Inspections for the day of: Tuesday, September 11, 2018.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00356 ESC-Conference9/11/20189/11/20189/13/2018 8:21:31 AMADONE
Stockpiles were placed as a deterrent to overnight campers frequenting the area. No material leaving site. Plans are in the making for development.
ESC17-01126 Site Preparation9/10/20189/11/20189/11/2018 11:01:55 AMAPASS
Permit posted. BMPs installed. RP ordered Site Preparation inspection.

DI bag on 15th, perimeter wattlle properly installed. WIP on placing foundation forms.

Request to have lined/leakproof concrete washout onsite or prohibit onsite washout.
ESC17-01491 General Inspection9/11/20189/11/20189/11/2018 10:46:56 AM PEND
Bridge complete. No ESC corrections directly related to project.

ESC permit to remain open for a coordinated old BMP and construction related trash pick up in Walling Creek between the new bridge and Parkcenter. Partners will be Brighton Corp, Brighton Homes, Boise ESC divisision and BPR.

Date of pickup tbd, October or November.
ESC17-00824 General Inspection9/11/20189/11/20189/11/2018 10:32:16 AM CANC
ESC17-01538 General Inspection9/11/20189/11/20189/11/2018 10:32:08 AM PEND
Stockpiling occuring on adajacent lot 400 W Parkcenter. SWO posted on that site.

Temporary path is complete. No activity. No ESC corrections.
ESC17-01688 General Inspection9/11/20189/11/20189/11/2018 10:22:00 AM PEND
road work and stockpiles in ROW. Dry weather, no discharges. Entrance to River is blocked off. DI protected.

Folllow up scheduled on main site permit to check on post construction clean up of loose dirt.
ESC18-00814 General Inspection9/11/20189/11/20189/11/2018 8:36:27 AMPFAIL
Correction requested to RP Ben:
- post ESC signs on ZEC sites on Harris Ranch Road
- confirm washout is lined or request use of HH roll off washouts
- pick up trash in between HR Road and subdivision fence and Eckert.
ESC17-00706 Aging Inspection9/11/20189/11/20189/11/2018 8:09:48 AM CANC
rescheduled for site final
ESC15-00857 General Inspection9/11/20189/11/20189/11/2018 8:09:34 AM CANC
ESC17-01317 General Inspection9/11/20189/11/20189/11/2018 8:02:49 AM PASS
Inpsected 9/10 PM. No ESC issues, home is framed and flat work poured.
ESC17-00898 Aging Inspection9/11/20189/11/20189/11/2018 8:01:51 AM CANC