Inspections for the day of: Friday, September 21, 2018.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00946 General Inspection9/21/20189/21/20189/24/2018 11:02:48 AMPCANC
ESC17-00949 Site Final9/21/20189/21/20189/21/2018 4:25:46 PMPPASS
Parcel now covered with new ESC permit for new SFH. See ESC18-01191
ESC17-01445 Aging Inspection9/21/20189/21/20189/21/2018 3:53:58 PM CANC
rescheduled for site final
ESC18-01191 Site Preparation9/21/20189/21/20189/21/2018 3:53:20 PMPFAIL
ESC General Permit, WIP on foundation, no site prep was required to start.

- Need to post new ESC sign for new project.
- Need a lined concrete washout or prohibit onsite chute rinsing.
- need to clean up spill of hydraulic oil in gutter and street on Rim next to storm drain.
ESC17-01057 General Inspection9/21/20189/21/20189/21/2018 3:22:42 PM CANC
ESC18-01022 General Inspection9/19/20189/21/20189/21/2018 3:22:33 PMADONE
Safety protocol for grading on hillside has been updated and a safety inspection log book created. No new corrections. Inspection scheduled for Monday.
ESC04-01062 DOC - Permit Finaled9/21/20189/21/20189/21/2018 1:41:05 PMPPASS
ESC04-00127 DOC - Permit Finaled9/21/20189/21/20189/21/2018 1:41:01 PMPPASS
ESC04-00924 DOC - Permit Finaled9/21/20189/21/20189/21/2018 1:40:54 PMPPASS
ESC18-01266 General Inspection9/21/20189/21/20189/21/2018 1:40:42 PMPPART
WIP on foundation. No trackout or discharges. Need to post ESC permit sign.
ESC18-00141 Site Preparation9/20/20189/21/20189/21/2018 1:39:53 PMACANC
cAMERON Phone #: ###-####

Rescheduled by RP for Monday
ESC17-00190 General Inspection9/21/20189/21/20189/21/2018 12:27:00 PM PASS
No new issues. Driveways have been fitted with water bars and wattles. Drop inlet sump full of dirt has been cleaned out. No construction of SFHs yet. No corrections at this time.
ESC16-01395 General Inspection9/21/20189/21/20189/21/2018 12:16:43 PM PASS
ESC18-00498 General Inspection9/21/20189/21/20189/21/2018 12:12:08 PMPPEND
Hillside wattle inspection conducted with RP Clay.

Crews need to evenly space at a minimum 5 stakes per wattle section, approximately 5 ft apart. Wattles need be aligned along the contour and trenched 2-4 inches into hillside, not just laid in the perpendicular tracks.

Clayton will have discussion with installation crew and we will inspect again prior to the Fall rains.
ESC17-00455 General Inspection9/21/20189/21/20189/21/2018 12:00:39 PM PASS
Construction complete. No crew or material on culdesac. WIll keep open to monitor hillside revegetation/stabilization from below. No corrections.
ESC17-01597 DOC - Permit Finaled9/21/20189/21/20189/21/2018 11:57:27 AMPPASS
ESC17-01281 General Inspection9/21/20189/21/20189/21/2018 10:46:14 AM CANC
rescheduled for site final
ESC16-00556 General Inspection9/21/20189/21/20189/21/2018 8:20:20 AM CANC
MIS18-00375 ESC-Conference9/20/20189/21/20189/20/2018 2:29:19 PMANH
Correction notice posted to contact ESC and PW Hillside for permits. No workers or homeowners onsite.