ESC13-01167
| General Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 3:15:49 PM | | PASS |
|
|
|
ESC13-00806
| General Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 3:04:29 PM | | PASS |
|
|
Stockpile/staging area for large home on adjacent lot. Stockpile has been removed and area is now used for contractor parking. No trackout, erosion, or sediment runoff issues observed.
|
ESC13-00918
| General Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 2:56:33 PM | | PASS |
|
|
Large foothills home in progress. Permit is posted with contact information. Stabilized entrance and perimeter silt fence are installed. Some breaches in non-sensitve areas where stockpile has been removed but there is also vegetative barrier. No corrections required.
|
ESC14-00892
| Site Preparation | 9/22/2014 | 9/22/2014 | 9/22/2014 1:38:42 PM | P | PASS |
|
|
New infill sub in Vista neighborhood. Flat, low risk site with no MS4 infrastructure or surface water within 100 yards of project.
Construction entrance is installed and 1-2 foot vegetated buffer surrounds graded area. Sheet flow is to center of lot. Developer notified work would be last Friday which was approved. No trackout or dust issues at time of inspection.
Approved.
|
ESC14-00413
| Site Preparation | 9/22/2014 | 9/22/2014 | 9/22/2014 11:52:27 AM | P | PASS |
|
|
Grant Phone #: ###-####
Site prep already conducted on 9/9. Two adjacent lots, one is being framed and the other lot is soon to be excavated.
No corrections or issues at time of inspection, just need to continue regular housekeeping.
|
ESC14-00531
| Random Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 11:29:52 AM | A | PASS |
|
|
SFH in progress. Workers staying off adjacent lot and preventing trackout . Permit is posted with contact info, no sediment accumulations in gutter. Site is looking good.
|
ESC14-00045
| General Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 11:24:41 AM | | PASS |
|
|
Wattles have temporarily removed for foundation work to be performed. No sediment runoff or issues at time of inspection. When activity along sidewalk is complete, perimeter BMP or slope/bank stabilization should be implemented.
|
ESC14-00282
| General Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 11:18:44 AM | | PASS |
|
|
Permit posted. Vertical construction in progress. BMPs installed are vehicle tracking pad and DI protection for MS4. No discharges or other violations observed.
|
ESC13-01159
| Random Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 10:42:11 AM | A | PASS |
|
|
Peppermil Estates currently inactive. Permit and NOI posted at entrance, portapot staked down, construction fencing surrounding the drainage swale in progress. No trackout or sediment on roads.
No corrections at this time.
|
ESC12-01148
| Aging Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 10:31:17 AM | | PASS |
|
|
No activity. Plans were just resubmitted for HVAC on BLD permit. No trackout, sediment, or uncontained trash. Sidewalk is above grade of dirt so acts as perimeter protection.
|
ESC13-01285
| BMP Violation | 9/18/2014 | 9/22/2014 | 9/22/2014 9:57:24 AM | A | FAIL |
|
|
Check on condition of Shoup Street. Left message with Jim to have a sweeper/cleanup over the weekend.
Observations:
No sweeping or cleanup performed. 2nd CN issued verbally to have a sweeper ordered for this week. No rain forecasted and self contained, but very messy with sediment and construction materials.
|
ESC13-00597
| Aging Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 9:22:08 AM | | PASS |
|
|
|
ESC14-00283
| General Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 8:52:30 AM | | PASS |
|
|
|
ESC12-00741
| Aging Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 8:38:16 AM | | PASS |
|
|
Excavation and earth work on the St. Al's ER is complete. Interior work and finishing touches on the exterior are in progress. No violations observed.
|