Inspections for the day of: Monday, September 10, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00984 Aging Inspection9/10/20189/10/20189/10/2018 4:45:14 PM PASS
WIP on detached garage. Frame is up. No ESC issues.
ESC18-00225 Site Final9/10/20189/10/20189/10/2018 4:17:42 PMPPASS
Home complete and landscaped. ESC permit conditions for home are satisfied, see ESC18-00020 for all remaining ESC BMP removal. This permit finaled.
ESC17-01713 Site Final9/10/20189/10/20189/10/2018 4:16:59 PMPPASS
Home complete and landscaped. ESC permit conditions for home are satisfied, see ESC18-00020 for all remaining ESC BMP removal. This permit finaled.
ESC18-00048 Site Final9/10/20189/10/20189/10/2018 4:14:32 PMPPASS
Home complete and landscaped. ESC permit conditions for home are satisfied, see ESC18-00020 for all remaining ESC BMP removal. This permit finaled.
ESC17-01715 Site Final9/10/20189/10/20189/10/2018 4:10:33 PMPPASS
Home complete, landscaped, cleaned, and listed for sale. Temp BMPs on street and surrounding areas covered by main HRN permit, see ESC18-00020
ESC18-00084 Site Final9/10/20189/10/20189/10/2018 4:08:31 PMPNR
Need to pick up discarded wattles and silt fence post around the home site before final. HOme is complete, landscaped & occupied.
ESC18-00629 Random Inspection9/10/20189/10/20189/10/2018 4:05:38 PMPPASS
ESC18-00495 General Inspection9/10/20189/10/20189/10/2018 4:05:03 PMPPASS
ESC18-00892 General Inspection9/10/20189/10/20189/10/2018 3:39:35 PMPPASS
Framing in progress. Trash contained, permit posted. No discharges.

Area behind fence used for access may require revegetation upon completion of homes along Millbrook
ESC14-01083 Site Final9/10/20189/10/20189/10/2018 3:25:53 PMPPASS
All streets and gutters have been swept clean. Debris captured by flaps of storm drian bags & grates has been removed. All temporary storm drain protection has been removed. All areas disturbed are now stabilized and landscaped.
Phase 1 & 2 of Park Place Townhomes are complete, this ESC permit finaled. Stockpile to the west of site is covered by ESC16-01650.

ESC17-00618 General Inspection9/10/20189/10/20189/10/2018 11:53:03 AM PASS
WIP on exterior finish. Storm drains still have sediment bags installed. These will need to be removed in order to get ESC site final approval.

No violations observed.
ESC18-00180 General Inspection9/10/20189/10/20189/10/2018 11:49:16 AMPPEND
WIP on road improvements and joint trench on Ash Street. Road closed to one lane. Receiving storm drain has sediment filter bag installed. No spills or leaks observed. Sweepers tracks on River Street are signs of clean up.

Follow up inspection scheduled for clean up of stockpiles and loose dirt in roadway
ESC17-01687 General Inspection9/10/20189/10/20189/10/2018 11:48:40 AMPPEND
WIP on road improvements and joint trench on Ash Street. Road closed to one lane. Receiving storm drain has sediment filter bag installed. No spills or leaks observed. Sweepers tracks on River Street are signs of clean up.

Follow up inspection scheduled. See main site development permit for ESC, ESC18-00180.