Inspections for the day of: Friday, September 14, 2018.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00907 BMP Violation9/13/20189/14/20189/19/2018 7:55:55 AMAPEND
no construction entrance, dusty
ESC16-00935 General Inspection9/14/20189/14/20189/19/2018 7:55:17 AM CANC
ESC16-00936 General Inspection9/14/20189/14/20189/19/2018 7:55:05 AM CANC
ESC16-00489 General Inspection9/14/20189/14/20189/17/2018 1:42:23 PM CANC
ESC18-01121 Site Preparation9/14/20189/14/20189/14/2018 4:02:44 PMAPASS
10 AM Walk through inspection with project superintendant Lance.

BMPs are installed and approved for construction:

- heavy duty construction entrances at Stilson Street and through ESP.
- silt fence (SF) installations at brige crossings per SWPPP.
- sediment control wattle installed to contain & treat runoff from staging area. RP to monitor and replace with SF
if necessary- staging area has good pollution prevention measures in place including covered material storage, secondary containment areas, gravel parking and access to trailer, and spill kits.
- water truck on site for dust control.
- SWPPP/ESC plan on site for inspector review.



Tasks & recommended improvements for site:

- Post official SWPPP signage at designated main entrance to satisfy CGP 2017 requirements. Inlclude City of Boise ESC sign.
- Provide covered dumpster. Investigate possibility of a recycling bin for cardboard boxes and other recyclables. Enery bags for large plastic wrappings?
- report any significant changes or operations at site , including dewatering start ups to Boise ESC Inspectors Long & Zawacki.
ESC16-00406 General Inspection9/14/20189/14/20189/14/2018 1:00:33 PM CANC
ESC17-01285 Aging Inspection9/14/20189/14/20189/14/2018 12:59:58 PM PASS
ESC15-01579 General Inspection9/14/20189/14/20189/14/2018 12:59:41 PM CANC