Inspections for the day of: Friday, August 4, 2017.
Number of inspections: 31
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00625 General Inspection8/2/20178/4/20178/11/2017 10:51:17 AMPCANC
ESC17-00774 General Inspection8/3/20178/4/20178/4/2017 4:59:14 PMAPEND
report of dewatering, no dewatering plan or notice received

Dewatering operation set up for land application to pasture land between Parkcenter Blvd and Warm Springs Bypass road. North of parkcenter and to the west of Barber Drive water is being detained for infiltration/evaporation.

No discharges offsite or to waterway/storm drain.. Slow pump rate, water coming up is not turbid.

Will follow up for update to SWPPP.
ESC17-00959 Random Inspection8/4/20178/4/20178/4/2017 3:12:51 PMPPASS
ESC16-00437 General Inspection8/4/20178/4/20178/4/2017 3:12:28 PM PASS
ESC16-00436 General Inspection8/4/20178/4/20178/4/2017 3:12:17 PM PASS
ESC16-00435 General Inspection8/4/20178/4/20178/4/2017 3:05:26 PM PASS
ESC16-00159 General Inspection8/4/20178/4/20178/4/2017 2:40:55 PMPPASS
MIllbrook was swept, DI bags on west side of road removed, and some trash picked up in the open area between Milbrook and Warm Springs Creek. Construction materials and equipment have been removed.

Need to sweep east side gutter of Milbrook, some trash remaining needs to be picked up. Alleyways still have some inlets with DI bags. Will notify Blackrock RP and check next inspection.
ESC16-01140 General Inspection8/4/20178/4/20178/4/2017 2:39:47 PMPPASS
Corrections complete:
- trash picked up
- stockpiles in road removed and cleaned.
- street was swept
- contruction equipment and materials removed.

No further corrections.

Home complete. NO further ESC inspections. Area covered by ESC16-00159
ESC16-01142 Site Final8/4/20178/4/20178/4/2017 2:34:29 PMPPASS
Home complete, landscaped and ready for occupation. No ESC requests/corrections.
ESC16-01143 DOC - Permit Finaled8/4/20178/4/20178/4/2017 2:32:09 PMPPASS
ESC17-00748 BMP Violation8/4/20178/4/20178/4/2017 1:43:08 PMPPART
City of Boise ESC permit posted, construction entrance installed on Bird and to the north access to Hackamore. Currently installing underground utilities and hauling away grubbed topsoil. Topsoil stockpile and loading into trucks is main source of dust. Site does not have a designated water truck, but one that is moving between sites. No excessive dust at time of inspection, but did receive complaint this moring about fugitive dust and no water suppresion.


Violations:
- no site preparation inspection requested, informed RP John of the policy/requireement

Correction request:
- have designated water truck for site
- sweep access to Hackamore

- need to update sign to have current CGP 2017 required signage.
ESC16-01582 General Inspection8/4/20178/4/20178/4/2017 1:10:28 PMPPASS
WIP on SFHs at Odom Estates. BMPs installed. No trackout or discharges to 26th or west on Neff.
ESC17-00959 Site Preparation8/4/20178/4/20178/4/2017 1:09:38 PMPCANC
data entry error
ESC17-00971 Site Preparation8/3/20178/4/20178/4/2017 1:08:55 PMACANC
Rod 505 ###-####

Approved for grubbing Thursday...

rescheduled for Monday
ESC16-00948 General Inspection8/4/20178/4/20178/4/2017 1:06:27 PM PASS
Overfull concrete washout was cleaned up. No new washout provided, but no new foundation excavation occuring currently. Will request new SFHs to provide individual washout facilities.

DIs have sediment filter bags installed. No trackout to 28th, no discharges/spills. Approved.
ESC17-00102 General Inspection8/2/20178/4/20178/4/2017 1:02:59 PMAPEND
No activitiy at site. RP on permit is no longer onsite per Granite Excavation.

Notified developer that site appears to not have a CGP 2017 NOI in "active" status.
ESC17-00842 Conference8/4/20178/4/20178/4/2017 10:26:45 AMAFAIL
site not ready for construction. BMPs installed improperly
ESC15-00853 General Inspection8/4/20178/4/20178/4/2017 9:59:43 AM PASS
ESC16-01332 General Inspection8/4/20178/4/20178/4/2017 9:59:18 AM PASS
ESC16-01323 DOC - Permit Finaled8/4/20178/4/20178/4/2017 9:50:44 AMPPASS
ESC16-01324 Aging Inspection8/4/20178/4/20178/4/2017 9:50:22 AM PASS
Townhome complete and landscaped, no activity at site. Rest of Idaho St. Townhomes project covered by main site permit ESC15-00976 and new townhomes will have ESC permits issued. No ESC violations observed at site.
ESC16-01324 DOC - Permit Finaled8/4/20178/4/20178/4/2017 9:50:12 AMPPASS
ESC16-01322 Aging Inspection8/4/20178/4/20178/4/2017 9:50:01 AM PASS
Townhome complete and landscaped, no activity at site. Rest of Idaho St. Townhomes project covered by main site permit ESC15-00976 and new townhomes will have ESC permits issued. No ESC violations observed at site.
ESC16-01322 DOC - Permit Finaled8/4/20178/4/20178/4/2017 9:49:53 AMPPASS
ESC16-01325 Aging Inspection8/4/20178/4/20178/4/2017 9:49:41 AM PASS
Townhome complete and landscaped, no activity at site. Rest of Idaho St. Townhomes project covered by main site permit ESC15-00976 and new townhomes will have ESC permits issued. No ESC violations observed at site.
ESC16-01325 DOC - Permit Finaled8/4/20178/4/20178/4/2017 9:49:31 AMPPASS
ESC16-01323 Aging Inspection8/4/20178/4/20178/4/2017 9:49:18 AM PASS
Townhome complete and landscaped, no activity at site. Rest of Idaho St. Townhomes project covered by main site permit ESC15-00976 and new townhomes will have ESC permits issued. No ESC violations observed at site.
ESC16-00523 General Inspection8/4/20178/4/20178/4/2017 9:37:57 AM CANC
ESC16-01006 General Inspection8/4/20178/4/20178/4/2017 9:36:52 AM CANC
ESC16-01218 Aging Inspection8/4/20178/4/20178/4/2017 9:36:15 AM CANC
ESC15-00957 General Inspection8/4/20178/4/20178/4/2017 9:36:03 AM CANC