Inspections for the day of: Thursday, September 11, 2014.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00449 Tracking Control9/11/20149/11/20149/11/2014 4:38:46 PMPPART
Check to see that road has been swept towards end of the day. Hauling in dirt and using water for compaction and dust so there is trackout despite the vehicle tracking pad.

Sweeper tractor onsite but not in use. Still significant trackout. Rock entrance is not working. Going to meet with RP Herb tomorrow to figure out how to reduce trackout.
ESC14-00422 General Inspection9/11/20149/11/20149/11/2014 4:25:42 PM PASS
Project complete. ESC conditions satisfied. Disturbed area has been stabilized.
ESC14-00422 DOC - Permit Finaled9/11/20149/11/20149/11/2014 4:25:15 PMPPASS
ESC12-00130 General Inspection9/11/20149/11/20149/11/2014 3:56:22 PM PASS
River Heights is in progress. Silt fence and greenbelt barrier are in good protection, no sediment leaving site on the river side.

There is no curbing yet hard surface so the street margins have some sediment under the security fence. Will need to request sweeping next inspection.

No fugitive dust or trackout. No corrections at this time.
ESC14-00085 Aging Inspection9/11/20149/11/20149/11/2014 12:00:10 PM PASS
Monument sign and construction activity at Adams School is complete. ESC conditions satisfied.
ESC14-00085 DOC - Permit Finaled9/11/20149/11/20149/11/2014 11:58:15 AMPPASS
ESC14-00081 General Inspection9/11/20149/11/20149/11/2014 11:41:43 AM PASS
No correcctions at site. Culdesace is clean, permiter vegetative barrier has been maintained through duration of project. Trash and materials are contained. Approved.
ESC13-01046 Aging Inspection9/11/20149/11/20149/11/2014 11:30:27 AM PART
No violations specificilly at house but re-requested that drop inlets at Honeycomb and Wolf Tree be installed today. Tahoe Homes' project.
ESC14-00657 Random Inspection9/11/20149/11/20149/11/2014 11:21:22 AMAPASS
River Heights # 6 has started with clearing and preliminary grading complete. Since starting no complaints received; no dust or trackout issues observed.

Stationary water tank is located on site; permits posted.
ESC13-00070 General Inspection9/11/20149/11/20149/11/2014 11:18:46 AM PASS
Terraces condo unit in progress. No trackout to Council Springs; silt fence perimeter is intact with no breaches. No corrections.
ESC13-00071 General Inspection9/11/20149/11/20149/11/2014 11:18:31 AM PASS
Terraces condo unit in progress. No trackout to Council Springs; silt fence perimeter is intact with no breaches. No corrections.
ESC13-00072 General Inspection9/11/20149/11/20149/11/2014 11:18:14 AM PASS
Terraces condo unit in progress. No trackout to Council Springs; silt fence perimeter is intact with no breaches. No corrections.
ESC12-01066 General Inspection9/11/20149/11/20149/11/2014 11:00:53 AM PASS
951 Front project is in compliance. MS4 structures have protection, perimeter control is working, and no significant amounts of sediment in gutters around site. No trackout at time of inspection. Parking lot is not yet paved. Frame is up with work ongoing inside.
ESC14-00036 DOC - Permit Finaled9/11/20149/11/20149/11/2014 10:22:26 AMPPASS
ESC14-00036 General Inspection9/11/20149/11/20149/11/2014 10:21:26 AM PASS
BK west wing addition is complete. BLD permit finaled. ESC conditions satisfied, no further inspections required for this project, though there is other construction on BK campus. No violations observed.
ESC13-01160 Random Inspection9/11/20149/11/20149/11/2014 10:09:16 AMPPART
Demolition occuring. Not dust control at time of inspection....

WIP. No dust control or water supply at site at time of inspection. RP Matt and site superviso Rich of Beniton Construction stated water is supposed to be used to help control demolition dust. While on site he went and stopped subcontractors and requested water control.

SWPPP is on site in trailer. No other issues at time of inspection. Will continue to monitor.
ESC13-00449 Site Preparation9/10/20149/11/20149/11/2014 9:40:12 AMAPASS
Herb Phone #: ###-####-access is 2652 S Philippi

Meeting with Herb onsite conducted. No surface waters or MS4 structures in vicinity of site. Dirt is being hauled in currently to build the vehicle display berm.

There is significant trackout to Orchard that I requested be swept at minimum 1-2 x daily. Herb stated it was swept once earlier.

Main BMP will be trackout control and dust suppression. Permit posted. Approved.
ESC14-00032 Aging Inspection9/11/20149/11/20149/11/2014 8:45:07 AM PASS
Finaled.
ESC14-00032 DOC - Permit Finaled9/11/20149/11/20149/11/2014 8:44:54 AMPPASS
SFH project is complete and stabilized. ESC conditions satisfied.