PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, September 21, 2018
.
Number of inspections:
19
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-00946
General Inspection
9/21/2018
9/21/2018
9/24/2018 11:02:48 AM
P
CANC
ESC17-00949
Site Final
9/21/2018
9/21/2018
9/21/2018 4:25:46 PM
P
PASS
Parcel now covered with new ESC permit for new SFH. See ESC18-01191
ESC17-01445
Aging Inspection
9/21/2018
9/21/2018
9/21/2018 3:53:58 PM
CANC
rescheduled for site final
ESC18-01191
Site Preparation
9/21/2018
9/21/2018
9/21/2018 3:53:20 PM
P
FAIL
ESC General Permit, WIP on foundation, no site prep was required to start.
- Need to post new ESC sign for new project.
- Need a lined concrete washout or prohibit onsite chute rinsing.
- need to clean up spill of hydraulic oil in gutter and street on Rim next to storm drain.
ESC17-01057
General Inspection
9/21/2018
9/21/2018
9/21/2018 3:22:42 PM
CANC
ESC18-01022
General Inspection
9/19/2018
9/21/2018
9/21/2018 3:22:33 PM
A
DONE
Safety protocol for grading on hillside has been updated and a safety inspection log book created. No new corrections. Inspection scheduled for Monday.
ESC04-01062
DOC - Permit Finaled
9/21/2018
9/21/2018
9/21/2018 1:41:05 PM
P
PASS
ESC04-00127
DOC - Permit Finaled
9/21/2018
9/21/2018
9/21/2018 1:41:01 PM
P
PASS
ESC04-00924
DOC - Permit Finaled
9/21/2018
9/21/2018
9/21/2018 1:40:54 PM
P
PASS
ESC18-01266
General Inspection
9/21/2018
9/21/2018
9/21/2018 1:40:42 PM
P
PART
WIP on foundation. No trackout or discharges. Need to post ESC permit sign.
ESC18-00141
Site Preparation
9/20/2018
9/21/2018
9/21/2018 1:39:53 PM
A
CANC
cAMERON Phone #: ###-####
Rescheduled by RP for Monday
ESC17-00190
General Inspection
9/21/2018
9/21/2018
9/21/2018 12:27:00 PM
PASS
No new issues. Driveways have been fitted with water bars and wattles. Drop inlet sump full of dirt has been cleaned out. No construction of SFHs yet. No corrections at this time.
ESC16-01395
General Inspection
9/21/2018
9/21/2018
9/21/2018 12:16:43 PM
PASS
ESC18-00498
General Inspection
9/21/2018
9/21/2018
9/21/2018 12:12:08 PM
P
PEND
Hillside wattle inspection conducted with RP Clay.
Crews need to evenly space at a minimum 5 stakes per wattle section, approximately 5 ft apart. Wattles need be aligned along the contour and trenched 2-4 inches into hillside, not just laid in the perpendicular tracks.
Clayton will have discussion with installation crew and we will inspect again prior to the Fall rains.
ESC17-00455
General Inspection
9/21/2018
9/21/2018
9/21/2018 12:00:39 PM
PASS
Construction complete. No crew or material on culdesac. WIll keep open to monitor hillside revegetation/stabilization from below. No corrections.
ESC17-01597
DOC - Permit Finaled
9/21/2018
9/21/2018
9/21/2018 11:57:27 AM
P
PASS
ESC17-01281
General Inspection
9/21/2018
9/21/2018
9/21/2018 10:46:14 AM
CANC
rescheduled for site final
ESC16-00556
General Inspection
9/21/2018
9/21/2018
9/21/2018 8:20:20 AM
CANC
MIS18-00375
ESC-Conference
9/20/2018
9/21/2018
9/20/2018 2:29:19 PM
A
NH
Correction notice posted to contact ESC and PW Hillside for permits. No workers or homeowners onsite.