Inspections for the day of: Monday, August 6, 2018.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00018 General Inspection8/3/20188/6/20188/9/2018 12:12:54 PMAPASS
follow up
- Blackrock alley sweeping
- HH concrete washout pan relocated & clean up

Concrete washout bin was moved away from storm drain as requested. Streets are free of trackout, some alleys have loose dust & dirt from vehicles pulling off lots. Sedimetn protection installed. No new corrections.
ESC15-01288 General Inspection8/6/20188/6/20188/9/2018 11:15:56 AM CANC
ESC16-01253 General Inspection8/6/20188/6/20188/7/2018 11:59:01 AM CANC
ESC17-01262 Site Final8/3/20188/6/20188/7/2018 11:25:50 AMAPASS
Demo complete. New SFH in progress on parcel (now 1622 Michigan) with ESC17-01340. No ESC violations at site. This permit finaled.
ESC17-00400 General Inspection8/6/20188/6/20188/7/2018 10:46:39 AM CANC
ESC18-01071 General Inspection8/2/20188/6/20188/6/2018 4:41:06 PMPFAIL
Correction request:

- sweep Oregon Ridge street (before Tuesday)
- water truck should operate at all times during grading activity. Two water trucks were onsite, on re-filling and one was being serviced so there was no dust control at time of inspection.
- Water down site access route as well as construction site. Very thick dust when water truck leaves the site.
- Suez will not let L3 fill their onsite tank is also part of the problem at the site.
ESC17-00519 General Inspection8/6/20188/6/20188/6/2018 4:40:48 PMPPASS
No new activity. No SFHs yet. Reported to be a CBH subdivision. Will need to install concrete washout as soon as first BLD permit for homes is issued. This is so they will not use the washout that is designated for Bonneville subdivsion phase #2.
ESC17-01488 General Inspection8/6/20188/6/20188/6/2018 4:38:59 PMPPASS
Site grading completed, now working on foundation and should be vertical soon. No trackout, fugitive dust, or other violations observed.
ESC18-00267 General Inspection8/6/20188/6/20188/6/2018 4:28:07 PMPPASS
ESC18-00267 DOC - Permit Finaled8/6/20188/6/20188/6/2018 4:27:54 PMPPASS
see ESC17-01488 for ESC coverage
ESC17-00422 General Inspection8/6/20188/6/20188/6/2018 4:26:05 PM PASS
Project near completion. No immediate corrections, just will need to remove all temporary BMPs (storm drain inlet protection at Vista and Canal) and clean up any loose trash around perimeter before ESC site final approval
ESC17-01360 BMP Violation8/6/20188/6/20188/6/2018 4:26:05 PMPFAIL
concrete washout maintenance and clean up needed

Concrete washout pan is overfull and slurry spilled all over road in addition to oil leaks and spills around the washout.

48 hr correction notice:
- provide new washout pan. Re-locate to an open lot if possible and 50 ft or more distance from storm drain.
- clean up street and replace damaged sediment bags and gravel bag check dams.
ESC18-00645 DOC - Permit Finaled8/6/20188/6/20188/6/2018 3:51:39 PMPPASS
ESC18-00644 DOC - Permit Finaled8/6/20188/6/20188/6/2018 3:47:19 PMPPASS
ESC17-00939 General Inspection8/6/20188/6/20188/6/2018 12:21:13 PM PASS
WIP on interior. Curbing and sidewalk installed around perimeter. Storm drain has sediment protection installed. SWPPP info posted. No corrections requested.
ESC18-00963 General Inspection8/2/20188/6/20188/6/2018 10:18:14 AMACANC
inspection/conference conducted 8/3