ESC16-00315
| Complaint Inspection | 9/22/2016 | 9/23/2016 | 9/28/2016 8:29:32 AM | A | CANC |
|
|
No ESC card posted
|
ESC15-01004
| General Inspection | 9/22/2016 | 9/23/2016 | 9/26/2016 2:44:22 PM | A | PASS |
|
|
Permit sign and SWPPP info posted on Broad Street. Surrounding inlets have filter bags installed. No trackout, no fugitive dust issues at time of inspection. No corrections at this time.
|
ESC15-01519
| General Inspection | 9/23/2016 | 9/23/2016 | 9/26/2016 10:10:03 AM | | PASS |
|
|
No trackout. Construction entrances installed. All surround DIs have sediment filter bags installed. No loose trash or debris around perimeter. Approved.
|
ESC16-00242
| General Inspection | 9/20/2016 | 9/23/2016 | 9/26/2016 7:47:23 AM | P | CANC |
|
|
|
ESC16-00361
| General Inspection | 9/23/2016 | 9/23/2016 | 9/26/2016 7:46:40 AM | | CANC |
|
|
|
ESC16-00326
| Aging Inspection | 9/23/2016 | 9/23/2016 | 9/26/2016 7:46:30 AM | | CANC |
|
|
|
ESC14-00296
| General Inspection | 9/23/2016 | 9/23/2016 | 9/26/2016 7:46:20 AM | | CANC |
|
|
|
ESC16-00386
| Aging Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 4:39:20 PM | | CANC |
|
|
|
ESC16-00263
| Site Preparation | 9/23/2016 | 9/23/2016 | 9/23/2016 4:39:08 PM | P | PASS |
|
|
Clint Phone #: ###-####
|
ESC16-00999
| Site Preparation | 9/23/2016 | 9/23/2016 | 9/23/2016 4:14:29 PM | P | PASS |
|
|
Joey Phone #: ###-####
Active work in on the Blvd is in compliance. New site permits posted. Existing BMPs in good condtion. Approved for construction.
|
ESC16-01001
| Site Preparation | 9/23/2016 | 9/23/2016 | 9/23/2016 4:14:12 PM | P | PASS |
|
|
Joey Phone #: ###-####
Active work in on the Blvd is in compliance. New site permits posted. Existing BMPs in good condtion. Approved for construction.
|
ESC16-01002
| Site Preparation | 9/23/2016 | 9/23/2016 | 9/23/2016 4:14:00 PM | P | PASS |
|
|
Joey Phone #: ###-####
Active work in on the Blvd is in compliance. New site permits posted. Existing BMPs in good condtion. Approved for construction.
|
ESC16-01000
| Site Preparation | 9/23/2016 | 9/23/2016 | 9/23/2016 4:13:42 PM | P | PASS |
|
|
Joey Phone #: ###-####
Active work in on the Blvd is in compliance. New site permits posted. Existing BMPs in good condtion. Approved for construction.
|
ESC15-01188
| General Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 4:11:31 PM | | CANC |
|
|
no issues observed early in week during Boulder Heights round. no inspection performed today
|
ESC16-00327
| General Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 4:10:52 PM | P | PASS |
|
|
Site surrounded with perimeter silt fence and security fencing. Controlled access with construction entrance. Permit sign posted. No violations observed.
|
ESC16-00696
| Site Preparation | 9/23/2016 | 9/23/2016 | 9/23/2016 4:05:50 PM | P | PART |
|
|
No trackout or discharges and water truck is on site for dust control.
