PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, September 19, 2017
.
Number of inspections:
29
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-01210
Conference
9/19/2017
9/19/2017
9/22/2017 3:32:08 PM
A
CANC
Call about dirt in the road
ESC16-01342
Aging Inspection
9/19/2017
9/19/2017
9/22/2017 3:25:13 PM
CANC
ESC16-01472
General Inspection
8/31/2017
9/19/2017
9/22/2017 3:18:35 PM
P
CANC
ESC16-00935
General Inspection
9/19/2017
9/19/2017
9/22/2017 3:18:16 PM
CANC
ESC16-00353
General Inspection
9/19/2017
9/19/2017
9/22/2017 2:12:33 PM
P
CANC
ESC17-00954
General Inspection
9/19/2017
9/19/2017
9/22/2017 10:37:01 AM
P
PEND
Inspection on 9/19 , no significant work occuring. Crew building retaining wall at top of Hollow not onsite. Need to have onsite conference with RP about improved construction entrance, more silt fence at bottom of site, and temporary stormwater retention and settling basins onsite.
ESC17-00842
General Inspection
9/19/2017
9/19/2017
9/21/2017 12:09:31 PM
P
PEND
Currently there is a large open utility trench at entrance to site. Once work in this area is complete and construction entrance must be installed with 2-3 angular rock.
Syman Co. and RP Steve have been inspecting site. The slope drain is now installed and verbal request to make sure the inlet to the drain does not get under cut by water in the catchment area..
Will install wattle & diversion trench on west side of entrance and dig down to increase sediment retention pond volume.
ESC16-00288
General Inspection
9/19/2017
9/19/2017
9/19/2017 12:11:19 PM
CANC
ESC17-00190
General Inspection
9/19/2017
9/19/2017
9/19/2017 12:10:49 PM
P
PEND
No sediment runoff from site. Street drainage is now installed - work still remaining on retention pond.
Called RP to schedule walk through conference to plan for Fall precipitation; hydroseeding, and slope stabilization.
ESC15-01210
General Inspection
9/19/2017
9/19/2017
9/19/2017 12:06:32 PM
P
PASS
ESC17-00842
Site Preparation
9/19/2017
9/19/2017
9/19/2017 11:59:20 AM
P
CANC
ESC16-01108
General Inspection
9/19/2017
9/19/2017
9/19/2017 11:50:43 AM
CANC
ESC16-01427
Aging Inspection
9/19/2017
9/19/2017
9/19/2017 11:50:39 AM
CANC
ESC13-00193
General Inspection
9/19/2017
9/19/2017
9/19/2017 11:50:33 AM
CANC
ESC16-01236
DOC - Permit Finaled
9/19/2017
9/19/2017
9/19/2017 11:49:56 AM
P
PASS
ESC16-01328
Aging Inspection
9/19/2017
9/19/2017
9/19/2017 11:49:38 AM
CANC
ESC16-01581
General Inspection
9/19/2017
9/19/2017
9/19/2017 11:49:31 AM
CANC
ESC16-01189
General Inspection
9/19/2017
9/19/2017
9/19/2017 11:49:24 AM
CANC
ESC16-00767
Aging Inspection
9/19/2017
9/19/2017
9/19/2017 11:49:06 AM
CANC
ESC16-00708
Aging Inspection
9/19/2017
9/19/2017
9/19/2017 11:48:58 AM
CANC
ESC15-01420
General Inspection
9/19/2017
9/19/2017
9/19/2017 11:48:53 AM
CANC
ESC16-01076
General Inspection
9/19/2017
9/19/2017
9/19/2017 11:48:48 AM
CANC
ESC16-01561
General Inspection
9/19/2017
9/19/2017
9/19/2017 11:47:51 AM
CANC
ESC16-01578
DOC - Permit Finaled
9/19/2017
9/19/2017
9/19/2017 11:34:00 AM
P
PASS
ESC16-01209
DOC - Permit Finaled
9/19/2017
9/19/2017
9/19/2017 8:00:59 AM
P
PASS
ESC16-01210
DOC - Permit Finaled
9/19/2017
9/19/2017
9/19/2017 8:00:39 AM
P
PASS
ESC16-01173
DOC - Permit Finaled
9/19/2017
9/19/2017
9/19/2017 8:00:25 AM
P
PASS
ESC16-01174
DOC - Permit Finaled
9/19/2017
9/19/2017
9/19/2017 7:58:35 AM
P
PASS
ESC16-00406
Conference
9/7/2017
9/19/2017
9/18/2017 10:37:59 AM
A
DONE
9:30 site meeting and walk through with RP and developer.