PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, September 22, 2017
.
Number of inspections:
29
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC16-00288
Site Final
9/19/2017
9/22/2017
9/28/2017 2:24:49 PM
P
CANC
ESC16-01232
BMP Violation
9/19/2017
9/22/2017
9/28/2017 10:52:32 AM
A
CANC
fix silt fence, conduct clean up at site
ESC17-01016
General Inspection
9/19/2017
9/22/2017
9/26/2017 2:01:50 PM
A
CANC
make up site prep called in
ESC16-00936
General Inspection
9/22/2017
9/22/2017
9/26/2017 1:56:52 PM
CANC
ESC16-01167
General Inspection
9/22/2017
9/22/2017
9/26/2017 1:56:46 PM
CANC
ESC17-00302
General Inspection
9/22/2017
9/22/2017
9/26/2017 1:55:31 PM
P
DONE
Follow meeting with RP.
Concrete work to be completed next week as well as backfilling. Once backfilled, new perimeter controls and stabilized entrance reconstructed.
In meanwhile will clean gutters and parking area and install rock bag/wattle check dam in valley gutter
ESC16-01375
Aging Inspection
9/22/2017
9/22/2017
9/22/2017 3:31:48 PM
PASS
ESC16-01375
DOC - Permit Finaled
9/22/2017
9/22/2017
9/22/2017 3:31:43 PM
P
PASS
ESC16-01418
Aging Inspection
9/22/2017
9/22/2017
9/22/2017 3:28:51 PM
CANC
ESC16-01551
Aging Inspection
9/22/2017
9/22/2017
9/22/2017 3:28:45 PM
CANC
ESC16-00973
General Inspection
9/22/2017
9/22/2017
9/22/2017 3:28:40 PM
CANC
ESC17-00657
Tracking Control
9/21/2017
9/22/2017
9/22/2017 3:24:32 PM
A
PASS
Follow up to see if trackout is cleaned. approx. 11 AM
DI bag installed on receiving inlet, wheels are now being washed to prevent trackout, and sweeper trucks did operate yesterday on McMullen and within parking lot. Will check on conditions Monday
ESC17-00704
General Inspection
9/22/2017
9/22/2017
9/22/2017 3:22:58 PM
P
PASS
BMPs installled. No trackout or sediment runoff from site.
ESC16-00353
General Inspection
9/22/2017
9/22/2017
9/22/2017 3:22:25 PM
P
PASS
Subdivision BMPs installed. No muddy runoff or trackout. 2 SFHs in progress with ESC permits.
ESC16-01253
General Inspection
9/22/2017
9/22/2017
9/22/2017 3:22:15 PM
CANC
ESC17-00654
Site Preparation
9/22/2017
9/22/2017
9/22/2017 3:21:39 PM
P
PART
WIP. No site preparation inspection requested.
No discharges, some minor trackout (access to site is now blocked off), and silt fence needs repair. Will inspect next week after backfill.
ESC16-01539
Aging Inspection
9/22/2017
9/22/2017
9/22/2017 3:18:58 PM
CANC
ESC16-01545
Aging Inspection
9/22/2017
9/22/2017
9/22/2017 3:18:49 PM
CANC
ESC16-01649
General Inspection
9/22/2017
9/22/2017
9/22/2017 3:18:44 PM
CANC
ESC17-01091
Site Preparation
9/22/2017
9/22/2017
9/22/2017 2:12:15 PM
P
PART
Permit sign posted. Perimeter wattles installed. NO sediment or other material running offsite. Need to remove DI bag uphill from site and install on the storm drain below site.
ESC16-01707
Site Final
9/22/2017
9/22/2017
9/22/2017 2:09:37 PM
P
PASS
Home complete and landscaped. No corrections required, ESC permit finaled.
ESC15-01543
Site Final
9/22/2017
9/22/2017
9/22/2017 2:08:53 PM
P
PASS
Consturction complete. Onsite swale installed and sod has been laid for stabilization. DI bag to be removed by Jayo upon completion of the last unit in this phase of Somerset. No further ESC inspections required.
ESC17-00954
General Inspection
9/22/2017
9/22/2017
9/22/2017 2:06:59 PM
P
PASS
post rainfall inspection.
No activity. No discharges from site. Will address next phase corrections next week...
ESC17-00302
BMP Violation
9/22/2017
9/22/2017
9/22/2017 11:10:33 AM
A
FAIL
Need more sediment protection in culdesac valley gutter and employee parking area. Lots of loose mud. Inadequate construction entrance.
Muddy discharge.
Verbal correction request & warning to RP Dan to install rock bag check dam/wattle around site to try and retain and filter sediment in the stormwater in the gutter.
Will follow up. VM left
ESC16-01233
General Inspection
9/22/2017
9/22/2017
9/22/2017 11:06:26 AM
CANC
ESC16-01334
General Inspection
9/22/2017
9/22/2017
9/22/2017 11:06:12 AM
PASS
No discharges or trackout. Trash contained. No corrections for North Hill subdivision
ESC16-01335
General Inspection
9/22/2017
9/22/2017
9/22/2017 11:05:19 AM
PASS
No discharges or trackout. Trash contained. No corrections for North Hill subdivision
ESC16-01333
General Inspection
9/22/2017
9/22/2017
9/22/2017 11:05:00 AM
PASS
No discharges or trackout. Trash contained. No corrections for North Hill subdivision
ESC17-01180
Site Preparation
9/22/2017
9/22/2017
9/22/2017 11:03:58 AM
A
PASS
WIP on demolition project. No trackout, asphalt truck route preserved for hauling out demo materials. DIs on 23rd and 24th @ Fairview have sediment inlet bags installed. Permit sign posted on porta-pot