Inspections for the day of: Tuesday, September 17, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01043 Site Final8/30/20199/17/20199/17/2019 4:56:57 PMPCANC
rescheduled
ESC18-00878 Aging Inspection9/17/20199/17/20199/17/2019 4:56:09 PM CANC
ESC17-01686 Site Final8/23/20199/17/20199/17/2019 4:53:34 PMPNR
Request final cleanup and DI bag removal on Gatewood
ESC19-00114 General Inspection9/17/20199/17/20199/17/2019 4:50:12 PMPPASS
ESC18-00172 Aging Inspection9/17/20199/17/20199/17/2019 4:09:45 PM CANC
ESC18-01333 General Inspection9/17/20199/17/20199/17/2019 4:09:11 PMPPASS
Driveway poured, site landscaped. HOme for sale. No corrections. Ready for site final next inspection
ESC18-01687 General Inspection9/17/20199/17/20199/17/2019 4:07:22 PMPPASS
WIP on benches and shade structures within the bike park bowl. No trackout. Project surrounded by Mtn. Cove road project and dog park.

Working with PW and Parks to have compost material delivered to create biodegradable compost berms. Reviewed strategy and application technique with RP Morgan.

No corrections.
ESC17-00847 General Inspection9/17/20199/17/20199/17/2019 2:56:04 PMPPASS
WIP on painting and interior finishing. Parking lot installed, storm water pond excavated. Some landscaping still in progress. Storm drains around site have sediment protection installed. No corrections requested.
ESC18-00176 Aging Inspection9/17/20199/17/20199/17/2019 12:49:22 PM PASS
No trackout, no activity at site. BMPs installed, permit sign posted
ESC19-00324 General Inspection9/17/20199/17/20199/17/2019 12:23:22 PMPPASS
BMPs installed. Earthwork/re-grading and pipe work is in progress. No slope erosion or offsite sediment runoff observed. No significant trackout. No corrections at this time.
ESC17-01473 General Inspection9/17/20199/17/20199/17/2019 11:55:16 AM CANC
ESC18-01289 Tracking Control9/17/20199/17/20199/17/2019 11:53:43 AMPFAIL
Construction entrance not maintained, trackount on Summersweet leading Federal Way. Concrete cutting slurry not properly contained within work area. High pH water flowing toward storm drain.

Lot of windblown trash east of site.

Corrections required:
- maintain/re-install construction entrance
- install sandbag/gutter barriers to contain and suck up concrete cutting slurry.
- pick up windblown trash east of site
ESC16-00242 Site Final9/16/20199/17/20199/17/2019 11:20:57 AMAPASS
Dillon Phone #: ###-####

Fab 51 scope of work complete per Stock Construction. Will continue to work with Micron Environmental Division on the remaining active project and construction staging/pollution prevention areas.
ESC18-00983 General Inspection9/17/20199/17/20199/17/2019 11:09:49 AMPFAIL
post rainfall inspection

No sediment runoff from disturbed areas observed. Site stormwater system is built, slope is very well vegetatated, no new erosion observed.

Fence installation crew had cement truck washout onto ground next stockpile. Final concrete washout warning at this site. Must be cleaned up before end of week.

Corrections needed:
- check that all storm drains have properly installed sediment protection
- fix berm and drainage swale at top of slope corner to direct upland water away from the existing rills from last season.

Notified RP Steve.
ESC18-01772 Random Inspection9/17/20199/17/20199/17/2019 10:33:38 AMPPASS
No trackout or discharges. WIP on interior
ESC17-00190 General Inspection9/17/20199/17/20199/17/2019 8:27:59 AMPCANC
ESC19-00198 DOC - Permit Finaled9/17/20199/17/20199/17/2019 8:18:01 AMPPASS
see ESC19-00611