PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, September 24, 2019
.
Number of inspections:
14
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-00853
Site Final
9/23/2019
9/24/2019
9/27/2019 12:02:23 PM
P
CANC
ESC18-01289
BMP Violation
9/23/2019
9/24/2019
9/25/2019 8:30:22 AM
A
CANC
ESC19-00106
Site Final
9/24/2019
9/24/2019
9/24/2019 5:30:26 PM
P
PASS
ESC permits KAP improvements have been consolidated under ESC19-00995
ESC19-00995
Site Preparation
9/24/2019
9/24/2019
9/24/2019 5:29:48 PM
P
PASS
Site preparation inspection originally completed under ESC19-00106 on 9/4/2019. All remaining ESC inspections for this project will be under this permit.
Project walk through and BMP overview.
Project inlcudes renovating grassy areas into pollinator/native plant gardens, building new elevated boardwalk in the SE corner of park, new pond overlook features, railing installation and painting. Ponds are in process of draining so work around banks, bridges and overlooks will be dry.
Grassy areas will be tilled and then re-planted, no removal of topsoil. Most areas area surrounded by 50' buffers to any surface waters.
BMPs installed:
- SWPPP binder and permit billboard sign on site.
- Parking lot storm drainage curb cuts have sediment protection installed.
- Above ground concrete washout to be staged prior to any concrete placement
- Requested that drip pans and/or spill kits be used and available in equipment parking areas
- Additional sediment controls will be installed after earth disturbance as needed.
- Site will conduct SWPPP inspections at a 2 week frequency and post significant rainfall events.
Approved for construction.
ESC17-01491
General Inspection
9/24/2019
9/24/2019
9/24/2019 5:22:57 PM
CANC
ESC17-00774
General Inspection
9/24/2019
9/24/2019
9/24/2019 5:22:49 PM
CANC
ESC18-01255
General Inspection
9/24/2019
9/24/2019
9/24/2019 5:22:43 PM
P
FAIL
Concrete pump trucks are leaking oils and other materials onto 5th street and do not have drip pans or spill kits.
Notified RP Adam with ESI and called Parnell w/ Brundage Bone. He stated his mechanic will be focusing on the two trucks that are going to the site and will make sure they have drip pans/spill absorbent.
Follow up scheduled.
ESC18-00783
Complaint Inspection
9/24/2019
9/24/2019
9/24/2019 5:22:31 PM
P
FAIL
Concrete pump trucks are leaking oils and other materials onto 5th street and do not have drip pans or spill kits.
Notified RP Adam with ESI and called Parnell w/ Brundage Bone. He stated his mechanic will be focusing on the two trucks that are going to the site and will make sure they have drip pans/spill absorbent.
Follow up scheduled.
ESC18-01408
General Inspection
9/24/2019
9/24/2019
9/24/2019 9:02:32 AM
CANC
rescheduled for site final
ESC18-01093
Aging Inspection
9/24/2019
9/24/2019
9/24/2019 8:29:14 AM
CANC
ESC18-01300
Aging Inspection
9/24/2019
9/24/2019
9/24/2019 8:29:08 AM
CANC
ESC18-01300
DOC - Permit Finaled
9/24/2019
9/24/2019
9/24/2019 8:29:02 AM
P
PASS
BLD permit open w/ no activity since sept. 2018. No ESC issues, permit closed
ESC18-01428
Aging Inspection
9/24/2019
9/24/2019
9/24/2019 8:28:26 AM
CANC
rescheduled for site final
ESC18-01427
Aging Inspection
9/24/2019
9/24/2019
9/24/2019 8:28:17 AM
CANC
rescheduled for site final