Inspections for the day of: Tuesday, August 7, 2018.
Number of inspections: 28
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01182 General Inspection8/7/20188/7/20188/9/2018 11:33:30 AM PASS
Home complete and landscaped. Temp BMPs for lot have been removed. ESC permit conditions satisfied.
ESC17-01305 General Inspection8/7/20188/7/20188/9/2018 11:17:15 AM CANC
rescheduled for site final
ESC17-00692 General Inspection8/7/20188/7/20188/9/2018 11:09:58 AM CANC
ESC17-01135 General Inspection8/6/20188/7/20188/9/2018 10:49:40 AMACANC
ESC18-00498 General Inspection8/7/20188/7/20188/7/2018 4:48:25 PMPPASS
Site grading under way. Dust control is very good. No violations observed. Site is contained by silt fence at bottom of site. As grading is completed (tracking on slopes being conducted now) ESC controls will be implemented in September.

Correction request to complete maintenance on silt fence section that was downed as noted in previous inspection.
ESC18-00801 Complaint Inspection8/7/20188/7/20188/7/2018 4:46:14 PMPPART
dust, no sweeping, signs and trash laying around?


Permit signs posted in window. RP on site sweeping street. There is dust during activity but not constant and at time of inspection adequate water was being applied.

Correction request:
- sweep streets. ok to rinse since water flows back into site & no receiving storm drain.
- warning to keep equipment speeds low and get a good watering in before activity as well as during.

Will check on site conditions later in the week.
ESC18-00678 Complaint Inspection8/7/20188/7/20188/7/2018 4:45:59 PMPPART
dust, no sweeping, signs and trash laying around?

Permit signs posted in window. RP on site sweeping street. There is dust during activity but not constant and at time of inspection adequate water was being applied.

Correction request:
- sweep streets. ok to rinse since water flows back into site & no receiving storm drain.
- warning to keep equipment speeds low and get a good watering in before activity as well as during.

Will check on site conditions later in the week.
ESC17-00455 General Inspection8/7/20188/7/20188/7/2018 4:38:44 PM PASS
WIP. Talked to RP , project is still in progress. No corrections requested. Site contained.
ESC17-00190 General Inspection8/7/20188/7/20188/7/2018 4:34:23 PM PASS
No recent activity or changes to site. BMPs installed. May need adjustment once precipitation returns as well as targeted revegetation in some areas that are sparse.
ESC17-01113 Complaint Inspection8/7/20188/7/20188/7/2018 3:19:10 PMPPART
Complaint regarding road obstruction.

No parking or ROW issues. Permit sign posted, concrete washout utized. No trackout or sediment runoff.

Correction request to onsite carpenter Ben to clean up the spilled concrete slurry on road. It is almost dry and can be easily. Will check back Friday
ESC18-00383 Site Final8/7/20188/7/20188/7/2018 3:16:20 PMPPASS
Wall installed. Site now covered by ESC18-00099.
ESC18-00906 Random Inspection8/7/20188/7/20188/7/2018 3:12:38 PMPPART
Wall installed, no trackout or sediment leaving site.

Will remind Boise Building Co of the permit posting requirement.
ESC18-00911 DOC - Permit Finaled8/7/20188/7/20188/7/2018 3:10:41 PMPPASS
Retaining wall installed. Now working on SFH, see ESC18-00785
ESC18-00844 Complaint Inspection8/7/20188/7/20188/7/2018 2:43:28 PMPPEND
Concern over parking for site employees. Street is narrow and curvy, which could limit visibility and access to homes further up. Will review a parking plan with RP. RP is to schedule onsite conference. Initial BMPs are already installed, but no excavation yet.
ESC18-00984 General Inspection8/7/20188/7/20188/7/2018 2:29:53 PMPPASS
WIP on patio and site improvements. Using adjacent empty lot for access and some staging. Disturbed area will need stabilization/revegetation after work is complete.

No trackout or discharges. No disturbance outside clearing limits.
ESC18-00888 Site Preparation8/6/20188/7/20188/7/2018 11:58:49 AMAPASS
Clayton Phone #: ###-####

Approved for construction. RP on duty. Iniitial BMPs installed. Sediment controls along the frontage to be installed after foundation excavation.
ESC17-01449 General Inspection8/7/20188/7/20188/7/2018 11:58:03 AMPPASS
ESC17-00286 Aging Inspection8/7/20188/7/20188/7/2018 11:28:21 AM PASS
NO trackout or discharges. WIP on foundation. Checking for permit status.
ESC17-01340 General Inspection8/7/20188/7/20188/7/2018 11:27:49 AMPPASS
No activity at time of inspection. Foundation is poured. No sediment leaving site.
ESC17-00400 Site Final8/7/20188/7/20188/7/2018 11:08:40 AMAPASS
Kevin w/ ESI

Building complete. Surrounding landscaping and pathways are installed. Grass is growing well. No temporary BMPs left onsite. Some minor work conducted by Timberline facility staff next to the trailor.

ESC permit conditions satisfied.
ESC18-00312 Random Inspection8/7/20188/7/20188/7/2018 10:46:26 AMAFAIL
No ESC permit sign posted.

Need to install sediment control BMP along the creek/canal channel. Less than 50 ft vegetative buffer.

RP is going to schedule onsite conference. He is a new interim RP and taking the class later this month.
ESC18-00622 Complaint Inspection8/3/20188/7/20188/7/2018 9:55:45 AMACANC
wrong address. This site pending BLD permit for new home after demolition.
ESC17-00767 Aging Inspection8/7/20188/7/20188/7/2018 8:20:04 AM CANC
ESC17-00219 Aging Inspection8/7/20188/7/20188/7/2018 8:15:56 AM CANC
ESC17-00446 General Inspection8/7/20188/7/20188/7/2018 8:14:59 AM CANC
ESC04-01240 DOC - Permit Finaled8/7/20188/7/20188/7/2018 8:13:03 AMPPASS
ESC03-01256 DOC - Permit Finaled8/7/20188/7/20188/7/2018 8:10:26 AMPPASS
ESC04-00431 DOC - Permit Finaled8/7/20188/7/20188/7/2018 8:10:19 AMPPASS