Inspections for the day of: Friday, September 20, 2019.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00429 Site Final9/18/20199/20/20199/26/2019 3:22:10 PMPNR
Need to remove DI bags installed on roundabout
ESC16-01167 Site Final9/18/20199/20/20199/23/2019 2:47:38 PMPNR
check for DI bag removal on Jefferson and Avenue C

No DI bag removal completed as requested
ESC18-01248 Site Preparation9/20/20199/20/20199/23/2019 11:21:31 AMPCANC
ESC18-00928 General Inspection9/20/20199/20/20199/23/2019 10:19:13 AM CANC
ESC18-00853 General Inspection9/20/20199/20/20199/23/2019 8:18:54 AM CANC
ESC18-00754 General Inspection9/20/20199/20/20199/23/2019 8:09:11 AM PASS
No recent activity
ESC19-00371 Conference9/20/20199/20/20199/20/2019 4:37:49 PMPDONE
Conference with site stormwater team to discuss corrections and upcoming plans at site:

- Construction entrance at Trent Point has been lengthened and widened. Street has been swept at entrance.
- Storm drain inlet on Ridgepoint will not have any sediment protection installed due to previous overflows and erosion of sediment into the stormwater pond whch outfalls to the Mesa drainage channel that sends water to the Boise River.
- The existing pond will be hydroseeded this month, the flow of stormwater passess over rip rap rock, and this rock channel with have wattle installed to keep sediment from the sides of the pond from getting into the rock.
- Work will begin next week or the following to install a bypass pipe that will take stormwater from the exisitng subdivsion in the pond and divert it around the area that is to be disturbed for creation of new ponds for the new subdivsion.
- Syman Co. has been working on maintaining all wattles and silt fences installed onsite, including repairing damaged silt below Vortex Drive
- Hydroseeding for temporary and permanent stabilization will occur in October.
- Roads will not get paved till next year, the road surface will be road mix to keep mud down and the roads will have stormwater controls installed to control direction of flow and velocity.
- new construciton entrance to be installed at Ridgepoint by the pond for the upcoming activity in this area.

Will continue to monitor and inspect weekly.
ESC18-00427 General Inspection9/20/20199/20/20199/20/2019 11:44:19 AM CANC
ESC18-00979 General Inspection9/20/20199/20/20199/20/2019 8:54:25 AM CANC
ESC18-00845 Site Final9/19/20199/20/20199/20/2019 8:15:36 AMACANC
ESC18-01273 General Inspection9/20/20199/20/20199/20/2019 8:15:16 AM CANC