ESC15-00762
| General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 4:48:29 PM | | PART |
|
|
Vertical construction in progress. No discharges or trackout to surrounding streets.
Correction request:
Increase sweeping frequency of the closed traffic lanes on 5th and Broad Street to prevent dirty runoff in case of precipitation..
|
ESC15-01161
| BMP Violation | 9/13/2016 | 9/13/2016 | 9/13/2016 4:18:31 PM | P | CANC |
|
|
|
ESC15-01172
| Aging Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 4:17:39 PM | | PASS |
|
|
|
ESC15-00817
| General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 3:03:51 PM | | PEND |
|
|
Still needs landscaping and stabilization, BLD is open. No sediment or other materials leaving site to storm water system.
|
ESC16-00406
| General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 3:02:30 PM | P | PASS |
|
|
Grading work is still occuring at Highlands Cove subdivision project. Dust control system is still installed and working well, no plumes observed. No complaints received since early August.
Sunset Peak/8th Street extension re-alignment has been complete. A new section of rip-rapped barrow ditches have been installed on both sides of road and should receive sheet flow from road and prevent water running down the pre-exisiting gully. Disturbed slopes around the new road area have been horizontally tracked and sediment control slope interupting wattles have been installed.
No corrections requested at this time, recommended to RP that an onsite inspection be conducted during first significant rain to check for any weaknesses in BMPs or discharge issues. May want to install silt fence section in the gully below the wattles on the inside of the road curve.
|
ESC16-01093
| Site Preparation | 9/13/2016 | 9/13/2016 | 9/13/2016 2:27:55 PM | P | PASS |
|
|
Permit sign posted with contact information provided. Lined concrete washout pit is onsite for cement work. Perimter sediment control wattles along edge of pavement and back slope. No discharges or spills observed. Clean site with BMPs installed, approved
|
ESC16-00989
| General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 1:54:29 PM | P | PASS |
|
|
Foundation has been excavated, no activity at time of inspection. Trackout after foundation work was swept clean. Permit sign posted, perimeter wattles installed, DI has sediment filter bag. No corrections at this time.
|
ESC15-00623
| General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 1:53:06 PM | | PASS |
|
|
Home complete and occupied. Hillsides have been vegetated. No DI bag removal required due to new projects just activated across the street and downhill from the home. HIllside bond issued for permanent vegetation and stabilization. No further ESC inspections required, conditions satisfied.
|
ESC15-00623
| DOC - Permit Finaled | 9/13/2016 | 9/13/2016 | 9/13/2016 1:51:38 PM | P | PASS |
|
|
|
ESC16-01151
| Site Preparation | 9/12/2016 | 9/13/2016 | 9/13/2016 12:33:40 PM | P | PART |
|
|
Weston Phone #: ###-####
Permit sign posted. Hunter Homes approved to use large capacity lined washout at Harris Crossing. Requested that all concrete truck drivers and contractors be made aware. Subdivision inlets are protected. Approved.
|
ESC16-01239
| Site Preparation | 9/12/2016 | 9/13/2016 | 9/13/2016 12:33:29 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
Permit sign posted. Hunter Homes approved to use large capacity lined washout at Harris Crossing. Requested that all concrete truck drivers and contractors be made aware. Subdivision inlets are protected. Approved.
|
ESC15-00556
| General Inspection | 9/12/2016 | 9/13/2016 | 9/13/2016 12:13:16 PM | A | PASS |
|
|
No active grading occuring at time of inspection. Roads have been prepped for paving and connection to permanent storm drain system. No wind blown dust observed at 12:15 PM.
No trackout, roads have been swept after recent heavy activity. No corrections at this time.
|
GRD16-00037
| GRD-Final | 9/12/2016 | 9/13/2016 | 9/13/2016 11:46:08 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark Brice
Park pathways are complete and shoulders have been stabilized with sod. No unused or waste cement/concrete materilas on site. Small stockpile of topsoil may remain on site for Park's use, no offsite runoff potential. No temp BMP removal required. ESC permit condtions satisfied.
|
ESC16-00618
| General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 11:21:13 AM | A | PASS |
|
|
WIP on SFH. No loose sediment or other materials in sidewalks and gutters surrounding project. Permit sign posted on Kipling, trash contained. No corrections needed.
|
ESC15-01161
| BMP Violation | 9/12/2016 | 9/13/2016 | 9/13/2016 11:19:17 AM | A | PEND |
|
|
|
ESC16-00324
| General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 10:23:38 AM | A | PART |
|
|
WIP on prep for parking lot paving.
Correction request: - sweep street and gutter in front of project on Allumbaugh
|
ESC16-01234
| General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 10:04:27 AM | A | PASS |
|
|
Residential demolition of accessory structure in progress. Permit sign clearly posted with contact info. No loose materials or dust leaving site. Currently in salvage phase. Approveed.
|
ESC14-00982
| General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 9:46:28 AM | | PART |
|
|
East building is partially complete with some units already occupied. West building is framed and has exterior and interior finishes remaining.
No trackout or discharges, but need to do housekeeping & maintenance: 1. Clean out dirt around MS4 on Opohonga and remove inlet bag since parking lot and landscaping is installed. 2. Empty west trash container.
Verbal correction to Biltmore RP
|
ESC15-01184
| General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 9:10:58 AM | | PASS |
|
|
Vertical work ongoing. Two construction entrances installed, DIs have inlet protection. No discharges or spills around perimeter. No windblown trash on 8th Street.
|
ESC15-00976
| General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 8:52:26 AM | | PASS |
|
|
|
ESC16-00168
| General Inspection | 9/1/2016 | 9/13/2016 | 9/12/2016 3:05:46 PM | P | PASS |
|
|
No new activity at site. Wetland vegetation still growing and irrigation water flowing through. SWPPP still posted at entrance. No trackout, fugitive dust, or materials leaving site.
|