ESC13-01279
| General Inspection | 8/4/2016 | 8/4/2016 | 8/5/2016 1:56:48 PM | | PASS |
|
|
WIP on townhomes on the east side of Pheasant Tail. Individual SFH permits issued, sites are clean temp BMPs installed including washout and storm drain protection. All construction on the south Caddis culdesac is complete and landscaped - individual ESC permit for those have been closed out.
|
ESC15-01288
| General Inspection | 8/4/2016 | 8/4/2016 | 8/5/2016 12:49:16 PM | | PASS |
|
|
No activity at site during inspection. BMPs at entrance are installed. No dust issues observed or reported. Permit sign and SWPPP info posted. Approved.
|
ESC16-00242
| General Inspection | 8/4/2016 | 8/4/2016 | 8/5/2016 12:27:07 PM | P | PASS |
|
|
Heavy duty rock construction entrance installed, permit sign and SWPPP sign posted. Perimeter silt fence in good condtion. No trackout, no fugitive. WIP on foundation work. No corrections requested.
|
ESC14-00206
| General Inspection | 8/4/2016 | 8/4/2016 | 8/5/2016 11:45:21 AM | | PASS |
|
|
duplicate inspection
|
ESC15-01355
| General Inspection | 8/3/2016 | 8/4/2016 | 8/5/2016 11:31:58 AM | P | PASS |
|
|
Home complete and landscaped; listed for sale. All permits finaled. No temp BMP removal required due to active construction.
|
ESC16-00439
| General Inspection | 8/4/2016 | 8/4/2016 | 8/5/2016 11:25:03 AM | P | PASS |
|
|
Work has resumed at Bonneville. No trackout, site is graded below road level and surrounding vegetation has been preserved. Very flat site. Road bases are being prepped. Water truck on site for dust control. Approved.
|
ESC15-00745
| General Inspection | 8/4/2016 | 8/4/2016 | 8/5/2016 11:05:00 AM | P | PASS |
|
|
Permit and SWPPP sign posted. No trackout to Federal Way, no fugitve observed. Onsite inspecitons conducted by contractor and Micron - no issues reported.
|
ESC16-00406
| Complaint Inspection | 8/4/2016 | 8/4/2016 | 8/4/2016 5:01:23 PM | P | PART |
|
|
Dust complaint received.
1 water truck on site and two excavators were grubbing/rough grading and moving dirt from two locations within the Highlands Cove subdivision. Initial plans to have onsite water tank were not possible due to location of nearest hydrant.
While onsite the truck is effective at minimalizing the dust, however when filling up water it takes approximately 15-20 minutes - during which excavators continue to operate, making more significant amount of dust during that time and the appearance that there is no dust control at site.
Correction request issued to developer:
- Need to have two water trucks onsite that stagger their loads so that we can have a truck onsite and active while excavation is taking place. The alternative would be to cease excavation when the dust control water truck is filling up.
Site will be inactive tomorrow. Work will resume Saturday and the developer stated there should be two water trucks.
|
ESC15-00942
| General Inspection | 8/4/2016 | 8/4/2016 | 8/4/2016 11:45:02 AM | | PEND |
|
|
to be finaled with adjacent project completion due to shared BMPs and access area
|
ESC16-00135
| Aging Inspection | 8/4/2016 | 8/4/2016 | 8/4/2016 11:43:08 AM | | PASS |
|
|
Project complete. No ESC issues. All permits finaled.
|
ESC16-00135
| DOC - Permit Finaled | 8/4/2016 | 8/4/2016 | 8/4/2016 11:42:31 AM | P | PASS |
|
|
|
ESC15-01091
| General Inspection | 8/4/2016 | 8/4/2016 | 8/4/2016 11:42:15 AM | | PASS |
|
|
No activity. Site currently stable. Perimeter wattle installed in the runoff location of lot.
|
ESC16-00975
| Site Preparation | 8/4/2016 | 8/4/2016 | 8/4/2016 8:33:15 AM | P | PASS |
|
|
Installation of pool at active hillside SFH. BMPs already installed. Reviewed washout and trackout rules to contractor. Approved for construction.
|
ESC16-00966
| Site Preparation | 8/3/2016 | 8/4/2016 | 8/3/2016 2:23:59 PM | A | PASS |
|
|
Larry Phone #: ###-####
Permit sign posted with contact info, perimter wattles and silt fence installed around site, and downstream DIs have inlet protection. Approved for excavation. Called Larry to notify I did inspection since I was already in Eyrie Canyon.
|