Inspections for the day of: Thursday, September 10, 2015.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00373 Aging Inspection9/10/20159/10/20159/11/2015 12:44:58 PM PASS
Earthwork for addition complete. Yard and vegetation surrounding work area was preserved. BLD open, homeowner RP. NO further ESC inspections needed.
ESC15-00463 General Inspection9/10/20159/10/20159/10/2015 4:00:16 PMPPART
Project started without site preparation inspection. No permit sign posted.

Wattle installed at toe of slope and surrounding hillside vegetation has been preserved. No significant issues but Bruno Built needs to schedule site preparation inspections on all foothills homes.
ESC13-00213 General Inspection9/10/20159/10/20159/10/2015 3:38:23 PM PASS
Crew onsite working on re-grading and re-surfacing driveway. Unapproved walls have been removed and replaced by rock walls and site has been landscaped. Slopes have been hydroseeded in areas.

No discharges or sediment leaving site. No corrections issued.
ESC14-00809 Complaint Inspection9/10/20159/10/20159/10/2015 3:15:50 PMPPART
Dust complaint received by code enforcement...

Dust complaint occured during the foundation excavation, which is now complete. No dust at time of inspecion, concrete workers working on foundation.

Called builder Justin to discuss stabilized entrance and trackout controls. Currently no construction entrance and trackout and dust occurs when used.

Sewer tap is supposed to be scheduled for next week, I will wait to for completion of that but warned that rock entrance will be required if it can't be paved. Long, relatively steep, driveway slope with create problem during wetter months.
ESC13-00259 Site Final9/10/20159/10/20159/10/2015 2:52:02 PMPPASS
All construction complete. Hillside have vegetated/stabilized. DI bags on Millet have been pulled as requested. Permanent stormwater features complete, all temp BMPs removed except a few degradable wattles on the upper hillside.

No further ESC inspections. Permit conditions satisfied.
ESC14-00657 General Inspection9/10/20159/10/20159/10/2015 2:42:40 PM PART
All BMPs good and active SFHs are in compliance.

1 correction:
Washout is about 75% full, new washout needed. Dispose of old washout properly.
ESC15-00742 Site Preparation9/10/20159/10/20159/10/2015 2:39:37 PMPPASS
Clint Phone #: ###-#### Permit posted. East Valley BMPs installed. Active projects keeping clean. Approved.

ESC13-00230 General Inspection9/10/20159/10/20159/10/2015 2:21:45 PM PASS
WIP on SFHs in RH#5 by Brighton and Alturas. Streets and gutters do not have loose sediment or trackout. Most of phase complete excepet upper street Grand Prairie. Lined washout provided off Grand Prairie. No corrections for subdivision BMPs
ESC15-00392 Aging Inspection9/10/20159/10/20159/10/2015 11:45:44 AM PASS
Construction complete. No outstanding ESC issues. All permits finaled.
ESC15-00392 DOC - Permit Finaled9/10/20159/10/20159/10/2015 11:44:45 AMPPASS
ESC14-00299 Conference9/10/20159/10/20159/10/2015 11:16:47 AMADONE
10:30 AM to discuss SWO issued yesterday

Arrived on site to see workers carrying in supplies for interior work and a seperate preparing to install sewer line. I explained the Stop Work Order means no work and noted that no work had been done all week prior to the SWO, with the exception of making the following corrections:

To remove SWO:
1. Post yellow ESC sign
2. Clean up all debris and uncontained washouts around the lot.
3. Sweep gutter and sidewalk
4. Properly install erosion and sediment control BMPs. Specifically a wire backed silt fence along the bottom of the site that is trenched in after the area along the fence is cleaned and dirt moved off neighbors fence.
5. Install wattles that are on site properly. Trench and stake in along back of house.

6. Resolve/submit plans for walls, site grading, and other hillside requirements with PW Civil Engineer. Address questions of the engineer.

I warned that no work should occur unless it is related to the corrections. Workers were onsite when I left but were being asked to leave.
ESC15-00210 General Inspection9/10/20159/10/20159/10/2015 10:25:54 AM PART
WIP. Frame is up but interior and exterior work remains. Yard is not yet stabilzed or landscaped but surrounded by perimeter silt fence on the downhill sides. Limits of clearing have been observed and no hillside erosion from site runoff observed. No trackout or spills.

Corrections:
-pick up wind blown trash in backyard and outside of silt fence
- retrench silt fence in areas where it has come up.
ESC11-00192 General Inspection9/10/20159/10/20159/10/2015 10:17:07 AM PASS
NO new subdivision activity. Streets and gutters are free of loose sediment and trackout. 3 active SFHs are in good condition. No corrections issued.
ESC14-00664 General Inspection9/10/20159/10/20159/10/2015 10:08:50 AM PASS
No activity. Site is locked with chainlink fencing. Hillside retaining walls complete, surrounding vegetation is beginning to establish.
ESC13-00193 General Inspection9/10/20159/10/20159/10/2015 9:55:35 AM PASS
No construction activity. Perimeter BMPs and DI sediment protection provided. Jayo crew recently retrenched wattles below on Painted Feather. No trackout or discharges observed.
ESC12-01066 General Inspection9/10/20159/10/20159/10/2015 8:53:04 AM PEND