PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, August 31, 2017
.
Number of inspections:
39
Percentage of inspections complete:
95 %
Percentage of inspections not complete:
5 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-00302
General Inspection
8/24/2017
8/28/2017
A
ESC16-00849
Complaint Inspection
8/30/2017
8/31/2017
9/8/2017 3:02:22 PM
P
DONE
resolved
ESC15-00731
General Inspection
8/31/2017
8/31/2017
8/31/2017 4:10:48 PM
CANC
ESC17-00971
BMP Violation
8/30/2017
8/31/2017
8/31/2017 3:21:20 PM
P
PEND
ESC17-00796
Site Final
8/31/2017
8/31/2017
8/31/2017 3:19:58 PM
P
PASS
No further ESC inspections required. Homeowner to complete landscaping on own. No temporary BMPs need to be removed.
ESC16-01243
Site Final
8/30/2017
8/31/2017
8/31/2017 3:08:04 PM
P
CANC
ESC16-01719
General Inspection
8/31/2017
8/31/2017
8/31/2017 3:06:21 PM
PASS
ESC16-01395
General Inspection
8/25/2017
8/31/2017
8/31/2017 3:06:12 PM
A
CANC
ESC17-00842
Tracking Control
8/29/2017
8/31/2017
8/31/2017 3:06:05 PM
A
FAIL
check for track out clean up; reassess grading once L3 is offsite
Trackout has been swept, though some still remains and additional sweeping is necessary.
No extra rock installed as requested. Grading is complete. Next phase is retaining wall.
ESC16-01472
Site Preparation
8/31/2017
8/31/2017
8/31/2017 3:04:52 PM
P
CANC
duplicate inspection
ESC16-01530
Aging Inspection
8/31/2017
8/31/2017
8/31/2017 3:01:41 PM
CANC
ESC15-00541
General Inspection
8/31/2017
8/31/2017
8/31/2017 3:01:32 PM
CANC
ESC16-01722
General Inspection
8/31/2017
8/31/2017
8/31/2017 3:01:15 PM
PASS
see main site permit ESC15-00853
ESC16-01472
Site Preparation
8/31/2017
8/31/2017
8/31/2017 2:21:09 PM
P
PASS
David ###-####
Current access is off Logan street, which is gravel leading up to site. Excavator is to preserve vegetation below the foundation footprint . Once access to Shaw Mtn is establish a construction entrance will be installed. Excavator to clear flat parking/staging area below site on Logan.
Approved for construciton.
ESC16-01472
Site Final
8/31/2017
8/31/2017
8/31/2017 12:30:59 PM
P
CANC
ESC15-00729
General Inspection
8/31/2017
8/31/2017
8/31/2017 12:13:12 PM
CANC
rescheduled for 9/6
ESC16-01438
General Inspection
8/31/2017
8/31/2017
8/31/2017 12:12:44 PM
PASS
Project complete. No corrections. All permits finaled.
ESC16-01438
DOC - Permit Finaled
8/31/2017
8/31/2017
8/31/2017 12:12:27 PM
P
PASS
ESC17-00924
Site Final
8/3/2017
8/31/2017
8/31/2017 12:11:18 PM
A
CANC
check for pool completion.
rescheduled
ESC17-00011
General Inspection
8/31/2017
8/31/2017
8/31/2017 12:10:39 PM
P
PASS
No trackout or fugitive dust observed at time of inspection. Parking lot around hotel footprint is now installed. Using adajacent parcels for frame staging.
Corrections:
- maintenance is needed on DI bags on Elder. RP Bob stated, curb work is finished next week and will sweep street and empty /re-install bags.
- need to clean up unlined washout pit in stockpile area.
- if stockpile continues to be inactive, it will need temporary stabilization with vegetation or cover. RP states that Knife River will begin hauling off stockpile within the next two weeks.
