Inspections for the day of: Tuesday, September 13, 2016.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00762 General Inspection9/13/20169/13/20169/13/2016 4:48:29 PM PART
Vertical construction in progress. No discharges or trackout to surrounding streets.

Correction request:

Increase sweeping frequency of the closed traffic lanes on 5th and Broad Street to prevent dirty runoff in case of precipitation..
ESC15-01161 BMP Violation9/13/20169/13/20169/13/2016 4:18:31 PMPCANC
ESC15-01172 Aging Inspection9/13/20169/13/20169/13/2016 4:17:39 PM PASS
ESC15-00817 General Inspection9/13/20169/13/20169/13/2016 3:03:51 PM PEND
Still needs landscaping and stabilization, BLD is open. No sediment or other materials leaving site to storm water system.
ESC16-00406 General Inspection9/13/20169/13/20169/13/2016 3:02:30 PMPPASS
Grading work is still occuring at Highlands Cove subdivision project. Dust control system is still installed and working well, no plumes observed. No complaints received since early August.

Sunset Peak/8th Street extension re-alignment has been complete. A new section of rip-rapped barrow ditches have been installed on both sides of road and should receive sheet flow from road and prevent water running down the pre-exisiting gully. Disturbed slopes around the new road area have been horizontally tracked and sediment control slope interupting wattles have been installed.

No corrections requested at this time, recommended to RP that an onsite inspection be conducted during first significant rain to check for any weaknesses in BMPs or discharge issues. May want to install silt fence section in the gully below the wattles on the inside of the road curve.
ESC16-01093 Site Preparation9/13/20169/13/20169/13/2016 2:27:55 PMPPASS
Permit sign posted with contact information provided. Lined concrete washout pit is onsite for cement work. Perimter sediment control wattles along edge of pavement and back slope. No discharges or spills observed. Clean site with BMPs installed, approved
ESC16-00989 General Inspection9/13/20169/13/20169/13/2016 1:54:29 PMPPASS
Foundation has been excavated, no activity at time of inspection. Trackout after foundation work was swept clean. Permit sign posted, perimeter wattles installed, DI has sediment filter bag. No corrections at this time.
ESC15-00623 General Inspection9/13/20169/13/20169/13/2016 1:53:06 PM PASS
Home complete and occupied. Hillsides have been vegetated. No DI bag removal required due to new projects just activated across the street and downhill from the home. HIllside bond issued for permanent vegetation and stabilization. No further ESC inspections required, conditions satisfied.
ESC15-00623 DOC - Permit Finaled9/13/20169/13/20169/13/2016 1:51:38 PMPPASS
ESC16-01151 Site Preparation9/12/20169/13/20169/13/2016 12:33:40 PMPPART
Weston Phone #: ###-####


Permit sign posted. Hunter Homes approved to use large capacity lined washout at Harris Crossing. Requested that all concrete truck drivers and contractors be made aware. Subdivision inlets are protected. Approved.
ESC16-01239 Site Preparation9/12/20169/13/20169/13/2016 12:33:29 PMPPASS
Phone #: ###-#### Inspection requested via web by Weston Wagner

Permit sign posted. Hunter Homes approved to use large capacity lined washout at Harris Crossing. Requested that all concrete truck drivers and contractors be made aware. Subdivision inlets are protected. Approved.
ESC15-00556 General Inspection9/12/20169/13/20169/13/2016 12:13:16 PMAPASS
No active grading occuring at time of inspection. Roads have been prepped for paving and connection to permanent storm drain system. No wind blown dust observed at 12:15 PM.

No trackout, roads have been swept after recent heavy activity. No corrections at this time.
GRD16-00037 GRD-Final9/12/20169/13/20169/13/2016 11:46:08 AMAPASS
Phone #: ###-#### Inspection requested via web by Mark Brice

Park pathways are complete and shoulders have been stabilized with sod. No unused or waste cement/concrete materilas on site. Small stockpile of topsoil may remain on site for Park's use, no offsite runoff potential. No temp BMP removal required. ESC permit condtions satisfied.
ESC16-00618 General Inspection9/13/20169/13/20169/13/2016 11:21:13 AMAPASS
WIP on SFH. No loose sediment or other materials in sidewalks and gutters surrounding project. Permit sign posted on Kipling, trash contained. No corrections needed.
ESC15-01161 BMP Violation9/12/20169/13/20169/13/2016 11:19:17 AMAPEND
ESC16-00324 General Inspection9/13/20169/13/20169/13/2016 10:23:38 AMAPART
WIP on prep for parking lot paving.

Correction request:
- sweep street and gutter in front of project on Allumbaugh
ESC16-01234 General Inspection9/13/20169/13/20169/13/2016 10:04:27 AMAPASS
Residential demolition of accessory structure in progress. Permit sign clearly posted with contact info. No loose materials or dust leaving site. Currently in salvage phase. Approveed.
ESC14-00982 General Inspection9/13/20169/13/20169/13/2016 9:46:28 AM PART
East building is partially complete with some units already occupied. West building is framed and has exterior and interior finishes remaining.

No trackout or discharges, but need to do housekeeping & maintenance:
1. Clean out dirt around MS4 on Opohonga and remove inlet bag since parking lot and landscaping is installed.
2. Empty west trash container.

Verbal correction to Biltmore RP
ESC15-01184 General Inspection9/13/20169/13/20169/13/2016 9:10:58 AM PASS
Vertical work ongoing. Two construction entrances installed, DIs have inlet protection. No discharges or spills around perimeter. No windblown trash on 8th Street.
ESC15-00976 General Inspection9/13/20169/13/20169/13/2016 8:52:26 AM PASS
ESC16-00168 General Inspection9/1/20169/13/20169/12/2016 3:05:46 PMPPASS
No new activity at site. Wetland vegetation still growing and irrigation water flowing through. SWPPP still posted at entrance. No trackout, fugitive dust, or materials leaving site.