Inspections for the day of: Tuesday, September 18, 2018.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00741 General Inspection9/18/20189/18/20189/21/2018 3:54:18 PM CANC
ESC17-01739 General Inspection9/18/20189/18/20189/21/2018 12:36:53 PM CANC
ESC17-01387 General Inspection9/18/20189/18/20189/18/2018 3:44:25 PM PASS
ESC18-01022 BMP Violation9/17/20189/18/20189/18/2018 3:40:37 PMAPEND
corrections still in progress.

Stockpile/pushed up dirt at top of the hill where grasses and mud were washed down hill has been removed. Fence section that captured mud has been cleaned off. Will potentially need further cleanup and fastening to the ground . Debris captured should not be left in a pile but spread up and down the disturbed slope and prepped to receive hydroseeding.

Heavy duty wattles have been installed, but need to be staked in. Slope will have erosion control blankets installed this week or next.