Inspections for the day of: Tuesday, August 6, 2019.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00311 General Inspection8/6/20198/6/20198/13/2019 3:44:32 PM CANC
ESC17-00954 General Inspection8/6/20198/6/20198/13/2019 3:43:25 PM CANC
ESC19-00779 Site Preparation8/5/20198/6/20198/8/2019 10:38:32 AMPCANC
rescheduled
ESC18-00363 General Inspection8/6/20198/6/20198/7/2019 4:41:11 PM PASS
ESC18-00940 Site Final8/1/20198/6/20198/7/2019 11:47:25 AMPPASS
ESC17-01488 General Inspection8/1/20198/6/20198/7/2019 11:47:16 AMPPASS
No new activity. Building appears to be vacant. Will check for site final next inspection
ESC18-01206 General Inspection7/24/20198/6/20198/7/2019 11:46:06 AMAPASS
9 AM Micron Campus inspection

Project complete, no ESC requests
ESC18-00616 General Inspection7/24/20198/6/20198/7/2019 11:45:36 AMAPASS
9 AM Micron Campus inspection

- updated SWPPP binders and site maps; weekly site inspections; permit info posted
- designated construction access route and track-out control
- storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron.
- large capacity lined concrete washout containment pit
- covered trash dumpsters/material separation
- containers for material and equipment storage prevent exposure to rain
- spill kits located in various locations around site.
- water trucks on duty to keep down dust.

No violations observed. Site is clean, BMPs are installed correctly, SWPPP record keeping is satisfactory. No correction requests at this time, Micron projects are currently in compliance.
ESC18-00251 General Inspection7/24/20198/6/20198/7/2019 11:45:18 AMAPASS
9 AM Micron Campus inspection

- updated SWPPP binders and site maps; weekly site inspections; permit info posted
- designated construction access route and track-out control
- storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron.
- large capacity lined concrete washout containment pit
- covered trash dumpsters/material separation
- containers for material and equipment storage prevent exposure to rain
- spill kits located in various locations around site.
- water trucks on duty to keep down dust.

No violations observed. Site is clean, BMPs are installed correctly, SWPPP record keeping is satisfactory. No correction requests at this time, Micron projects are currently in compliance.
ESC19-00911 General Inspection7/24/20198/6/20198/7/2019 11:44:58 AMAPASS
9 AM Micron Campus inspection
ESC18-00006 General Inspection7/24/20198/6/20198/7/2019 11:44:41 AMACANC
9 AM Micron Campus inspection

see site final
ESC16-00242 General Inspection7/24/20198/6/20198/7/2019 11:43:52 AMACANC
9 AM Micron Campus inspection

see site final
ESC18-01005 General Inspection7/24/20198/6/20198/7/2019 11:42:23 AMAPASS
9 AM Micron Campus inspection

see also detailed Micron Inspection report for August 6, 2019.

- updated SWPPP binders and site maps; weekly site inspections; permit info posted
- designated construction access route and track-out control
- storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron.
- large capacity lined concrete washout containment pit
- covered trash dumpsters/material separation
- containers for material and equipment storage prevent exposure to rain
- spill kits located in various locations around site.
- water trucks on duty to keep down dust.

No violations observed. Site is clean, BMPs are installed correctly, SWPPP record keeping is satisfactory. No correction requests at this time, Micron projects are currently in compliance.

Walkway project still open
ESC18-01121 General Inspection8/6/20198/6/20198/7/2019 9:39:11 AM PEND
ESC17-01484 Aging Inspection8/6/20198/6/20198/7/2019 8:26:19 AM CANC
ESC16-01278 General Inspection8/6/20198/6/20198/7/2019 8:25:22 AM CANC
rescheduled for site final
ESC17-01111 Aging Inspection8/6/20198/6/20198/7/2019 8:23:20 AM CANC
ESC19-00839 General Inspection7/23/20198/6/20198/5/2019 10:52:20 AMAPASS
Grading and infrastructure in progress. No trackout. Permit posted.

Fugitive dust control water truck doing a good job keeping dust down.