ESC16-00389
| Aging Inspection | 9/22/2016 | 9/22/2016 | 9/28/2016 8:29:08 AM | | CANC |
|
|
|
ESC16-00207
| Aging Inspection | 9/22/2016 | 9/22/2016 | 9/28/2016 8:28:59 AM | | CANC |
|
|
|
ESC15-01437
| Site Final | 9/8/2016 | 9/22/2016 | 9/26/2016 7:46:01 AM | P | CANC |
|
|
|
ESC16-00088
| General Inspection | 9/22/2016 | 9/22/2016 | 9/26/2016 7:45:48 AM | | CANC |
|
|
|
ESC15-00857
| General Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 4:25:19 PM | | PART |
|
|
Road through sub is near full completion and connection to stormwater system. No trackout, dust issues or new erosion rills or runoff spots observed.
Correction:
- clean up waste stockpiles around the cement washout area.
|
ESC14-01063
| General Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 4:23:38 PM | | PASS |
|
|
No SFH or subdivision acitivitiy. BMPs (wattles, silt fence, and DI bags) are currently in decent operating condition. No corrections at this time.
|
ESC16-00310
| BMP Violation | 9/20/2016 | 9/22/2016 | 9/22/2016 3:38:21 PM | A | CANC |
|
|
|
ESC15-00547
| BMP Violation | 9/20/2016 | 9/22/2016 | 9/22/2016 3:38:01 PM | A | CANC |
|
|
Follow up inspection
compliance date extended to 9/23. Clean up in progress per RP
|
ESC15-01004
| General Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 3:14:28 PM | | CANC |
|
|
rescheduled
|
ESC16-00255
| Aging Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 12:28:08 PM | | PASS |
|
|
WIP. Not yet landscaped around edges and back side. Park Place BMPs installed including DI bags, trash containement, and designated washout container.
Correction request to RP to have staging area across street cleaned up (waste materials moved, dried washout piles) to prevent further dumping and misuse of washout that is provided.
|
ESC16-00274
| Aging Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 12:27:58 PM | | PART |
|
|
WIP. Not yet landscaped around edges and back side. Park Place BMPs installed including DI bags, trash containement, and designated washout container.
Correction request to RP to have staging area across street cleaned up (waste materials moved, dried washout piles) to prevent further dumping and misuse of washout that is provided.
|
ESC16-01109
| Site Preparation | 9/21/2016 | 9/22/2016 | 9/22/2016 12:20:04 PM | A | PASS |
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
Permits posted. All inlets in Park Place have sediment filter bags. Concrete washout located across street and is a portable bin. Trash contained. RP on site daily.
|
ESC16-00945
| Site Preparation | 9/22/2016 | 9/22/2016 | 9/22/2016 12:14:35 PM | P | PASS |
|
|
JD Phone #: ###-####
Yellow ESC permit sign and CGP tracking # posted. Construction entrance installed in addition to existing apron. Silt fence has been installed below entire site to protect the existing homes and surround the retaining wall work area. Large lined concrete washout provied.
Approved for construction. RP Justin will be on site through construction.
|
ESC16-01103
| Site Preparation | 9/21/2016 | 9/22/2016 | 9/22/2016 12:00:14 PM | A | PASS |
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
|
ESC16-01110
| Site Preparation | 9/21/2016 | 9/22/2016 | 9/22/2016 11:59:57 AM | A | PASS |
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
|
ESC16-01260
| Site Preparation | 9/21/2016 | 9/22/2016 | 9/22/2016 11:49:29 AM | A | PASS |
|
|
Brad Phone #: ###-####
Approved for construction. Subdivision BMPs installed.
|
ESC16-01111
| Site Preparation | 9/21/2016 | 9/22/2016 | 9/22/2016 11:28:54 AM | A | PASS |
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
|
ESC16-00849
| Site Preparation | 9/21/2016 | 9/22/2016 | 9/22/2016 11:22:59 AM | A | PASS |
|
|
Chris Phone #: ###-####
ESC permit sign posted, SWPPP on site. Perimeter silt fence installed around entire parcel. Slope interuption wattle installed at fence line per plan. No equipment on site, excavator to install rock construction entrance. Active project at end of street already has inlet protection.
Former drainage system of house has caused a large gulley just below the fence within property. Alerted PW hillside engineer .
Project manager Chris stated he will have geotech look at it too.
|
ESC16-00353
| General Inspection | 9/21/2016 | 9/22/2016 | 9/22/2016 10:52:47 AM | A | PASS |
|
|
|
ESC16-00953
| General Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 10:40:08 AM | A | PASS |
|
|
No activity at time of inspection. Clean site. BMPs installed : permit sign, inlet protecton on Clubview and at end of Cave culdesac. Concrete washout was utilized. No spills. Silt fence installed to prevent loose dirt from transporting to neighbors yard. No loose trash or debris. Site is in compliance.
|
ESC16-00094
| General Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 10:32:34 AM | | PASS |
|
|
Home complete, occupied and landscaped. No temp BMP removal required due to active SFHs in progress in Somerset Village. All permits finaled.
|
ESC16-00094
| DOC - Permit Finaled | 9/22/2016 | 9/22/2016 | 9/22/2016 10:31:17 AM | P | PASS |
|
|
|
ESC15-01210
| General Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 10:23:57 AM | A | PASS |
|
|
Post rainfall inspection. Light rain overnight. New application of hydroseed tacifier has been installed over the previous temporory application.
Perimeter and slope interuption wattles are in good condion. No erosion rills or sediment runoff observed. Storm drain sediment bags did capture some sediment/sand from roadway but have plenty of capacity.
No SFHs yet, will continue to monitor BMP performance.
|
ESC16-01293
| Site Preparation | 9/21/2016 | 9/22/2016 | 9/22/2016 10:06:32 AM | A | PASS |
|
|
Rader Phone #: ###-####
Permit sign posted on fence by site access off Heron. Boards installed to protect sidewalk. Large concrete washout is onsite for cement and liquid wash-out. Gator guard wattle on site to install at end of each day along sidewalk. No inlet control required at this time. Site manager Rader and excavator have RP training. Approved.
|
ESC16-00398
| Aging Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 8:45:31 AM | | PASS |
|
|
|
ESC15-01504
| General Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 8:02:41 AM | | PASS |
|
|
SFH demo complete. New home being built, covered under ESC15-01368. WIP
|
ESC15-01504
| DOC - Permit Finaled | 9/22/2016 | 9/22/2016 | 9/22/2016 8:01:44 AM | P | PASS |
|
|
|
ESC15-00306
| General Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 7:55:26 AM | | CANC |
|
|
|
ESC15-01532
| General Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 7:53:47 AM | | PEND |
|
|
Project complete, need to remove sediment filter bags from all MS4 drop inlets, Email sent to Parks n Rec and CPC RP
|
ESC15-00033
| General Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 7:46:46 AM | | CANC |
|
|
|