Inspections for the day of: Thursday, September 13, 2018.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01022 General Inspection9/11/20189/13/20189/14/2018 3:41:15 PMAPASS
Inspection conducted 9/13 2:00 PM

No trackout, discharges, or fugitive dust leaving site. BMPs on perimeter are installed (stormdrain protection, silt fence). Construction entrance is currently closed for future utilitiy work. Minimal access allowed until heavy duty rock entrance can be re-installed. Crews park off the dirt up on Winter Camp.

Sediment basin and future stormwater pond has been excavated. Need to make sure the sides have been properly tracked (perpindicular to slope)

Now that stormwater pond is availalbe, next week we need to make sure any drainage from the south ridge goes to the pond rather than flowing to Eyrie Way.

No corrections for violations. Follow up next week.
ESC18-00134 General Inspection9/7/20189/13/20189/13/2018 3:35:33 PMPPASS
WIP on interior. Site not yet landscaped. No violations.
ESC17-01416 DOC - Permit Finaled9/13/20189/13/20189/13/2018 3:27:15 PMPPASS
ESC17-00836 General Inspection9/13/20189/13/20189/13/2018 3:12:45 PM CANC
ESC17-01704 General Inspection9/13/20189/13/20189/13/2018 3:07:44 PM PASS
All carports installed at Kensington. No ESC corrections, permit conditions satisfied; permit finaled.
ESC17-01704 DOC - Permit Finaled9/13/20189/13/20189/13/2018 3:06:59 PMPPASS
ESC17-01309 Site Final9/13/20189/13/20189/13/2018 2:58:56 PMPPASS
Home complete, landscaped, and cleaned. Temporary BMPs to remain installed for active construction in Belmar #2
ESC17-01310 Site Final9/13/20189/13/20189/13/2018 2:58:17 PMPPASS
Home complete, landscaped, and cleaned. Temporary BMPs to remain installed for active construction in Belmar #2
ESC17-01375 Site Final9/13/20189/13/20189/13/2018 2:57:41 PMPPASS
Home complete, landscaped, and cleaned. Temporary BMPs to remain installed for active construction in Belmar #2
ESC17-01311 Site Final9/13/20189/13/20189/13/2018 2:57:25 PMPPASS
Home complete, landscaped, and cleaned. Temporary BMPs to remain installed for active construction in Belmar #2
ESC17-01271 Site Final9/13/20189/13/20189/13/2018 2:56:38 PMPPASS
Home complete, landscaped, and cleaned. Temporary BMPs to remain installed for active construction in Belmar #2
ESC17-01273 Aging Inspection9/13/20189/13/20189/13/2018 2:55:50 PM PASS
Home complete, landscaped, and cleaned. Temporary BMPs to remain installed for active construction in Belmar #2
ESC17-01273 DOC - Permit Finaled9/13/20189/13/20189/13/2018 2:53:30 PMPPASS
ESC17-00706 Site Final9/11/20189/13/20189/13/2018 2:45:46 PMAPASS
Home complete. NO temp BMPs left onsite or in strom drain. ESC permit conditions satisfied.
ESC17-01147 Aging Inspection9/13/20189/13/20189/13/2018 2:40:10 PM PASS
WIP. Project almost complete. Need to pave driveway and clean the street in front of the home when done. No discahrges or trackout.
ESC15-00857 General Inspection9/11/20189/13/20189/13/2018 2:31:39 PMAPASS
ESC17-01411 DOC - Permit Finaled9/13/20189/13/20189/13/2018 2:29:40 PMPPASS