Inspections for the day of: Tuesday, August 30, 2016.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00288 BMP Violation8/29/20168/30/20168/30/2016 4:40:32 PMPPART
RP working on cleaning up site after notification on non-compliance. Follow up scheduled for tomorrow.
ESC16-00203 Aging Inspection8/30/20168/30/20168/30/2016 4:39:26 PM PASS
WIP on SFH. Permit sign posted on power pole. No trackout. Site appears to have been swept recently. No MS4 inlets in area. No violations.
ESC15-01224 General Inspection8/30/20168/30/20168/30/2016 4:09:14 PM PASS
New Library project has stabilized paving and stormwater infrastructure installed. WIP on structure. Trash and materials seperated and contained. No trackout,discharges, or fugitive dust observed. Approved.
ESC15-00729 General Inspection8/30/20168/30/20168/30/2016 3:53:38 PM PASS
WIP on paving roads. Some minor trackout to Barber is occuring but street sweeping trucks are scheduled. No discharges, no fugitive dust issues. Approved.
ESC16-00941 Site Preparation8/26/20168/30/20168/30/2016 3:37:53 PMPPASS
3 PM w/ Dave ###-####

Site walk through performed with RP and site supervisor for initial excavation and utility work. Reviewed SWPPP map and installation of perimeter sediment control silt fence. Site will have two rock construction entrances that are not yet installed. Reviewed rules regarding trackout and cement washout containment.

Water truck is already onsite for dust control. Chainlink fencing will enclose the site.

Approved for construciton. Will follow up next week to check on initial work and BMP conditions.
ESC16-01108 BMP Violation8/25/20168/30/20168/30/2016 2:55:24 PMAPEND
check for location permit and SWPPP on site. Unable to locate at this time
ESC16-00872 General Inspection8/30/20168/30/20168/30/2016 2:28:44 PMPPASS
WIP on frame for SFH. No trackout or sediment runoff. Trash contained. No violations observed.
ESC15-01483 General Inspection8/30/20168/30/20168/30/2016 1:48:31 PMPPASS
WIP. Surrounding streets, sidewalks and gutters are free of loose dirt & other materials. No discharges, DI's have fileter bag protection.

No correction requested
ESC16-00385 General Inspection8/30/20168/30/20168/30/2016 12:26:16 PMPPASS
WIP on frame. Permit sign clealy posted w/ contact details listed. No trackout or discharges observed
ESC15-01287 General Inspection8/30/20168/30/20168/30/2016 12:14:37 PM PART
Sidewalk sweep up and sweeping loose sediment requested to RP. No discharges, WIP on landscaping and boulder placement.
ESC16-00525 General Inspection8/30/20168/30/20168/30/2016 12:08:26 PMPPASS
WIP on garage structure. No loose materials or discharges leaving site. RP/GC on duty , permit sign posted.
ESC15-00541 Conference8/30/20168/30/20168/30/2016 11:11:26 AMPPASS
RP/developer informed me that topsoil has no been applied to slopes around development pads and in the stormwater pond constructed for Hackberry Ranch. A hydroseed mixture will be applied within the next 1-2 weeks (weather permitting).

No violation or issues observed at site.
ESC16-00989 Site Preparation8/30/20168/30/20168/30/2016 11:05:44 AMPPASS
ESC permit sign posted, receiving storm drain has inlet protection. Homeowner/developer is RP and Extreme Excavation has two RPs on duty.

Perimeter wattles are installed around the slopes. Road into steep lot will be cut today. Rock construction entrance installed and additional sediment control wattles will be installed to contain steep area above site entrance.

Approved for construction. RP requested permission to stockpile sand from this site across Bogus Basin Road. Will be inspected under Hackberry Ranch I permit, HR phase II will begin in a month (permit applications have been submitted)
ESC16-00101 Aging Inspection8/30/20168/30/20168/30/2016 10:30:27 AM PASS
ESC16-00285 Aging Inspection8/30/20168/30/20168/30/2016 9:35:02 AM PASS
ESC16-00254 Aging Inspection8/30/20168/30/20168/30/2016 8:46:03 AM PASS
Monument sign at new Honda is installed and surrounding area stabilized. ESC permit for dealership still open for temp. BMP removal requirements. No further inspecitons on this permit.
ESC16-00254 DOC - Permit Finaled8/30/20168/30/20168/30/2016 8:45:10 AMPPASS