ESC15-00807
| Site Preparation | 8/6/2015 | 8/6/2015 | 8/6/2015 4:44:55 PM | P | PASS |
|
|
Permit sign is posted; excavation to begin tomorrow. Entry will be through alleyway. Approved to begin construction.
Low risk infill site, DI on 30th and Madison will need to be protected.
|
ESC15-00806
| Site Preparation | 8/6/2015 | 8/6/2015 | 8/6/2015 4:44:35 PM | P | PASS |
|
|
Permit sign is posted; excavation to begin tomorrow. Entry will be through alleyway. Approved to begin construction.
Low risk infill site, DI on 30th and Madison will need to be protected.
|
ESC14-01035
| Tracking Control | 8/6/2015 | 8/6/2015 | 8/6/2015 4:01:01 PM | P | PART |
|
|
Landscaping in progress. Crew has tracked dirt out to street and gutter as well as rocks being installed for landscaping groundcover. WIP and should be swept at end of day. RP was responsive and stated corrections and clean up will be completed today and tomorrow.
Will check back tomorrow - near completion in landscaping
|
ESC14-01151
| General Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 3:42:20 PM | | PASS |
|
|
WIP. Home near completion. Yard not yet landscaped or stabilized. Street and sidewalk in front of home are clean. No corrections at this time.
|
ESC15-00293
| DOC - Permit Finaled | 8/6/2015 | 8/6/2015 | 8/6/2015 3:27:01 PM | P | PASS |
|
|
BLD open but earth work and foundation work are complete. No further ESC inspections needed, Yard is stabilized, no materials or loose sediment on site.
|
ESC15-00293
| Aging Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 2:05:47 PM | | PASS |
|
|
|
ESC15-00706
| General Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 12:44:11 PM | P | PART |
|
|
RP Gregg to install DI bag protection on storm drain in front of house. Some minor trackout of sediment should be swept out of street and gutter.
Post yellow permit sign. Gregg stated corrections will be completed tomorrow AM. Will check Friday or Monday.
|
ESC11-00879
| General Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 11:00:35 AM | | PASS |
|
|
WIP on SFHs in Somerset Village. Streets and gutters are clean, perimeter BMPs on vacant lots installed and at bottom of site along Boise Hills.
|
ESC13-00806
| General Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 10:49:37 AM | | PASS |
|
|
WIP on interior. Construction entrance and silt fence in good condition, no trackout or sediment leaving site.
|
ESC13-00918
| General Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 10:48:54 AM | | PASS |
|
|
no changes at site. Former staging area still surrounded by silt fence BMP.
|
ESC15-00467
| General Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 10:43:01 AM | A | PASS |
|
|
WIP.. Perimeter BMPs installed, no trackout or discahrges. Trash and materials are contained. No corrections issued.
|
ESC15-00166
| Site Final | 8/6/2015 | 8/6/2015 | 8/6/2015 10:06:57 AM | A | PASS |
|
|
4-plex at west end of newest Aberdeen phase (Winston & Fry) is complete. All permits finaled. Landscaping complete. Dumpsters removed. WIP on east end of phase.
|
ESC15-00167
| Site Final | 8/6/2015 | 8/6/2015 | 8/6/2015 10:05:02 AM | A | PASS |
|
|
4-plex at west end of newest Aberdeen phase (Winston & Fry) is complete. All permits finaled. Landscaping complete. Dumpsters removed. WIP on east end of phase.
|
ESC15-00169
| DOC - Permit Finaled | 8/6/2015 | 8/6/2015 | 8/6/2015 10:04:15 AM | P | PASS |
|
|
|
ESC15-00169
| General Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 10:01:43 AM | | PASS |
|
|
4-plex at west end of newest Aberdeen phase (Winston & Fry) is complete. All permits finaled. Landscaping complete. Dumpsters removed. WIP on east end of phase.
|
ESC15-00168
| General Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 10:00:45 AM | | PASS |
|
|
4-plex at west end of newest Aberdeen phase (Winston & Fry) is complete. All permits finaled. Landscaping complete. Dumpsters removed. WIP on east end of phase.
|
ESC15-00168
| DOC - Permit Finaled | 8/6/2015 | 8/6/2015 | 8/6/2015 9:58:14 AM | P | PASS |
|
|
|
ESC14-01106
| General Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 9:08:18 AM | | PASS |
|
|
|
ESC14-00941
| General Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 8:54:07 AM | | PASS |
|
|
WIP on hangar interior and also site improvements. No trackout, fugitive dust, or erosion issues on site.
|