Inspections for the day of: Thursday, August 29, 2019.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00257 Tracking Control8/23/20198/29/20198/30/2019 3:18:08 PMPCANC
rescheduled
ESC18-01375 Site Final8/21/20198/29/20198/30/2019 2:53:14 PMPPASS
Building complete. Other ESC permits for site and remaining buildings are open
ESC18-01043 Site Final8/27/20198/29/20198/30/2019 2:51:04 PMPPEND
check for any remaining construction and request that all temporary BMPs (DI bags) be removed from Dropzone subdivsion.
ESC18-00866 Site Final8/29/20198/29/20198/30/2019 2:15:39 PMPNR
ESC19-00371 Complaint Inspection8/29/20198/29/20198/29/2019 4:06:22 PMPPART
fugitive dust complaint

- localized dust observed around equipmment movement. No wind blown dust occuring at time of inspection. Water truck onsite.

Lots of trackout and loose material on Trent Point. Will continue to monitor.
ESC19-00398 Conference8/29/20198/29/20198/29/2019 3:22:28 PMPDONE
RP will continue to sweep up the common driveway each day of work. After concrete for planter boxes is placed and backfill complete, constructin entrance or driveway will be required.

NO loose trash, trackout, or discharges.

Correction to install additional concrete washout and cleanup old washout areas.
ESC18-01635 General Inspection8/26/20198/29/20198/29/2019 3:18:16 PMAPASS
WIP. GC-RP paid to have pump truck washout offisite. Sidewak swept, backfill not placed yet
ESC18-01632 General Inspection8/26/20198/29/20198/29/2019 3:17:54 PMAPASS
WIP. GC-RP paid to have pump truck washout offisite. Sidewak swept, backfill not placed yet
ESC18-01631 Site Final8/26/20198/29/20198/29/2019 3:12:39 PMAPASS
HOme complete and landscaped. No corrections needed
ESC18-01531 General Inspection8/29/20198/29/20198/29/2019 3:10:53 PMPPASS
follow up inspection for trash pick up

Trash across the street picked up as requested. Sidewalk has been swept and dumped material scooped up. Roofing in progress, crew will need to pick up all waste packing materials in culdesac at end of the day.
ESC18-01225 Site Final8/26/20198/29/20198/29/2019 2:55:55 PMAPASS
Addition complete and disturbed area stabilized. No temp BMPs. ESC permit finaled.
ESC18-01225 Tracking Control8/26/20198/29/20198/29/2019 2:55:11 PMACANC
data entry error
ESC18-01531 Conference8/29/20198/29/20198/29/2019 12:44:36 PMPCANC
ESC19-00935 Site Preparation8/29/20198/29/20198/29/2019 12:42:51 PMAPASS
w/ John RP

Silt fence perimeter on down gradient site border and irrigation ditch has been properly installed. SWPPP permit posted. Construction to begin next week or following week, will post City of boise ESC permit sign and install heavy duty construction entrance.
ESC19-00324 General Inspection8/29/20198/29/20198/29/2019 12:38:35 PMPPEND
Crews have returned to work on site. Water truck onsite for dust control. No trackout observed. No corrections, dry conditions and forecast. Will conitnue to inspect weekly.
ESC18-01025 DOC - Permit Finaled8/29/20198/29/20198/29/2019 8:11:24 AMPPASS
backyard pool, open trade permits. ESC permit expired
ESC18-01147 Aging Inspection8/29/20198/29/20198/29/2019 8:10:49 AM CANC
ESC18-01147 DOC - Permit Finaled8/29/20198/29/20198/29/2019 8:10:44 AMPPASS
Project complete, no ESC requests