No ESC sign or swppp posted. No site prep was requested. Warning issued and escalation pending. Voicemail left with RP/developer
|
ESC16-01108
| Site Preparation | 9/23/2016 | 9/23/2016 | 9/23/2016 3:53:19 PM | P | CANC |
|
|
data entry error
|
ESC16-01108
| BMP Violation | 9/21/2016 | 9/23/2016 | 9/23/2016 3:48:35 PM | A | PART |
|
|
Check on track out, construction eneterances--
No activity. No construction entrance installed. Permit sign and SWPPP now installed. No wind blown dust or equipment operating dust.
|
ESC15-00547
| BMP Violation | 9/22/2016 | 9/23/2016 | 9/23/2016 3:35:37 PM | A | PART |
|
|
Some of the corrections have been completed:
- trash was picked up and contained. Full containers were hauled away. - new coir mat sediment filter installed on Ustick MS4 - new sediment filter bag installed on private storm drain in parking lot - some sweeping occured. Significant amount of dirt and material remain.
RP stated further clean up and stockpile removal shall be addressed next week. Will follow up next week.
|
ESC15-01579
| General Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 3:06:22 PM | | PASS |
|
|
No trackout. BMPs installed.
|
ESC16-00228
| Site Final | 9/23/2016 | 9/23/2016 | 9/23/2016 2:39:05 PM | P | PASS |
|
|
Home complete, landscaped and no temp BMP removal necessary. Open lots behind home ready for construction.
All permits finaled.
|
ESC16-00295
| Aging Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 2:29:43 PM | | PASS |
|
|
Home complete, landscaped and cleaned. ESC permit condtions satisfied.
|
ESC16-00295
| DOC - Permit Finaled | 9/23/2016 | 9/23/2016 | 9/23/2016 2:29:20 PM | P | PASS |
|
|
|
ESC14-00989
| General Inspection | 9/21/2016 | 9/23/2016 | 9/23/2016 2:21:00 PM | A | PART |
|
|
correction request follow up
The gutter between site entrance and Eckert was swept as requested and the DI bag in alley cleaned out.
The east side of site and entrance to Sawmill was not swept. Called RP Kevin. He said he will make sure it is cleaned and stated that maintenance man didnt do it due to vehicle parking in the way...
Will follow up next week
|
ESC16-00175
| General Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 2:13:07 PM | | PASS |
|
|
Park lanscaping in progress. RP Jesse on site supervising. BMPs installed; no trackout from parking lot staging area to Clubview
|
ESC14-00657
| Site Final | 9/22/2016 | 9/23/2016 | 9/23/2016 2:06:13 PM | A | NR |
|
|
requested by Zach
Concrete washout pan is still on site and maintained(rented) by Brighton Corp. SFH work by Brighton Homes and Alturas. All lots have been sold.
Brighton Homes RP & crew to perform maitainenance on DI bags next week. Will check back 9/30.
Agreed to keep ESC permit open while the work finishes up. River Heights # 7 is now paved and is connected to this RH #6 now.
No discharges or violations. No wind blown trash on south side of Warm Springs.
|
ESC16-00178
| General Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 12:13:13 PM | | PEND |
|
|
Active landscaping in progress. Sweep up after activity is needed today due to material unloading and trackout. Issued reminder to Amyx construction to have crew sweeep sidewalk, gutter and street.
|
ESC16-00159
| General Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 10:10:28 AM | | PEND |
|
|
SFH construction now in progress. Tahoe Homes and Hunter is in control of BMP maintenance for their activities.
Waiting for schedule for further Warm Springs Creek stabilization and temp BMP removal.
Correction request to Mr. Conger: remove plasic sheeeting used as a outfall dissipator on south side of Parkcenter.
|
ESC16-00275
| Aging Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 9:23:55 AM | | PASS |
|
|
SFH complete but still working on stabilizing, vegetating, and cleaning up the open areas around this block of townhomes
|
ESC16-00396
| Aging Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 8:03:16 AM | | PASS |
|
|
Demolition complete and area stabilized
|
ESC16-00396
| DOC - Permit Finaled | 9/23/2016 | 9/23/2016 | 9/23/2016 7:58:10 AM | P | PASS |
|
|
|
ESC15-00688
| General Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 7:57:09 AM | | PEND |
|
|
project complete. Spoke with developer Justin Toothman about removing DI bags from the private storm drains on 9/22. He stated he will work on gettting a crew to remove them next week. No other corrections remaining
|