ESC18-01022
| General Inspection | 9/11/2018 | 9/13/2018 | 9/14/2018 3:41:15 PM | A | PASS |
|
|
Inspection conducted 9/13 2:00 PM
No trackout, discharges, or fugitive dust leaving site. BMPs on perimeter are installed (stormdrain protection, silt fence). Construction entrance is currently closed for future utilitiy work. Minimal access allowed until heavy duty rock entrance can be re-installed. Crews park off the dirt up on Winter Camp.
Sediment basin and future stormwater pond has been excavated. Need to make sure the sides have been properly tracked (perpindicular to slope)
Now that stormwater pond is availalbe, next week we need to make sure any drainage from the south ridge goes to the pond rather than flowing to Eyrie Way.
No corrections for violations. Follow up next week.
|
ESC18-00134
| General Inspection | 9/7/2018 | 9/13/2018 | 9/13/2018 3:35:33 PM | P | PASS |
|
|
WIP on interior. Site not yet landscaped. No violations.
|
ESC17-01416
| DOC - Permit Finaled | 9/13/2018 | 9/13/2018 | 9/13/2018 3:27:15 PM | P | PASS |
|
|
|
ESC17-00836
| General Inspection | 9/13/2018 | 9/13/2018 | 9/13/2018 3:12:45 PM | | CANC |
|
|
|
ESC17-01704
| General Inspection | 9/13/2018 | 9/13/2018 | 9/13/2018 3:07:44 PM | | PASS |
|
|
All carports installed at Kensington. No ESC corrections, permit conditions satisfied; permit finaled.
|
ESC17-01704
| DOC - Permit Finaled | 9/13/2018 | 9/13/2018 | 9/13/2018 3:06:59 PM | P | PASS |
|
|
|
ESC17-01309
| Site Final | 9/13/2018 | 9/13/2018 | 9/13/2018 2:58:56 PM | P | PASS |
|
|
Home complete, landscaped, and cleaned. Temporary BMPs to remain installed for active construction in Belmar #2
|
ESC17-01310
| Site Final | 9/13/2018 | 9/13/2018 | 9/13/2018 2:58:17 PM | P | PASS |
|
|
Home complete, landscaped, and cleaned. Temporary BMPs to remain installed for active construction in Belmar #2
|
ESC17-01375
| Site Final | 9/13/2018 | 9/13/2018 | 9/13/2018 2:57:41 PM | P | PASS |
|
|
Home complete, landscaped, and cleaned. Temporary BMPs to remain installed for active construction in Belmar #2
|
ESC17-01311
| Site Final | 9/13/2018 | 9/13/2018 | 9/13/2018 2:57:25 PM | P | PASS |
|
|
Home complete, landscaped, and cleaned. Temporary BMPs to remain installed for active construction in Belmar #2
|
ESC17-01271
| Site Final | 9/13/2018 | 9/13/2018 | 9/13/2018 2:56:38 PM | P | PASS |
|
|
Home complete, landscaped, and cleaned. Temporary BMPs to remain installed for active construction in Belmar #2
|
ESC17-01273
| Aging Inspection | 9/13/2018 | 9/13/2018 | 9/13/2018 2:55:50 PM | | PASS |
|
|
Home complete, landscaped, and cleaned. Temporary BMPs to remain installed for active construction in Belmar #2
|
ESC17-01273
| DOC - Permit Finaled | 9/13/2018 | 9/13/2018 | 9/13/2018 2:53:30 PM | P | PASS |
|
|
|
ESC17-00706
| Site Final | 9/11/2018 | 9/13/2018 | 9/13/2018 2:45:46 PM | A | PASS |
|
|
Home complete. NO temp BMPs left onsite or in strom drain. ESC permit conditions satisfied.
|
ESC17-01147
| Aging Inspection | 9/13/2018 | 9/13/2018 | 9/13/2018 2:40:10 PM | | PASS |
|
|
WIP. Project almost complete. Need to pave driveway and clean the street in front of the home when done. No discahrges or trackout.
|
ESC15-00857
| General Inspection | 9/11/2018 | 9/13/2018 | 9/13/2018 2:31:39 PM | A | PASS |
|
|
|
ESC17-01411
| DOC - Permit Finaled | 9/13/2018 | 9/13/2018 | 9/13/2018 2:29:40 PM | P | PASS |
|
|
|