Inspections for the day of: Monday, August 5, 2019.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01244 General Inspection8/2/20198/5/20198/13/2019 3:41:38 PMPCANC
ESC19-00601 BMP Violation8/2/20198/5/20198/12/2019 8:09:02 AMPPEND
concrete washout dumped across street in vacant lot

RP-GC has agreed to clean up. Jones Homes is on warning
ESC19-00114 Conference8/5/20198/5/20198/7/2019 4:40:57 PMPCANC
ESC19-00324 Conference8/2/20198/5/20198/6/2019 4:03:49 PMPDONE
Meeting with site stormwater team to plan for corrections.

Silt fence and wattle installation to occur Wednesday. Awaiting new site map and other corrective actions detailed in the NOV.
ESC18-00803 General Inspection8/5/20198/5/20198/6/2019 4:02:47 PM CANC
ESC19-00241 General Inspection8/2/20198/5/20198/6/2019 4:02:32 PMACANC
ESC18-00853 Site Final8/5/20198/5/20198/6/2019 4:02:19 PMPNR
Di bags still installed on south side of River.
ESC19-00237 Complaint Inspection8/5/20198/5/20198/6/2019 7:07:08 AMPPASS
complaint about dust and dirt mess on this site and two other sites on this street.

No trackout, fugitive dust, or discharges observed at site.
ESC17-00692 Aging Inspection8/5/20198/5/20198/5/2019 12:02:28 PM CANC
ESC19-00779 Site Preparation8/5/20198/5/20198/5/2019 11:56:51 AMPCANC
rescheduled
ESC18-00755 General Inspection8/5/20198/5/20198/5/2019 11:07:47 AM CANC
ESC17-00971 Aging Inspection8/5/20198/5/20198/5/2019 11:04:59 AM PASS
ESC18-00426 General Inspection8/5/20198/5/20198/5/2019 10:53:50 AM PART
Subdivsion is clean, Red Oak home still onsite.

Correction request to Willie to change out the storm drain sediment bag on Woodcreek
ESC18-01540 Site Final8/5/20198/5/20198/5/2019 10:49:46 AMPNR
Correction request:

- change out DI bag on Woodcreek; empty and re-install

Verbal correction to Willie.

ESC19-00074 Site Final8/5/20198/5/20198/5/2019 10:39:00 AMPPASS
ESC18-01704 Site Final8/5/20198/5/20198/5/2019 10:38:42 AMPPASS
ESC18-00497 Site Final8/2/20198/5/20198/5/2019 10:18:22 AMANR
Will continue to monitor revegetation. No corrections. Wattle and silt fence are still installed between Joplin and Thurmna Drain.
ESC19-00099 Site Final8/5/20198/5/20198/5/2019 10:14:40 AMPPASS
Compost pick up station storage and parking lot is complete and stabilized. No ESC corrections needed.
ESC19-00034 Site Preparation8/2/20198/5/20198/5/2019 10:05:05 AMAPASS
9:30 AM Jeremy

Work to begin Wednesday, starting with pipework first.

Permit sign posted. RP onsite.

- construction entrance to be installed this week.
- request to leave vegetative strip between and parking lot on south side
- protect private storm drain in parking lot
- dust control required
- request that stockpile heights be kept lover than fence lines
ESC18-01162 BMP Violation8/2/20198/5/20198/5/2019 10:02:13 AMPCANC
see ESC19-00601
ESC18-00853 General Inspection8/5/20198/5/20198/5/2019 8:17:59 AM CANC
ESC17-01070 Aging Inspection8/5/20198/5/20198/5/2019 8:17:35 AM CANC