Inspections for the day of: Friday, September 16, 2016.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01543 General Inspection9/16/20169/16/20169/19/2016 12:22:33 PM PASS
ESC13-00524 General Inspection9/15/20169/16/20169/19/2016 12:18:03 PMAPASS
Slopes are in good condition and appear to be stable. Two SFHs with seperate ESC permits are in progress. BMPs installed. Will close this permit when application/permit for phase across Bogus Basin Road is issued.
ESC15-00853 General Inspection9/15/20169/16/20169/16/2016 4:19:14 PMACANC
rescheduled 9/18
ESC14-00787 General Inspection9/16/20169/16/20169/16/2016 4:18:42 PM PASS
ESC15-01138 General Inspection9/16/20169/16/20169/16/2016 1:46:45 PM PASS
ESC16-00380 Aging Inspection9/16/20169/16/20169/16/2016 11:28:40 AM CANC
ESC15-01483 General Inspection9/16/20169/16/20169/16/2016 11:28:26 AM PASS
Frame is complete. WIP on interior and exterior finishes. No trackout from either entrance. Site surround by screened fence. All DIs on Bannock @ 10th and 11th have sediment filter bags. Approved.
ESC16-00133 General Inspection9/16/20169/16/20169/16/2016 11:21:46 AM CANC
ESC16-00362 Aging Inspection9/16/20169/16/20169/16/2016 11:00:36 AM PASS
UST has been removed from site. Building still on site and BLD open. No activity. No materials leaving site.
ESC16-00215 General Inspection9/16/20169/16/20169/16/2016 10:58:55 AM PASS
Park landscaping and irrigation line work in progress. Some localized dust, but no continuous plumes. No trackout or discharges occuring.
ESC15-01420 General Inspection9/16/20169/16/20169/16/2016 10:45:37 AM PASS
Subdivison work complete and first SFH is in progress. NOI and ESC permit sign posted. Site is clean, vegetated buffer between lots Hill Road. Active site has trash container. Temporary water system installed to we stockpile berm on site. No corrections requested at this time.
ESC15-01060 General Inspection9/16/20169/16/20169/16/2016 10:32:36 AM PASS
Home is complete and occupied. Not all slopes have vegetated. Drainaige channel lined with check dams. Will continue to monitor for performance during upcoming rain events in the Fall.
ESC16-00337 Aging Inspection9/16/20169/16/20169/16/2016 10:02:34 AM PASS
ESC16-00337 DOC - Permit Finaled9/16/20169/16/20169/16/2016 10:02:28 AMPPASS
ESC14-00982 General Inspection9/13/20169/16/20169/16/2016 10:01:45 AMAPASS
Follow up inspection on DI clean up and inlet bag removal

Gutter was swept. Leaves and dirt around drop inlet were cleaned and the temp. BMP DI bag has been removed as requested. East building exterior and landscaping is complete. ESC permit conditions satisfied. Remaining work covered under ESC14-00983
ESC14-00982 DOC - Permit Finaled9/16/20169/16/20169/16/2016 10:01:26 AMPPASS
ESC16-00324 Tracking Control9/13/20169/16/20169/16/2016 9:55:40 AMAPASS
RP ordered street sweep as requested. Loose dirt in gutter has been removed. No new activity, no discharges or trackout. Approved.
ESC14-00588 Site Preparation9/15/20169/16/20169/16/2016 9:21:07 AMACANC
data entry error, disregard
ESC15-00468 General Inspection9/16/20169/16/20169/16/2016 9:20:40 AM CANC
ESC15-01619 Aging Inspection9/16/20169/16/20169/16/2016 9:02:45 AM PASS
TI within newly constructed building is complete. All permit finaled. ESC conditions satisfied.
ESC15-01619 DOC - Permit Finaled9/16/20169/16/20169/16/2016 9:02:13 AMPPASS
ESC16-00363 Aging Inspection9/16/20169/16/20169/16/2016 8:37:13 AM PEND
Need to stabilize patches of parking lot removed for UST removal in order to final permit.