ESC17-00404
General Inspection
8/31/2017
8/31/2017
8/31/2017 11:52:13 AM
P
PART
No trackout or fugitive dust observed at time of inspection. Parking lot around hotel footprint is now installed. Using adajacent parcels for frame staging.
Corrections:
- maintenance is needed on DI bags on Elder. RP Bob stated, curb work is finished next week and will sweep street and empty /re-install bags.
- need to clean up unlined washout pit in stockpile area.
- if stockpile continues to be inactive, it will need temporary stabilization with vegetation or cover. RP states that Knife River will begin hauling off stockpile within the next two weeks.
ESC17-00308
General Inspection
8/31/2017
8/31/2017
8/31/2017 11:35:49 AM
P
PASS
Project located south side of buidling. Foundation for addition is installed. Ground around work area has already been stabilized with asphalt due to project being in parking lot. No violations. WIP
ESC16-01467
Aging Inspection
8/31/2017
8/31/2017
8/31/2017 11:34:11 AM
PASS
Home complete and landscaped. No disturbed area or temp BMPs remaining
ESC16-01467
DOC - Permit Finaled
8/31/2017
8/31/2017
8/31/2017 11:34:02 AM
P
PASS
ESC16-01512
General Inspection
8/31/2017
8/31/2017
8/31/2017 11:33:24 AM
CANC
ESC16-01617
General Inspection
8/31/2017
8/31/2017
8/31/2017 11:32:43 AM
CANC
ESC16-01468
Aging Inspection
8/31/2017
8/31/2017
8/31/2017 11:32:25 AM
PASS
Home complete and landscaped. No disturbed area or temp BMPs remaining
ESC16-01468
DOC - Permit Finaled
8/31/2017
8/31/2017
8/31/2017 11:32:16 AM
P
PASS
ESC16-01465
Aging Inspection
8/31/2017
8/31/2017
8/31/2017 11:16:12 AM
PASS
Home complete and landscaped. No disturbed area or temp BMPs remaining
ESC16-01465
DOC - Permit Finaled
8/31/2017
8/31/2017
8/31/2017 11:15:42 AM
P
PASS
ESC17-00203
General Inspection
8/31/2017
8/31/2017
8/31/2017 10:35:23 AM
P
PASS
WIP on frame. BMPs installed. Water truck onsite, not currently in use. No fugitive dust observed. No trackout. SWPPP binder onsite and inspection reports are logged. No corrections.
ESC16-01292
General Inspection
8/31/2017
8/31/2017
8/31/2017 10:33:55 AM
P
PASS
WIP. Staging and equipment yard compact with road mix and in use. Floor/foundation poured . No trackout or fugitive dust. Permit sign posted. Approved.
ESC16-00982
General Inspection
8/31/2017
8/31/2017
8/31/2017 10:32:47 AM
P
PASS
project now covered under ESC16-01292. No violations. Permit finaled.
ESC16-00982
DOC - Permit Finaled
8/31/2017
8/31/2017
8/31/2017 10:31:56 AM
P
PASS
ESC16-00843
Site Final
8/30/2017
8/31/2017
8/31/2017 10:22:03 AM
A
NR
9:15 meeting with Layton Construction
Disturbed area around stormwater pond has been hydroseeded but no significant vegetation established.
Will continue to monitor.
Meet Layton contact Brent at Gowen Business Park. Site is set up for initial rough grading. Working without issued GRD or ESC. Issued fine for early start, will pay when pick up permit.
ESC15-00976
General Inspection
8/31/2017
8/31/2017
8/31/2017 9:08:01 AM
PASS
ESC16-01460
Aging Inspection
8/31/2017
8/31/2017
8/31/2017 8:06:49 AM
PASS
ESC16-01460
DOC - Permit Finaled
8/31/2017
8/31/2017
8/31/2017 8:06:44 AM
P
PASS
MIS17-00282
ESC-Conference
8/30/2017
8/31/2017
A