ESC15-01217
| Site Preparation | 9/18/2015 | 9/18/2015 | 9/18/2015 4:30:19 PM | P | PASS |
|
|
Staging area is prepped and the work area on the roadway has a downslope sediment barrier in the form of a trenched and staked wattle. Permit sign and ESC plan binder are located on site. Rock has been installed for an entrance to the staging area to reduce trackout.
Roadway and shoulders will need to be swept upon completion to remove loose sediment from the work.
Wattle should be removed and area where trenched compacted at the end of the project, unless otherwise discussed at that time. Approved for construction.
|
ESC15-00729
| General Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 4:04:26 PM | P | PASS |
|
|
Harris Ranch North - WIP on grading upper portions. No rill or gully erosion observed from below or at main access road down to entrance and staging area. No trackout from staging area, permit signs and CGP tracking # posted. Silt fence at bottom of site is trenched in.
No corrections at this time.
|
ESC15-00023
| General Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 3:06:01 PM | | PASS |
|
|
WIP on home. No activity at time of inspection. Perimeter wattle has remained installed and effectively contained sediment on site during rain event. Storm drain has DI bag installed with lots of capacity. Trash has been managed. No corrections.
|
ESC15-00408
| Aging Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 2:35:18 PM | | PASS |
|
|
Work on addition complete. Strip of grassy area next to road is revegetating. Permit sign posted on fence. BLD still open. No violations.
|
ESC15-00118
| General Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 2:24:29 PM | | PART |
|
|
WIP. Home structure is up, driveway not paved so large muddy puddle at entrance. No activity at site and no trackout.
Correction: - empty full trash container to prevent mixing with stormwater management and wind blowing light materials off site.
-
|
ESC15-00789
| Random Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 2:16:16 PM | P | PASS |
|
|
No activity at the Afton site. Site infiltrated water well during the week's rains. No sediment runoff or issues. Demo materials have been removed. Plans for vertical construction is still under review.
|
ESC15-00035
| General Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 11:58:47 AM | | PASS |
|
|
stabilization/revegetation phase. Temp BMPs installed. No corrections for Parkcenter @ Warm Springs site.
|
ESC15-00035
| DOC - Permit Finaled | 9/18/2015 | 9/18/2015 | 9/18/2015 11:58:07 AM | P | PASS |
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
ESC14-01083
| Random Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 11:51:37 AM | P | PASS |
|
|
WIP on Barber Station/Park Place townhomes. Site chain link fence is in place, no wind blown trash debris observed. Workers parking on paved surfaces, no trackout. No corrections at this time.
|
ESC15-01114
| Site Preparation | 9/18/2015 | 9/18/2015 | 9/18/2015 11:37:18 AM | A | PASS |
|
|
Inspection requested via web by Erby Gonzales
Approved for construction. Permit sign posted. Mill District Square in good condition. No outstanding corrections for Brighton Homes currently.
|
ESC15-00346
| Aging Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 11:28:34 AM | | PASS |
|
|
Home complete and landscaped and currently for sale. BMP will remain, two active projects on both sides of home. All permits finaled. Area will continued to be monitored due to other projets.
|
ESC15-00346
| DOC - Permit Finaled | 9/18/2015 | 9/18/2015 | 9/18/2015 11:27:25 AM | P | PASS |
|
|
|
ESC15-00297
| Aging Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 11:03:56 AM | | PART |
|
|
WIP. Lots building activity on Skybar, foundations, and landscaping. Will request that Tahoe homes sweep streets and check all washout, many are near capacity. Some have stormwater inside but are contained with no runoff or spill overs observed.
|
ESC14-00989
| General Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 8:49:59 AM | | PASS |
|
|
WIP on foundation. Site utilities and grading complete. Perimeter wattles and structural foundations make sediment barrier. No activity this week.
|
ESC15-00361
| Aging Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 8:48:23 AM | | PASS |
|
|
|