ESC16-01275
| Site Preparation | 9/21/2016 | 9/21/2016 | 9/21/2016 5:06:55 PM | P | PASS |
|
|
Permit sign posted. Sediment control wattle installed to prevent loose dirt from running downhiill. Approved for construction
|
ESC16-00455
| General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 3:46:06 PM | P | PASS |
|
|
WIP. New Crane Creek canal cover has been installed. No trackout or discharges. Surface of water no longer exposed. Permit sign posted on fence. Lined concrete washout was utilized. Site is in compliance.
|
ESC16-00353
| General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 3:44:43 PM | | CANC |
|
|
rescheduled for 9/22
|
ESC15-01629
| General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 3:44:16 PM | | CANC |
|
|
|
ESC16-00948
| General Inspection | 9/20/2016 | 9/21/2016 | 9/21/2016 3:36:03 PM | A | PART |
|
|
Permit sign is posted. No significant trackout, dust, or discharges. Sediment filter bag installed on storm drain on 28th
Corrections needed:
- sweep up gutter at both entrances - sweep sidewalks - designated a construction entrance
|
ESC16-00369
| Aging Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 3:23:38 PM | | PASS |
|
|
Exterior construction complete and disturbed area stabilized. No loose dirt or materials in alley. ESC permit conditions satisfied. BLD Final pending
|
ESC16-00369
| DOC - Permit Finaled | 9/21/2016 | 9/21/2016 | 9/21/2016 3:22:50 PM | P | PASS |
|
|
|
ESC15-00094
| General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 2:16:12 PM | P | PASS |
|
|
New coir mat sediment filters installed on inlets at Birdsong and Windsong. Windsong was recently swept. SFH activity occuring at top of hill as well as BH#6.No hillside erosion issues observed.
|
ESC15-00893
| Site Final | 9/20/2016 | 9/21/2016 | 9/21/2016 1:50:37 PM | A | CANC |
|
|
|
ESC15-01091
| General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 1:25:16 PM | | PASS |
|
|
No recent activity. No corrections needed at site at this time.
|
ESC16-00329
| General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 1:07:52 PM | | PASS |
|
|
|
ESC15-01288
| General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 1:00:11 PM | | PASS |
|
|
Subdivision road and infrastructure work in progress. No trackout to Warm Springs, water truck(s) on site for dust control as needed, permit sign and SWPPP info posted. No violations observed.
|
ESC16-00117
| Aging Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 12:36:05 PM | | PASS |
|
|
WIP. East Valley BMPs and Tahoe Homes projects in good condition.
|
ESC14-00989
| General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 12:30:58 PM | | PART |
|
|
No trackout or discharges, materials on site are mostly contained.
Corrections needed before end of day Friday. - sweep up all perimeter gutters and alley way - change out /conduct maintenance on sediment filter bags that were installed. - clean up concrete dust near garage unit structures
|
ESC15-00667
| Site Final | 9/7/2016 | 9/21/2016 | 9/21/2016 12:07:44 PM | P | PASS |
|
|
SF removal along both sides of road on drainage ditch.
All silt fence has now been removed. Gary w/ Central Paving called 9/19 to inform me. No further actions neeeded. Warm Spring Bypass area is stabilizeed and in use. No BMPs or loose materials left around site. Approved.
|
ESC16-01152
| Site Preparation | 9/20/2016 | 9/21/2016 | 9/21/2016 11:12:58 AM | A | PASS |
|
|
Wes Phone #: ###-####
Hunter Homes project area in DHE is in compliance. Permit signs posted, DIs protected, designated parking on hard surfaces, and approved washout in Harris Crossing.
|
ESC16-01112
| Site Final | 9/21/2016 | 9/21/2016 | 9/21/2016 10:38:10 AM | A | CANC |
|
|
data entry error
|
ESC16-01203
| Site Final | 9/21/2016 | 9/21/2016 | 9/21/2016 10:37:11 AM | A | PASS |
|
|
Work complete. Yard is landscaped/stabilized. No futher ESC actions needed. Permit finaled.
|
ESC16-00978
| Random Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 10:35:53 AM | A | PASS |
|
|
WIP on frame. Permit sign posted. No trackout, discharges or uncontained trash . Site is in compliance.
|
ESC04-00364
| DOC - Permit Finaled | 9/21/2016 | 9/21/2016 | 9/21/2016 10:32:31 AM | P | PASS |
|
|
old expired permit in database; no inspection
|
ESC03-00944
| DOC - Permit Finaled | 9/21/2016 | 9/21/2016 | 9/21/2016 10:32:17 AM | P | PASS |
|
|
old expired permit in database; no inspection
|
ESC03-00705
| DOC - Permit Finaled | 9/21/2016 | 9/21/2016 | 9/21/2016 10:32:06 AM | P | PASS |
|
|
old expired permit in database; no inspection
|
ESC16-01101
| Site Preparation | 9/20/2016 | 9/21/2016 | 9/21/2016 10:31:04 AM | A | PART |
|
|
Michael Phone #: ###-####
ESC permit sign posted. Site is below grade of sidewalk so no perimeter control needed. Approved for construction, verbal request to RP to install MS4 inlet protection on corner of 31st and Gooding before end of this week.
|
ESC16-01112
| Site Preparation | 9/20/2016 | 9/21/2016 | 9/21/2016 10:30:40 AM | A | PART |
|
|
Michael Phone #: ###-####
ESC permit sign posted. Site is below grade of sidewalk so no perimeter control needed. Approved for construction, verbal request to RP to install MS4 inlet protection on corner of 31st and Gooding before end of this week.
|
ESC16-01072
| General Inspection | 9/19/2016 | 9/21/2016 | 9/21/2016 10:24:25 AM | P | PASS |
|
|
WIP on foundation. Outpak washout on site for concrete work. No trackout or loose dirt on sidewalk. Vegetative buffer around edges still in place. Approved.
|
ESC16-00330
| DOC - Permit Finaled | 9/21/2016 | 9/21/2016 | 9/21/2016 10:19:37 AM | P | PASS |
|
|
No disturbed area, construciton materials/BMPs, activity at site. No further ESC inspections required.
|
ESC16-00074
| DOC - Permit Finaled | 9/21/2016 | 9/21/2016 | 9/21/2016 10:11:06 AM | P | PASS |
|
|
Exterior disturbance stabilized. No temp BMPs or construction materials on or around site. ESC conditions satisfied. BLD still open.
|
ESC16-00346
| Aging Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 9:39:27 AM | | PASS |
|
|
|
ESC15-01552
| General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 9:05:33 AM | | PASS |
|
|
Final landscaping and site clean up in progress. Parking lot now paved, sidewalk median landscaped, and DI bag removed on corner. Should be ready for site final with BLD final.
|
ESC16-00349
| General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 8:41:16 AM | | PASS |
|
|
Not yet landscaped. WIP on interior/exterior finishes. No trackout or spills leaving site. Trash contained.
|
ESC13-00707
| General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 8:00:59 AM | | CANC |
|
|
|