ESC15-00509
| General Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 4:51:29 PM | | CANC |
|
|
|
ESC16-00993
| Random Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 4:51:18 PM | P | PASS |
|
|
Work has now started at the Fairview Burger King. No violations observed
|
ESC15-01552
| BMP Violation | 8/2/2016 | 8/3/2016 | 8/3/2016 4:50:21 PM | P | PASS |
|
|
Leaking washout area is now no longer leaking and the puddle and trackout is now swept up.
Initial response is good, need to remove the trash and dried concrete/stucco waste on Thursday and Friday.
No discharges or trackout
|
ESC15-01355
| Aging Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 3:14:44 PM | | CANC |
|
|
rescheduled for tomorrow
|
ESC16-00243
| General Inspection | 8/1/2016 | 8/3/2016 | 8/3/2016 2:26:58 PM | P | FAIL |
|
|
follow up inspection to BMP violation
Trash was not emptied at time of inspection...escalation pending. 2nd request issued via phone
|
ESC15-00857
| Conference | 8/1/2016 | 8/3/2016 | 8/3/2016 2:21:41 PM | P | PASS |
|
|
Corrections requested have been completed. Streets (Arrow Villa & Goshawk) were swept and all DIs in #8 and #7 were changed out and cleaned around inlets.
Site is to be active next week with road installation. Requested that slope interuption/sediment trapping wattle be installed 75 yards up from entrance off Arrow Villa be installed on the right hand side that banks down to where the road will be.
|
ESC16-00036
| Aging Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 12:36:19 PM | | PASS |
|
|
Project near completion. Remodel structure, exterior, and foundation complete. BLD still open.
Small patch of dirt between garage and driveway is source of small amount of trackout. Looks like it will be finished/stabilized. Will keep ESC open till paved over/tstabilized.
|
ESC16-00128
| DOC - Permit Finaled | 8/3/2016 | 8/3/2016 | 8/3/2016 12:36:04 PM | P | PASS |
|
|
|
ESC16-00128
| Aging Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 12:35:37 PM | | PASS |
|
|
Project construction is complete, no loose dirt. Disturbed area vegetated, driveway paved. No temp BMPs remaining.on or around site. Permit finaled.
|
ESC16-00384
| General Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 12:20:24 PM | P | PASS |
|
|
WIP paving cement pads for storage buildings. Site is graded below street level, should retain stormwater onsite. Access drives and parking are not yet installed. No fugitive dust or trackout observed at time of inspection.
Large lined concrete washout is provided. Approved.
|
ESC16-00128
| DOC - Permit Finaled | 8/3/2016 | 8/3/2016 | 8/3/2016 12:14:15 PM | P | PASS |
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
ESC15-01574
| General Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 10:12:42 AM | | PASS |
|
|
Pool is complete as well as the pool house and surrounding patio & landscaping. Active projects in progress on the west end of Barber Valley Townhomes project - temp BMP to remaini installed. This ESC permit finaled.
|
ESC15-01574
| DOC - Permit Finaled | 8/3/2016 | 8/3/2016 | 8/3/2016 10:11:25 AM | P | PASS |
|
|
|
ESC15-00660
| General Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 9:25:33 AM | | PASS |
|
|
Home is near completion. Rear hillside area is stable with more vegetation in progress. Driveway is now paved. No corrections, will continue to monitor.
|
ESC15-00463
| General Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 8:03:33 AM | | CANC |
|
|
Alto Via still under investigation and is closed
|