ESC16-00288
| General Inspection | 8/30/2016 | 8/31/2016 | 9/2/2016 10:18:27 AM | P | PASS |
|
|
Sidewalk, street and gutter have been swept clean. Perimeter wattles re-installed. No trackout or discharges observed. Permit sign posted.
Site is back in compliance, approved.
|
ESC16-00966
| General Inspection | 8/31/2016 | 8/31/2016 | 8/31/2016 4:33:26 PM | P | PEND |
|
|
report of excessive dust coming off large stockpile...
Informed RP of issue. Called with update from field.
Excavator now in process of removing stockpile. Any remaining backfill that is in a windy location may be moved to the adjacent parcel, which is owned by Canyon Crest.
Will verify corrections tomorrow.
|
ESC15-01078
| Site Final | 8/2/2016 | 8/31/2016 | 8/31/2016 3:19:15 PM | P | FAIL |
|
|
Final warning to remove DI bag in storm drain on Old Sport. No other violations occuring. Multiple requests already issued to CBH.
|
ESC16-00216
| Site Preparation | 8/31/2016 | 8/31/2016 | 8/31/2016 1:13:10 PM | P | PASS |
|
|
Clint Phone #: ###-####
BMPs installed; permit posted. Active projects in compliance. Approved.
|
ESC16-00185
| Aging Inspection | 8/31/2016 | 8/31/2016 | 8/31/2016 12:13:48 PM | | PASS |
|
|
WIP on frame. No discharge or spills from site. No trackout. Subdivision BMPs installed.
|
ESC16-00425
| DOC - Permit Finaled | 8/31/2016 | 8/31/2016 | 8/31/2016 12:10:37 PM | P | PASS |
|
|
Home construciton complete. Site is landscaped and stabilized. No other corrections or actions needed. Permit finaled.
|
ESC16-00425
| DOC - Permit Finaled | 8/31/2016 | 8/31/2016 | 8/31/2016 12:09:33 PM | P | PASS |
|
|
Home complete and landscaped. Sidewalk and street in front of home cleaned. DI bag to remain installed during active construction on street.
|
ESC16-00232
| DOC - Permit Finaled | 8/31/2016 | 8/31/2016 | 8/31/2016 12:07:18 PM | P | PASS |
|
|
Home complete and landscaped. No temp. BMP removal required due to active SFHs in RH#6. Conditions satisfied.
|
ESC16-00390
| Site Final | 8/15/2016 | 8/31/2016 | 8/31/2016 12:01:08 PM | A | NR |
|
|
rescheduled
|
ESC16-01117
| Site Preparation | 8/31/2016 | 8/31/2016 | 8/31/2016 11:58:03 AM | P | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted. First new units of new DHE phase #14. Inlets have protection. Concrete washout to be constructed prior to foundation
|
ESC16-01120
| Site Preparation | 8/31/2016 | 8/31/2016 | 8/31/2016 11:57:41 AM | P | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted. First new units of new DHE phase #14. Inlets have protection. Concrete washout to be constructed prior to foundation
|
ESC14-01083
| General Inspection | 8/31/2016 | 8/31/2016 | 8/31/2016 11:50:22 AM | | PART |
|
|
Park Place sub in progress. No development or infrastructure work remaining. Onsite inlets have filter bags installed. Individual units are permitted/inspected seperately. No trackout or fugitive dust. Large portable washout for cement trucks is located across the BV Drive.
RP for Brighton Homes to build a new onsite liquid washout for wall-board and paint. I also requested these sub-contractors be warned about washing out on driveways and gutters.
Correction issued to Brighton Homes regarding wall board material being washed out in gutter near stormdrain. Inlet bag to be replaced, material swept up, and training with culprit performed.
|
ESC16-00148
| BMP Violation | 8/31/2016 | 8/31/2016 | 8/31/2016 11:35:31 AM | A | FAIL |
|
|
Wallboard material and/or plaster material washout in gutter next storm drain within Park Place. DI filter bag full of solidfied material. Need to change out before end of the day. Will check back tomorrow AM.
Verbal CN issued to Erbie w/ Brighton
|
ESC16-01060
| Site Preparation | 8/31/2016 | 8/31/2016 | 8/31/2016 11:17:29 AM | A | PASS |
|
|
Inspection requested via web by Erby Gonzales
4 new units starting in the recently complete phase of Barber Valley townhomes. Permit sign posted. Concrete washout containment is onsite, and storm drains have sediment filter protection. Approved.
|
ESC16-01058
| Site Preparation | 8/31/2016 | 8/31/2016 | 8/31/2016 11:17:16 AM | A | PASS |
|
|
Inspection requested via web by Erby Gonzales
4 new units starting in the recently complete phase of Barber Valley townhomes. Permit sign posted. Concrete washout containment is onsite, and storm drains have sediment filter protection. Approved.
|
ESC16-01059
| Site Preparation | 8/31/2016 | 8/31/2016 | 8/31/2016 11:17:00 AM | A | PASS |
|
|
Inspection requested via web by Erby Gonzales
4 new units starting in the recently complete phase of Barber Valley townhomes. Permit sign posted. Concrete washout containment is onsite, and storm drains have sediment filter protection. Approved.
|
ESC16-01055
| Site Preparation | 8/31/2016 | 8/31/2016 | 8/31/2016 11:16:46 AM | A | PASS |
|
|
Inspection requested via web by Erby Gonzales
4 new units starting in the recently complete phase of Barber Valley townhomes. Permit sign posted. Concrete washout containment is onsite, and storm drains have sediment filter protection. Approved.
|
ESC15-01391
| General Inspection | 8/31/2016 | 8/31/2016 | 8/31/2016 10:23:41 AM | | PASS |
|
|
WIP on private estate poolhouse. No violations observed.
|
ESC15-01569
| Aging Inspection | 8/31/2016 | 8/31/2016 | 8/31/2016 8:56:47 AM | | PASS |
|
|
|