Inspections for the day of: Tuesday, September 20, 2016.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00928 Aging Inspection9/20/20169/20/20169/21/2016 2:30:18 PM PART
Need to sweep up dirt & dust material within fenced area that encloses gutter on 10th street.

MS4 filter bag that recieves runoff from site is installed and in good condition.
ESC16-00288 General Inspection9/20/20169/20/20169/21/2016 1:24:08 PM PASS
WIP on foundation work. BMPs installed (perimeter wattles, permit sign, washout) Road has been swept. No corrections at this time.
ESC13-01279 General Inspection9/20/20169/20/20169/21/2016 12:23:48 PM PASS
WIP on units within central subdivision area. Framing work only. No trackout, fugitive dust or windblown trash issues. The south end of project not yet landscaped or vegetated had temporary fiber tacifier applied and silt fence installed at the bottom of the slightly sloping area.

Concrete washout is in good condtion but is near capacity. Currently being utilized for Hunter Homes SFHs in Dallas Harris Estates.

Correction request to Wes with HH to dig new washout facility.
ESC16-00269 General Inspection9/20/20169/20/20169/21/2016 8:02:19 AM CANC
ESC16-00948 Site Preparation9/19/20169/20/20169/20/2016 4:31:16 PMPPART
Site started without picking up GRD or ESC permit. Requested they pick up and pay for permit yesterday 9/19, which was completed.

No trackout, discharges or dust violations. RP unable to be reached for site walk through and review of ESC plan. Inspection re-scheduled for tomorrow.
ESC04-00952 DOC - Permit Finaled9/20/20169/20/20169/20/2016 4:15:08 PMPPASS
expired permit in system. no inspection
ESC04-00099 DOC - Permit Finaled9/20/20169/20/20169/20/2016 4:14:08 PMPPASS
old expired permit. no inspection
ESC16-00242 General Inspection9/20/20169/20/20169/20/2016 4:09:58 PM CANC
rescheduled for 9/23
ESC16-00430 General Inspection9/20/20169/20/20169/20/2016 4:09:34 PMPPASS
WIP. MS4 inlets have sediment protection. No trackout, fugitive dust, or discharges observed. Permit sign is posted.
ESC16-01108 BMP Violation9/20/20169/20/20169/20/2016 3:49:20 PMPPART
No water truck on site and excessive dust plumes leaving site boundaries.

Verbal correction request to onsite foreman Jake with Granite Construction to halt work until water truck is onsite.

Work stopped, I provided new permit sign and waited for 15 minutes until water truck arrived.

Jake stated water truck will be onsite at least once per every 2 hours to hit the haul road between stockpile of drain rock and seepage trench.
ESC16-01088 Site Preparation9/20/20169/20/20169/20/2016 3:10:11 PMPPASS
Dante Phone #: ###-####

Construction entrance installed, wind screen fence installed along Fairview frontage. Water truck is onsite for periodic waterings. Permit sign is filled out with SWPPP info & contacts and shall be posted at entrance.

Approved for construction. Note: no MS4 inlet bags installed for this project
ESC16-00879 General Inspection9/19/20169/20/20169/20/2016 2:29:31 PMPPASS
Follow up inspection to dust complaint. Water truck is on site to spray down stockpiles as they are used for backfill and compaction activities. 1 water truck on site with designated driver. No trackout, no complaints regarding dust this week. warning issued to RP, RP notified subcontractor to manage dust control as a priority.

No dust plumes leaving site boundaries at time of inspection
ESC15-00893 General Inspection9/20/20169/20/20169/20/2016 1:25:01 PM CANC
rescheduled for site final
ESC16-00163 General Inspection9/20/20169/20/20169/20/2016 12:51:18 PM PASS
Staging area still in use for Fivemile widening project. Road area and storm drain inlets have not yet been installed around the staging. Large Compliance Solutions washout container is provided. No corrections
ESC16-00276 General Inspection9/20/20169/20/20169/20/2016 12:22:06 PM PASS
Road and gutter installed. Entrance to subdivision off Wildwood has been landscaped and hydroseeded. Streets are clean. No SFH activity yet. New storm drain within subdivsion are fitted with filter mats on Silversage and Tahiti Street. No corrections needed at this time.
ESC15-00547 BMP Violation9/20/20169/20/20169/20/2016 12:13:24 PMPFAIL
Numerous violations and potential pollutants uncontained on site:

- no washout containment, piles and spills poured around in various areas and leaking into private storm drains installed for the site.
- litter, construction debris, sawdust, concrete, wall board dust all over parking lot and impermeable surfaces.
- dirt and sediment throughout parking lot. Ready to transport to MS4 on Ustick with no inlet bag
- stockpile stored on site has no perimeter controls and should be removed from site if it is not for use

Corrective actions needed ASAP

- clean up all litter and loose materials
- provide designated concrete washout that is lined and won't spill
- sweep up entrance way so that rain won;t carry dirt to Ustick
- remove all illicit concrete piles around site.
- sweep parking lot
- install sediment filter BMPs west of site on Ustick and on do service on all private inlets. Some are not even protected.

Re-inspection scheduled for Thursday AM
ESC14-00544 General Inspection9/20/20169/20/20169/20/2016 10:58:59 AM PASS
Staging area still in use. No discharges, trackout or other issues. Flat dirt area surround by screened fence.
ESC15-01193 Aging Inspection9/20/20169/20/20169/20/2016 9:27:33 AM PASS
ESC14-00338 General Inspection9/20/20169/20/20169/20/2016 8:41:43 AM CANC
No activity for this project yet
ESC15-00858 Aging Inspection9/20/20169/20/20169/20/2016 8:41:00 AM PEND
Need to remove DI bag on corner of Locust and Franklin. TBL building said it would be done by Monday 9/26
ESC15-01056 Aging Inspection9/20/20169/20/20169/20/2016 8:38:41 AM PASS
WIP. No violations. Subdivision BMPs for DHE are installed. Permit sign posted.
ESC15-01002 Aging Inspection9/20/20169/20/20169/20/2016 8:05:11 AM PASS
ESC15-01002 DOC - Permit Finaled9/20/20169/20/20169/20/2016 8:04:49 AMPPASS
ESC16-00948 General Inspection9/19/20169/20/20169/19/2016 3:53:07 PMPCANC
data entry error