pick up
Trash across the street picked up as requested. Sidewalk has been swept and dumped material scooped up. Roofing in progress, crew will need to pick up all waste packing materials in culdesac at end of the day.
|
ESC18-01225
| Site Final | 8/26/2019 | 8/29/2019 | 8/29/2019 2:55:55 PM | A | PASS |
|
|
Addition complete and disturbed area stabilized. No temp BMPs. ESC permit finaled.
|
ESC18-01225
| Tracking Control | 8/26/2019 | 8/29/2019 | 8/29/2019 2:55:11 PM | A | CANC |
|
|
data entry error
|
ESC18-01531
| Conference | 8/29/2019 | 8/29/2019 | 8/29/2019 12:44:36 PM | P | CANC |
|
|
|
ESC19-00935
| Site Preparation | 8/29/2019 | 8/29/2019 | 8/29/2019 12:42:51 PM | A | PASS |
|
|
w/ John RP
Silt fence perimeter on down gradient site border and irrigation ditch has been properly installed. SWPPP permit posted. Construction to begin next week or following week, will post City of boise ESC permit sign and install heavy duty construction entrance.
|
ESC19-00324
| General Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 12:38:35 PM | P | PEND |
|
|
Crews have returned to work on site. Water truck onsite for dust control. No trackout observed. No corrections, dry conditions and forecast. Will conitnue to inspect weekly.
|
ESC18-01025
| DOC - Permit Finaled | 8/29/2019 | 8/29/2019 | 8/29/2019 8:11:24 AM | P | PASS |
|
|
backyard pool, open trade permits. ESC permit expired
|
ESC18-01147
| Aging Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 8:10:49 AM | | CANC |
|
|
|
ESC18-01147
| DOC - Permit Finaled | 8/29/2019 | 8/29/2019 | 8/29/2019 8:10:44 AM | P | PASS |
|
|
Project complete, no ESC requests
|