ESC15-01225
| BMP Violation | 9/25/2015 | 9/25/2015 | 9/25/2015 4:21:35 PM | P | PART |
|
|
no hillside BMPs and dirt tossed down hill - RP stated would be stockpiled on the flat vegetated portion of yard....
Verbal warning to install wattles below excavated and dumped dirt on the hillside. RP stated JH Developer instructed them to place dirt there and compact and re-seed. Will check for BMP installation Monday.
|
ESC15-00338
| Aging Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 4:19:52 PM | | PASS |
|
|
Home complete, cleaned, and stabilized. ESC permit conditions satisfied.
|
ESC15-00338
| DOC - Permit Finaled | 9/25/2015 | 9/25/2015 | 9/25/2015 4:19:32 PM | P | PASS |
|
|
|
ESC15-00464
| Aging Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 3:08:21 PM | | PASS |
|
|
Stairway and remodel work complete. Site cleaned and stabilized. All permits finaled.
|
ESC15-00464
| DOC - Permit Finaled | 9/25/2015 | 9/25/2015 | 9/25/2015 3:07:00 PM | P | PASS |
|
|
|
ESC13-00213
| General Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 3:02:21 PM | | CANC |
|
|
|
ESC15-00729
| Conference | 9/25/2015 | 9/25/2015 | 9/25/2015 2:52:14 PM | P | PASS |
|
|
Harris Ranch North project update:
- No trackout at site to Barber Dr, permit and SWPPP info posted, silt fence along bottom of site is containing sediment. No significant fugitive dust issues observed or reported to date. Syman Co. inspects the upper portions development on Tuesdays, scheduled to ride-a-long next week.
Discussion with Chad Hamel with Hunter Homes to get update: - dewatering and compaction water is being stored in a pond above Barber Dr. Area is surrounded by silt fence. Future water tank is scheduled to be built this winter.
- Graded hillsides are compacted and tracked perpendicular to slope contours. Syman Co is to install wattles incrementally on the cut hillsides, which will be hydroseeded/tacified in this fall.
Project got approval from Army Corps to install box culvert in Squaw Creek/ Council Springs for stormwater drainage. Currently area delineated by silt fence. SF will be removed and work will begin in area next. HH to submit copy of 404 permit permission to City ESC.
No corrections at this time.
|
ESC15-00477
| BMP Violation | 9/25/2015 | 9/25/2015 | 9/25/2015 2:27:25 PM | P | FAIL |
|
|
Follow up inspection of clean up and BMP installation in response to CN 9/24:
Reinspected site at 1:30 PM with ESC Coordinator. Observations:
- silt fence was installed along edge of pavement, but was not properly trenched in. Notified installer to come fix and make sure it is not loose at bottom - no sweeping of sidewalk or road had been completed at time of inspection. Loose dirt, rocks, broken gravel bags, and fine material from stucco washout were not cleaned up.
At end of inspection, Curtis Clean Sweep truck arrived. I coordinated moving worker vehicles, removed gravel bags from gutter, and swept sidewalk to ensure the site would get cleaned up.
Corrections needed: 1. Provide stucco contractor a washout container 2. Have portapot company move toilet off sidewalk and at minimum 50 ft away from stormdrain. Currently located directly next to stormdrain, not staked down. Spill risk. 3. Finish sweeping sidewalk 4. Install construction entrance or fence off access to vehicles to prevent track out 5. Weekly housekeeping and stormwater pollution prevention should now occur at least 1x per week till end of project.
Spent nearly 1 hour at site. Re-inspection fee $55 assessed to Syringa Homes.
|
ESC14-00809
| General Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 11:50:57 AM | | PASS |
|
|
WIP. Minimal trackout from unpaved slope driveway is being sweeping periodically. Workers parking on the street. No fugitive dust observed, working on the frame. Approved.
|
ESC13-00230
| General Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 11:35:29 AM | | PASS |
|
|
5 SFHs currently in progress in RH#5 and 2 open lots. DI bags in subdivision storm drains have been maintained and have remaining capactity. Streets and gutters free of loose sediment or material spills. Lined washout located on Grand Prairie. No corrections at this time.
|
ESC15-01054
| Site Preparation | 9/24/2015 | 9/25/2015 | 9/25/2015 11:08:52 AM | A | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted. Tahoe SFHs on Brookridge are having foundations laid, dirt being stockpiled across street to the east. No trackout. DI bags installed, and lined washout provided. No significant wind blown trash issues at this time.
|
ESC15-00106
| General Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 10:18:13 AM | | PASS |
|
|
|
ESC15-00105
| General Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 9:46:16 AM | | PASS |
|
|
|
ESC15-00347
| Aging Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 9:11:12 AM | | PASS |
|
|
Building demolished and site has been cleaned of debris and sediment. No futher construction. No ESC issues. Permit finaled.
|
ESC15-00347
| DOC - Permit Finaled | 9/25/2015 | 9/25/2015 | 9/25/2015 9:10:09 AM | P | PASS |
|
|
|
ESC15-00330
| Aging Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 8:56:37 AM | | PASS |
|
|
Home complete, materials cleaned up, yard is landscaped/stabilized. Permit conditions satisfied. No temp BMP removal due to ongoing projects in RH#5
|
ESC15-00330
| DOC - Permit Finaled | 9/25/2015 | 9/25/2015 | 9/25/2015 8:55:24 AM | P | PASS |
|
|
|