PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, August 7, 2017
.
Number of inspections:
26
Percentage of inspections complete:
96 %
Percentage of inspections not complete:
4 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-00711
General Inspection
8/3/2017
8/7/2017
8/14/2017 10:56:19 AM
A
PASS
ESC16-00561
General Inspection
8/7/2017
8/7/2017
8/14/2017 10:16:51 AM
CANC
ESC16-00353
General Inspection
8/7/2017
8/7/2017
8/11/2017 11:35:44 AM
CANC
ESC15-00762
General Inspection
8/7/2017
8/7/2017
8/11/2017 11:27:55 AM
CANC
ESC16-01187
General Inspection
8/4/2017
8/7/2017
8/10/2017 10:26:12 AM
A
PASS
Wallboard material and dust in gutter and sidewalk has been swept. No trackout or discharges at site. No new corrections requested.
ESC17-00992
Site Preparation
8/7/2017
8/7/2017
8/9/2017 4:40:46 PM
P
PASS
ESC16-00990
General Inspection
8/7/2017
8/7/2017
8/9/2017 4:40:31 PM
CANC
ESC16-01512
General Inspection
8/4/2017
8/7/2017
8/8/2017 3:59:15 PM
P
CANC
ESC16-01167
General Inspection
8/4/2017
8/7/2017
8/8/2017 3:58:45 PM
A
CANC
ESC15-00857
General Inspection
8/4/2017
8/7/2017
8/8/2017 3:58:18 PM
A
PASS
call jill to scheduled monday AM
Inspection of new access road and entrance at Eyrie Way. Road is road mix and should prevent trackout. RP & developer agree to monitor trackout and prevent/clean up as necessary. Storm drain inlet on Eyrie Way has had sediment filter mat installed. Drainage routes and stormwater retention/sediment basins have been installed and shall be inspected & maintained.
ESC crew to work on drainage ditches on either side of the fire access portion of Arrow Villa. Addition of top soil to encourage vegetation growth, increase soil water retention, and to direct water to roadway/gutter to storm drain drop inlets.
No violations observed at time of inspection. No ESC corrections requested.
ESC15-00306
General Inspection
8/7/2017
8/7/2017
8/8/2017 3:38:40 PM
CANC
ESC16-00878
Aging Inspection
8/7/2017
8/7/2017
8/8/2017 3:38:28 PM
CANC
ESC16-00670
Aging Inspection
8/7/2017
8/7/2017
8/7/2017 12:42:35 PM
CANC
ESC14-00206
General Inspection
8/7/2017
8/7/2017
8/7/2017 12:42:12 PM
CANC
ESC16-00096
Complaint Inspection
8/7/2017
8/7/2017
8/7/2017 12:37:02 PM
P
FAIL
Parking lot washed off with no sediment removal or sweeping.
Need to sweep gutter on Fairmeadow all the way to receiving storm drain.
ESC15-01613
General Inspection
8/7/2017
8/7/2017
8/7/2017 10:41:05 AM
CANC
ESC15-00556
General Inspection
8/7/2017
8/7/2017
8/7/2017 10:20:33 AM
A
PART
Trash at sites contained. Lots of excavation and foundation work occuring this week, so a thorough sweeping will be needed at end of week. Storm drains have sediment protection. Lined concrete washout on Taboo culdesac being utilized and has remaining capacity.
Partial for street sweeping request. Will follow up at end of week.
ESC16-01650
General Inspection
8/7/2017
8/7/2017
8/7/2017 10:18:30 AM
A
PASS
Vegetation to south of clearing limits has been preserved. Lots have been graded for future SFHs and access road and utilities are installed. Crews onsite installing fence and VSI applying hydroseed in common areas. Subdivsion irrigation is already installed. No trackout, discharges, or fugitive dust observed approved.
Will check the west side revegetation at end of access road next inspection.
ESC17-00649
Site Preparation
8/4/2017
8/7/2017
8/7/2017 10:08:24 AM
A
PART
Clint Phone #: ###-####
Permit sign posted. Need to install DI protection on south side of Taboo culdesac before excavation.
Verbal correction to Clint.
ESC17-00648
Site Preparation
8/4/2017
8/7/2017
8/7/2017 10:06:17 AM
A
PART
Clint Phone #: ###-####
Permit sign posted. Need to install DI protection on south side of Taboo culdesac before excavation.
Verbal correction to Clint.
ESC16-00687
Aging Inspection
8/7/2017
8/7/2017
8/7/2017 8:55:54 AM
CANC
ESC16-00877
Aging Inspection
8/7/2017
8/7/2017
8/7/2017 8:55:15 AM
CANC
ESC13-00806
General Inspection
8/7/2017
8/7/2017
8/7/2017 8:54:47 AM
CANC
ESC15-01169
Aging Inspection
8/7/2017
8/7/2017
8/7/2017 8:54:38 AM
CANC
ESC16-00973
General Inspection
8/7/2017
8/7/2017
8/7/2017 8:16:02 AM
CANC
ESC16-01167
General Inspection
8/3/2017
8/7/2017
P